Scorecard
What the notes expected, and what happened
Hit rate
100%
Met
4
Partly
0
Missed
0
Pending
3214
Numbers are checked automatically each evening once a quarter's results are filed; the rest are judged in the weekly review. Partly counts as half.
Q1 FY27
1 pendingPending (1)
Minda Corpwait · Second cluster plant ready
Project milestone · Auto Related
Q2 FY27
100% hit · 2 met, 0 partly, 0 missed · 1117 pendingAvantelpass · Sale of the Imeds health subsidiary, with receivables and inventory falling
Aerospace defence · actual No sale: the board decided on 18 Sep 2026 to merge Imeds into Avantel instead · judged in review · Stays as rated; receivables and inventory remain the test
Borosilpass · Third double-walled line starts
Project milestone · Consumer Durables · actual Third line slipped to January 2027 (NSE filing, Sep 2026) · judged in review · New date tracked as borosil-hydra-m2
NRB Bearingfollow · No further promoter selling once the pledge is cleared (promoter holding stays at or above 44.7%)
Bearings · actual Promoter group sold about 0.8% more in September 2026; holding about 44% · judged in review · Stays follow
AXISCADES Technologiespass · Aerospace acquisition signed and closed, with its price disclosed
Aerospace defence · actual Bought 90% of Cloud Wave for ₹234cr on 11 Sep 2026 · judged in review · Stays as rated; the deal is done, integration is the test
AXISCADES Technologiespass · Aerospace acquisition signed and closed
Project milestone · Aerospace defence · actual Bought 90% of Cloud Wave for ₹234cr on 11 Sep 2026 · judged in review · Deal closed
Digilogic Systemspass · AGM vote on the proposed family pay (about ₹3.1cr fixed plus up to 8% of profit)
Aerospace defence · actual Family pay approved at the 23 Sep 2026 AGM · judged in review · Stays as rated; the pay question is settled
HDFC Bankown · An RBI-approved new CEO in place before 26 October
Finance · actual RBI approved Anup Bagchi on 1 Oct 2026; MD & CEO from 27 Oct 2026, the day after Jagdishan's term ends · judged in review · Stays own; succession settled on time
Vintage Coffeewait · The promoter pledge released
Food Products · actual All promoter pledges (1.31cr shares, ~8.9% of the company) released 6–8 Oct 2026, a week after Q2 ended · judged in review · Stays wait; the pledge is gone, but free cash is still the test
Zaggle Prepaidwait · A permanent CFO appointed (post filled on an interim basis)
Software · actual Venkatesh Ramachandran joined as Group CFO on 18 May 2026 (NSE filing) · judged in review · Stays wait; the CFO question is closed, cash flow remains the test
Pending (1117)
Aartech Solonicsavoid · A disclosed order book above ₹25cr
Aerospace defence
Aartech Solonicsavoid · A first sizeable defence order beyond trial quantities
Aerospace defence
Aarti Drugsfollow · Operating margin at 14% or better ('14% is quite doable')
Pharma API · expected at least 14%
Aarti Drugsfollow · Volume growth back above 10% as prices ease (Q1: +3.5% against 8–10%)
Pharma API
Aarti Drugsfollow · Formulations back to the ₹90cr-a-quarter run-rate (₹81.6cr in Q1)
Pharma API
Aarti Industriespass · Zone IV complex and Augene joint venture producing revenue
Chemicals
Aarti Industriespass · CRISIL outlook back to Stable (no downgrade)
Chemicals
Aarti Industriespass · First Zone IV products commissioned (MPP, calcium chloride)
Project milestone · Chemicals
Aarti Industriespass · Augene plant commissioned
Project milestone · Chemicals
Aarti Pharmalabswait · Borrowings (₹754cr) contained as Atali Block 2 is built
Pharma CDMO
Accent Microcellfollow · A filing confirming Unit III commercial production
Pharma Others
Accent Microcellfollow · H1 FY27 results (about November) with less low-margin, related-party trading
Pharma Others
Accent Microcellfollow · Receivables falling from ₹91cr
Pharma Others
Accent Microcellfollow · Unit III Phase 1 in commercial production
Project milestone · Pharma Others
Action Const.Eq.follow · Full-year FY27 guidance given, as promised for September (deferred twice)
Vehicles
Action Const.Eq.follow · Operating margin held at the 15–16% target as the June price rise holds against steel
Vehicles · expected at least 15%
Action Const.Eq.follow · Decision on timing of the tower-crane factory
Project milestone · Vehicles
Acutaas Chemicalsfollow · Third battery additive supplying by end-Q2 FY27
Pharma API
Acutaas Chemicalsfollow · A fourth battery contract signed, with capex
Pharma API
Acutaas Chemicalsfollow · Phase 2 capex completed and trial runs started
Project milestone · Pharma API
Acutaas Chemicalsfollow · IndiChem plant capex completed
Project milestone · Pharma API
ADF Foodsfollow · Recovery of the $2.8m court award from Ascot
Food Products
Aditya Birla Lifestyfollow · Revenue grows in double digits, as guided
Retail · expected at least 10%
Aditya Infotechwait · H1 FY27 operating cash turns clearly positive
Industrials
Aditya Infotechwait · Operating margin holds in the guided 14–15% range
Industrials · expected at least 14%
Aditya Infotechwait · No change to the CCTV testing rule that bars Chinese chips
Industrials
Aditya Visionfollow · Operating cycle falls below 90 days (CARE's trigger is 120)
Retail
Ador Weldingown · Operating margin back above 12% (Q1 FY27 11.6%)
Industrials · expected at least 12%
Ador Weldingown · Gross margin recovering from Q1's 36.5%
Industrials
Advait Energyavoid · Operating cash flow catching up with profit
Cables
Advanced Enzymefollow · Operating margin back near 30% in Q2 (27% in Q1)
Pharma Others · expected at least 29%
Advanced Enzymefollow · US sales growth of 8–10% showing up
Pharma Others
Advanced Enzymefollow · Decision on new fermentation capacity
Project milestone · Pharma Others
Aegis Logisticsfollow · Terminal (toll) volumes growing again; management's worst case is +25% a year (Q1 −3%)
Logistics
Aegis Logisticsfollow · Fund-raise not large or cheaply priced
Logistics
Aegis Logisticsfollow · Pipavav LPG pipeline connection and jetty in use
Project milestone · Logistics
Aegis Logisticsfollow · Mumbai tanks commissioned
Project milestone · Logistics
Aegis Vopak Terminalswait · LPG volumes back above 1 million tonnes a quarter
Oil
Aeroflex Industrieswait · A second skid customer or a first export skid order
Iron and Steel
Aeroflex Industrieswait · Operating margin about 23% (guidance)
Iron and Steel · expected at least 23%
Aether Industriespass · Operating cash above 60% of operating profit
Pharma CDMO
Afcons Infrawait · Net working capital falling towards 120 days (about 139–143 now)
Construction
Afcons Infrawait · CRISIL keeps its AA− rating (outlook Negative)
Construction
Affle 3ifollow · About 20% organic revenue growth maintained
Software · expected at least 20%
AGI Greenpacwait · Operating margin holding at 22–24% as HNG's supply returns
Packaging · expected at least 22%
AGI Greenpacwait · A public earnings call with updated guidance (none since January 2026)
Packaging
Ahluwalia Contr.follow · Operating margin back above 8% in Q2 FY27 (Q1: 4.29%)
Construction · expected at least 8%
AIA Engineeringwait · A volume guide given on the Q2 call
Forging
AIA Engineeringwait · Second big mine trial completed and converted
Forging
AIA Engineeringwait · Quarterly volume breaking above the 60,000–65,000-tonne range
Forging
AIA Engineeringwait · Final FY27 capex figure given and a plan for the ₹4,500cr cash pile
Forging
Aimtronwait · H1 FY27 revenue above ₹200cr
EMS & Electronics · expected at least ₹200cr
Aimtronwait · Positive operating cash in H1 FY27
EMS & Electronics
Aimtronwait · H1 FY27 operating margin within the 20–22% guided
EMS & Electronics · expected at least 20%
Airfloa Rail Techno.avoid · Positive operating cash, with the ₹214cr of receivables collected toward the promised 60–70 days
Industrials
Ajanta Pharmawait · Asia sales recovering in Q2 after −16% in Q1
Pharma
Ajanta Pharmawait · No tax demand from the income-tax block assessment
Pharma
Ajax Engineeringwait · Q2 margin near 12% (guided below 12%) and the next price rise passed on as steel climbs
Vehicles
Ajax Engineeringwait · New plant started in H1 FY27, and a plan for the ₹1,119cr of cash
Vehicles
Akums Drugsfollow · Contract (CDMO) margin at the upper end of the 14–15% guide
Pharma CDMO
Akzo Nobelwait · Double-digit volume and value growth (like-for-like), as guided
Consumer Durables
Alembic Pharmawait · India growth back to market pace (~10–11%) under its new head
Pharma
Alicon Castalloywait · Operating margin 11% or more in Q2 FY27 (first of two quarters)
Auto Related · expected at least 11%
Alicon Castalloywait · No more plant bought from promoter company Atlas Castalloy
Auto Related
Alkyl Amineswait · Operating margin above 21% as ammonia normalises (the note expects a fall back to about 18%)
Chemicals · expected at least 21%
Alkyl Amineswait · New ₹120cr Dahej product commissioned and ramping from Q2 FY27
Chemicals
Alkyl Amineswait · New product plant commissioned
Project milestone · Chemicals
All Time Plasticwait · Margin staying above CRISIL's 14% downgrade trigger
Consumer Durables · expected at least 14%
All Time Plasticwait · Bamboo machinery installed
Project milestone · Consumer Durables
Alpex Solarwait · Cell output volumes disclosed with Q2 results, as promised, after the mid-September start
Solar PV Cells EPC
Amagi Media Labspass · Gross margin back towards 69% (guide trimmed to 67–69%)
Software
Amagi Media Labspass · Revenue growth around the ~30% aspiration (32% in Q1)
Software · expected at least 30%
Amagi Media Labspass · Revenue from the new AI products disclosed
Software
Amara Raja Energyfollow · E-Positive research lab starts operations
Project milestone · Auto Related
Amber Enterprisesavoid · Railway margin back to 15–16%, as guided
EMS & Electronics
Anondita Medicarepass · Cash-positive H1 FY27 with debtor days falling
Health Products
Anondita Medicarepass · Assets moved out of the promoter's old proprietorship and advances to promoter firms repaid
Health Products
Anthem Biosciencesfollow · Q2 revenue back above ₹600cr as the promised delivery catch-up arrives
Pharma CDMO · expected at least ₹600cr
Anthem Biosciencesfollow · Indian approval to sell semaglutide ingredient
Pharma CDMO
Anthem Biosciencesfollow · The new big-pharma contract signed
Pharma CDMO
Antony Waste Handfollow · Pune write-down booked within the ₹22–24cr flagged
Utilities
Anupam Rasayanpass · Consolidated operating margin of 22–24%
Chemicals · expected at least 22%
Anupam Rasayanpass · Batam and Bliss investors not bought out with new debt
Chemicals
Apar Inds.wait · Oil profit per kilolitre falling back from Q1's ₹25,482 toward a normal ₹6,000–8,000
Electrical Equipment
Apar Inds.wait · US revenue turning back to growth after Q1's 11.1% fall
Electrical Equipment
Apcotex Indsown · Operating margin stays at 12% or more as crude falls and Q1's windfall unwinds
Rubber · expected at least 12%
Apollo Micro Systemsavoid · Promoter pledge (about 39%) actually falling
Aerospace defence
Apollo Pipesavoid · Double-digit revenue growth in Q2, as promised
Plastics · expected at least 10%
Apollo Pipesavoid · Stock days falling from 80
Plastics
Apollo Tyresown · A successor to the departing CFO (Gaurav Kumar) is named
Tyres
Archean Chemical Industriespass · A signed renewal of the factory land lease (expired 2018)
Chemicals
Ardee Industriesfollow · Operating margin holds at the guided ~10%, ideally moving back toward FY26's 13%
Mining & Metals Recycle · expected at least 10%
Arihant Superstruct.pass · Cash from the 1,495 certified homes repays debt; net debt falls
Realty
Artemis Medicarefollow · Gurugram occupancy near 70% in Q2 (65.7% group)
Hospitals
Artemis Medicarefollow · Raipur losses staying near ₹20cr before break-even in 15–18 months
Hospitals
Arvind SmartSpacesfollow · Net debt stays within India Ratings' ₹800–850cr band
Realty
Ashapura Minechemfollow · Profit per tonne holding at the guided $5.5–6 near term, moving back toward $10
Mining & Metals Recycle
Ashoka Buildconpass · Delhi High Court ruling on the NHAI suspension
Construction
ASK Automotivefollow · Debt stays below half of equity at Q2 FY27
Auto Related
Astra Microwave Productsfollow · QRSAM and Su-30 production orders won
Aerospace defence
Ather Energywait · Company EBITDA stays positive after the PM E-Drive subsidy ended on 31 July (₹9cr in Q1)
Vehicles
Ather Energywait · Market share holding against TVS and Bajaj (slipped to about 16% in August)
Vehicles
Atlanta Electricalsown · The 765 kV technology deal signed
Electrical Transformers
Aurionpro Solutionswait · Operating margin back above 19% (17% in Q1)
Software · expected at least 19%
Aurum Proptechpass · Continuing-operations pre-tax margin above 5%
Platform Cos
Aurum Proptechpass · No further share issues beyond the announced Housing.com deal
Platform Cos
Australian Premwait · Pump receivables (about ₹160cr) come down in H1 FY27
Solar PV Cells EPC
Australian Premwait · The new 400 MW module line filling up
Solar PV Cells EPC
Australian Premwait · Wholesale module margins within the 7–9% guide
Solar PV Cells EPC
Australian Premwait · New 400 MW line running
Project milestone · Solar PV Cells EPC
Auto.Axlefollow · A new truck-maker or Cummins export contract
Auto Related
Avalon Techfollow · Size and funding of the Chennai land purchase disclosed
EMS & Electronics
Avalon Techfollow · Commercial production starts at the new Chennai plant
Project milestone · EMS & Electronics
Avantelpass · Quarterly revenue above ₹80cr
Aerospace defence · expected at least ₹80cr
Avantelpass · Operating margin above 24%
Aerospace defence · expected at least 24%
Avantelpass · Vijayawada plant inaugurated
Project milestone · Aerospace defence
Avanti Feedswait · A clear explanation of the ₹420cr of related-party sales
Food Products
Awfis Space Solutionsfollow · Mature-centre occupancy back above 84%
Commercial Services
Awfis Space Solutionsfollow · 12,000-plus new seats live in H1
Project milestone · Commercial Services
AXISCADES Technologiespass · Both phases of the Akkodis sale proceeds actually received on the new dates
Aerospace defence
AXISCADES Technologiespass · Retained business reporting a margin in the mid-teens (4.7% now), covering interest and depreciation
Aerospace defence
AXISCADES Technologiespass · No new one-off provisions: reported and "normalised" operating profit within about ₹3cr of each other (the Q1 gap was ₹13.1cr, of which ₹9.62cr was a provision on an aged defence receivable)
Aerospace defence
AXISCADES Technologiespass · Figures on the call and in the presentation agree (in Q1 the CFO said XiDA margin 33%, defence operating profit ₹13cr and phase 2 proceeds about ₹525cr; the slides said 29.7%, ₹11.2cr and ₹718cr)
Aerospace defence
Azad Engineeringwait · Operating margin within the 32–35% guide
Aerospace defence · expected at least 32%
Bajaj Consumer Carewait · Operating margin holding above 21% through the costlier second quarter
Consumer Durables · expected at least 21%
Bajaj Electricalspass · Revenue growth reaching 8% in Q2 FY27
Consumer Durables · expected at least 8%
Bajaj Electricalspass · Trade credits (₹1,508cr of factoring and vendor finance) falling
Consumer Durables
Bajaj Healthcarewait · Operating margin inside the 18–20% guide (17.5% filed in Q1)
Pharma API · expected at least 18%
Balaji Amineswait · Volumes back above 27,000 tonnes a quarter
Chemicals
Balaji Amineswait · Operating margin holding above 20% as raw-material prices fall (guide 22–23%)
Chemicals · expected at least 20%
BASF Indiapass · Operating margin above 6% once the war windfall fades
Chemicals · expected at least 6%
Basilic Fly Studiopass · Aged receivables (about ₹44cr older than six months) cleared by H1 FY27, as management said
Media and Entertainment
Belrise Industriespass · Related-party purchases and sales shrinking after the merger
Auto Related
Belrise Industriespass · Guarantees for promoter companies released
Auto Related
Belrise Industriespass · Operating margin 'broadly stable' at about 12%
Auto Related · expected at least 12%
Belrise Industriespass · First Bengaluru programmes start production
Project milestone · Auto Related
Beta Drugspass · CRISIL completes its review (it was awaiting information from the company)
Pharma
Beta Drugspass · H1 FY27 exports reaching about ₹55cr
Pharma
Beta Drugspass · The EU audit actually takes place
Pharma
Birlasoftfollow · Operating margin at or above 15% after the July wage rise, as guided
Software · expected at least 15%
BlackBuckfollow · Pre-tax profit growth returning (fell 8% in Q1 on device depreciation)
Platform Cos
BLS Internationalown · Visa application volumes growing again (flat in Q1) from the new Slovakia, Cyprus and China mandates
Travel Services
BLS Internationalown · Revenue growth within the 15–20% target (Q1 was +25%, helped by acquisitions)
Travel Services · expected at least 15%
BLS Internationalown · Visa margin held near 40% and digital near 7–8%, tax rate about 12%, as guided
Travel Services
BLS Internationalown · All three rollout phases complete
Project milestone · Travel Services
Blue Jet Healthcarewait · Revenue growth on the year returning in Q2 FY27 (FY26 −8%; Q1 −17%)
Pharma API · expected at least 0%
Blue Jet Healthcarewait · First phase of the R&D centre operating
Project milestone · Pharma API
Borosilpass · The Finance Ministry notifies the anti-dumping duty on Chinese borosilicate glass
Consumer Durables
Borosilpass · Operating margin of 17–18% in Q2 FY27 as price rises and the bottle plant land
Consumer Durables · expected at least 17%
Borosilpass · Stock days (282) and net debt (₹99cr) falling
Consumer Durables
Borosil Renewablesfollow · Quarterly revenue of ₹400–410cr (guidance)
Industrials · expected at least ₹400cr
Borosil Renewablesfollow · Operating margin of 30–33% (guidance)
Industrials · expected at least 30%
Borosil Renewablesfollow · No dilution of the anti-dumping or countervailing duties on imported solar glass
Industrials
Brainbees Solutionswait · India gross margin recovers most of its 260-basis-point fall
Retail
Caliber Mining & Logwait · Operating margin back to the normal 23% (Q1: 17%)
Mining & Metals Recycle · expected at least 23%
Camlin Fineavoid · New capital raised without equity at a deep discount
Chemicals
Capillary Technologiesfollow · KPMG forensic review and insurance claim on the ₹33.4cr fraud closing without new findings
Software
Capillary Technologiesfollow · Organic net revenue retention back to 115% (blended 113%)
Software
Caplin Point Labsfollow · Debtor days falling back towards 120 at the half-year
Pharma
Carborundum Univer.follow · Abrasives margin above 9% without one-offs (guide 9.5–10%)
Industrials
Carraro Indiafollow · Operating margin excluding other income back above 10%
Auto Related · expected at least 10%
Carraro Indiafollow · Exports recover from Q2 FY27 (they fell 14% in Q1)
Auto Related
Cartrade Techown · Operating margin above 31% in Q2, as guided for Q2–Q4
Platform Cos · expected at least 31%
Cartrade Techown · A dividend or buyback policy for the ₹1,321cr of cash
Platform Cos
Cartrade Techown · Disclosed revenue from Elite Buyer and the Spinny deal
Platform Cos
Carysilfollow · Stock days starting to fall from 319
Consumer Durables
Carysilfollow · Quartz-sink volume growth back above 15% in Q2 once delayed containers ship
Consumer Durables
CCL Productsown · Operating profit per kilo holding at ₹135–140 as freeze-dried grows
Food Products
CE Info Systemspass · Debtor days falling back from 136
Software
CE Info Systemspass · Tracker/IoT subscription revenue growing faster than device sales (and above 25%)
Software
CE Info Systemspass · Operating margin of 35% plus, as guided
Software · expected at least 35%
CEATfollow · Camso customers 90% moved from Michelin by September
Tyres
CEATfollow · CARE's leverage measure stays below its 2.5-times downgrade trigger (2.34 times now)
Tyres
CEATfollow · About 90% of Camso customers moved from Michelin
Project milestone · Tyres
Ceigall Indiawait · Operating cash turning positive (negative for five years)
Construction
Ceinsys Techpass · The two pending large state orders won; Q2 order inflow above FY26's full-year ~₹350cr, as promised
Software
Cello Worldwait · Volume growth in the Q2 festive quarter (Q1 sales were flat)
Consumer Durables
Cello Worldwait · New guidance numbers given, as promised for next quarter
Consumer Durables
Cemindia Projectsfollow · Margin '10% plus' as guided
Construction
Centum Electronicswait · Lease terms disclosed for the new plant on promoter-group land
EMS & Electronics
Century Plyboards(I)wait · MDF margin back above 12% (7.0% in Q1)
Consumer Durables
Cera Sanitarywarefollow · Operating margin back at 13–15% in Q2 FY27 (10.1% in Q1)
Consumer Durables · expected at least 13%
Chalet Hotelsfollow · Promoter pledge (31.9% of their shares) getting smaller
Hotels and Travels
Chalet Hotelsfollow · Office rent reaching ₹30–32cr a month (raised target; ₹29cr in June)
Hotels and Travels
Chambal Fert & Chemfollow · Promoter pledge (23% of promoter shares) falling
Agrochemical & Fertilizers
Chembond Chemicalswait · Receivables growing slower than sales (debtor days below 128)
Chemicals
Chemplast Sanmaravoid · Strategic review separates or sells the loss-making PVC subsidiary
Chemicals
CIE Automotiveown · India revenue growth back at or above its weighted market in July–September
Auto Related
CIE Automotiveown · US machined-casting order shipping (a quarter later than first said)
Project milestone · Auto Related
Clean Sciencewait · Operating profit clearly above ₹100cr a quarter (Q1 was flat at ₹96cr)
Chemicals · expected at least ₹100cr
Clean Sciencewait · Standalone (older products) volumes growing again
Chemicals
CMR Green Techwait · Profit per kg holding at the ₹12 now guided (₹12.4 in Q1)
Mining & Metals Recycle
CMR Green Techwait · Debt-to-equity back toward 0.5
Mining & Metals Recycle
CMS Info Systemsown · Public-sector bank price rises agreed by end-Q2 FY27
Commercial Services
CMS Info Systemsown · Banknote supply back to normal and ATM transactions recovering by end-Q2 FY27
Commercial Services
Cohance Lifesciencesavoid · Q2 recovery arriving as guided, with the second destocked molecule reordering
Pharma CDMO
Cohance Lifesciencesavoid · Promoter releases its 94.6% pledge alongside a real recovery
Pharma CDMO
Cohance Lifesciencesavoid · Clean FDA outcomes at its four flagged sites
Pharma CDMO
Concord Biotechfollow · Inventory days falling back towards 300 while sales grow (485–493 days now)
Pharma API
Concord Biotechfollow · Injectables plant above 30% use (5% now)
Pharma API
Concord Controlwait · H1 FY27 operating cash turns positive (FY26 was −₹55cr)
Industrial - Railway
Concord Controlwait · Receivable days fall below 150
Industrial - Railway
Concord Controlwait · H1 FY27 revenue growth of 40–50% (guidance for each of the next 3–5 years)
Industrial - Railway · expected at least 40%
Control Printwait · Italian packaging loss falling toward €1.5m a year (₹25.2cr lost in FY26)
Hardware
Control Printwait · Core (standalone) growth back to 10–15% after the price rise (Q1: +4.2%)
Hardware
Corona Remediesfollow · Gross margin holds within about 100 basis points as dearer raw materials arrive in Q2
Pharma
Corona Remediesfollow · Wokadine returning to growth
Pharma
Cosmic CRFwait · Tribunal approval of the Amzen purchase and a funding plan without new shares
Industrial - Railway
Cosmic CRFwait · H1 FY27 operating cash positive and receivables (₹205cr) falling
Industrial - Railway
Cosmic CRFwait · Springs sold to wagon builders under the new approval at a better margin
Industrial - Railway
Cosmo Firstfollow · Plain BOPP contribution holding above ₹20 a kilo as new lines start
Packaging
Craftsman Automationwait · No further equity raise or promoter selling
Auto Related
Craftsman Automationwait · Decision on Phase 2 of the stationary-engine project (by September 2026)
Project milestone · Auto Related
Crompt.Greaves Cons.follow · Operating margin above 11% in Q2 FY27 (first of two quarters needed)
Consumer Durables · expected at least 11%
Crompt.Greaves Cons.follow · Fan share holding after the Q1 stock-outs
Consumer Durables
Cyientwait · Energy and mining unit stabilising (recovery promised within 2–3 quarters)
Software
Cyient DLMwait · Operating margin reaching the promised 11–13% (current guide 10–11%)
EMS & Electronics · expected at least 11%
Cyient DLMwait · Revenue growth in every quarter, as guided
EMS & Electronics · expected at least 0%
Cyient DLMwait · Working capital falling from 161 days toward 120
EMS & Electronics
Cyient DLMwait · First AI-hardware and robotics orders
EMS & Electronics
Datamatic Global Serfollow · Order-book figure disclosed, as promised twice
Software
Datamatic Global Serfollow · Organic revenue growth about 8% as guided (9.9% in Q1)
Software · expected at least 8%
Datamatic Global Serfollow · Call-centre revenue growing again; TruAI and KAiBRE producing named revenue
Software
DCWpass · Basic chemicals back in profit in Q2 FY27
Chemicals
DDev Plastiksown · Cash cycle back towards 60 days
Chemicals
Deep Industriesown · Rest of the Prabha Energy (promoter company) loan repaid by the end of Q2 FY27
Oil
Deep Industriesown · Standalone Indian revenue growing again from about ₹175cr a quarter
Oil
Deepak Fert & Petrowait · Gopalpur and Dahej plants started by the end of Q2 FY27, as the call promised (annual report says H2 FY27)
Chemicals
Deepak Fert & Petrowait · Net debt falling from ₹4,719cr
Chemicals
Deepak Fert & Petrowait · An end to promoter-linked financing
Chemicals
Deepak Nitritewait · Polycarbonate project cost (₹11,500cr) and H2 FY29 timeline holding
Chemicals
Delhiverywait · Corporate overheads falling below 9% of revenue
Logistics
Dhanuka Agritechwait · Sales growth returning in Q2 after the 12.6% Q1 fall (guide cut to low single digits)
Agrochemical & Fertilizers · expected at least 0%
Dhanuka Agritechwait · Dahej losses narrowing
Agrochemical & Fertilizers
Dhoot Transmissionpass · Operating margin holds at 15–16% as copper settles
Auto Related · expected at least 15%
Dhoot Transmissionpass · Promoter-level share pledge released
Auto Related
Diffusion Engineersfollow · Debtor days falling from 115 toward 90
Industrials
Digilogic Systemspass · ₹100cr-plus of orders promised by September, visible in the H1 FY27 results
Aerospace defence
Digitide Solutionspass · Quarterly bookings back above ₹500cr (₹205cr in Q1)
Software
Digitide Solutionspass · Wage-code costs passed through to clients
Software
Dilip Buildconwait · Standalone margin of 10–12% as guided
Construction
Dishman Carbogen (Carbogen Amcis)avoid · The CHF 200m promoter loan arrives and quarterly interest falls to ₹35–40cr
Pharma CDMO
Dishman Carbogen (Carbogen Amcis)avoid · Covenant waivers closed and the slipped CHF 10m order arrives
Pharma CDMO
Divgi Torqtransferpass · Operating margin at '20–22% and above' once the Indonesian order fades
Auto Related · expected at least 20%
Divgi Torqtransferpass · A signed technology deal for automatic transmissions
Auto Related
Dr Agarwal's Health Carewait · Same-store (mature centre) growth staying above 12%
Hospitals
Dr Agarwal's Health Carewait · 12 more centres opened in Q2
Project milestone · Hospitals
Dynamic Cablesown · Order book moving above ₹811cr
Cables · expected at least ₹812cr
Dynamic Cablesown · Operating margin holding above 10% (guide 10.5–11%)
Cables · expected at least 10%
Dynamic Cablesown · Repeat orders from US distributors after the first shipments
Cables
Dynamic Cablesown · Reengus plant commissioned
Project milestone · Cables
E2E Networksfollow · Q2 shows the Q1 profit (₹43.9cr) is repeatable
Software · expected at least ₹43.9cr
E2E Networksfollow · Operating margin stays near the ~70% long-term aim (75% in Q1), which management calls sustainable
Software · expected at least 70%
EFC (I)wait · Operating cash conversion and debtor days improving in the H1 cash flow
Commercial Services
Elecon Engg.Cofollow · Q2 converts the record ₹1,518cr order book without more finished goods slipping past quarter-end
Electrical Equipment
Elgi Equipmentsfollow · Europe stays at breakeven
Pumps Comp & Eng
Ellen. Indl. Gaswait · An onsite contract win above 600 tonnes a day
Chemicals
Ellen. Indl. Gaswait · No more investment write-downs
Chemicals
Emmvee Photovoltaic Power Ltdfollow · Quarterly operating profit above ₹600cr (about ₹617cr a quarter needed for the FY27 target; best so far ₹571cr)
Solar PV Cells EPC · expected at least ₹600cr
EMS Limitedavoid · Promoter pledged shares falling (14.5% in August; zero was promised)
Utilities
eMudhrawait · The 3i Infotech claim (₹128cr-plus) resolved or provided for
Software
eMudhrawait · Trust-services revenue recovering after token recertification (−3% in Q1)
Software
eMudhrawait · Operating margin around the ~25% guided
Software · expected at least 25%
Engineers Indiafollow · Settlement of the ₹86cr HRRL change order and the ₹410cr contractor claim
Construction
Enterofollow · Operating margin holds at the 5% target
Retail · expected at least 5%
Enviro Infra Engine.wait · Operating cash flow positive for the half-year to September, as promised
Utilities
Enviro Infra Engine.wait · Unbilled work days falling from 195 toward the 90-day target
Utilities
Epack Durableavoid · The disputed ₹19.61cr receivable resolved without a write-off
Consumer Durables
Epack Durableavoid · Q2 losses shrinking
Consumer Durables
Epack Durableavoid · Government approves the ₹56.5cr of FY26 PLI money
Consumer Durables
EPack Prefab Techno.follow · Margin back to 10.5% from Q2 FY27 as guided
Construction
EPack Prefab Techno.follow · Location and total investment announced
Project milestone · Construction
Epigralown · Operating margin held in the promised 22–25% band
Chemicals · expected at least 22%
Epigralown · Epoxy and MPP pilot plant commissioned
Project milestone · Chemicals
EPLown · Revenue growth in the 'high teens' for the next few quarters, as guided (raised from 11–13%)
Packaging · expected at least 17%
Eris Lifescienceswait · Swiss Parenterals passes its EU re-inspection
Pharma
Eureka Forbeswait · Service revenue growing again at high single digits
Consumer Durables
Eureka Forbeswait · No further pledge top-up or block sale by Advent's holding company
Consumer Durables
Eveready Industries Indiawait · A benign NCLAT ruling on the ₹171.6cr competition penalty
Consumer Durables
Eveready Industries Indiawait · Operating margin holding above 13% as zinc costs move
Consumer Durables · expected at least 13%
Eveready Industries Indiawait · J&K GST incentive approved for the Jammu alkaline plant
Consumer Durables
Everest Kanto Cylindpass · Group revenue growing again as Mundra and Egypt ramp up (Q1 fell 10%)
Industrials · expected at least 0%
Everest Kanto Cylindpass · Tribunal ruling on the ₹351cr GST demand
Industrials
Excel Industrieswait · Anti-dumping duty imposed on Chinese HEDP and ATMP phosphonates
Chemicals
Excel Industrieswait · A buyback, or a sale of the Tanfac or Silox stakes
Chemicals
Excel Industrieswait · Operating margin holding 13–15% outside the strong first quarter
Chemicals · expected at least 13%
Excel Industrieswait · Contract-manufacturing line on stream
Project milestone · Chemicals
Exicom Tele-Sys.pass · Operating cash turning positive
Electrical Equipment
Expleo Solutionspass · The ₹97.5cr of loans to the parent repaid
Software
Expleo Solutionspass · Constant-currency growth above 8%
Software
Expleo Solutionspass · An acquisition finally announced (called 'very likely')
Software
Fairchem Organicspass · Operating margin held at about 10% (company: 'we will be able to maintain')
Chemicals · expected at least 10%
Fairchem Organicspass · Operating cycle back under 120 days
Chemicals
Fairchem Organicspass · New line starts trial production
Project milestone · Chemicals
Fiem Industriesown · LED share of lighting revenue moves above 64%
Auto Related
Fiem Industriesown · Hosur supplies all Vida lamps for Hero's new Andhra Pradesh plant
Project milestone · Auto Related
Fineotex Chemicalwait · CrudeChem accounts disclosed separately
Chemicals
Fineotex Chemicalwait · Operating cash flow positive
Chemicals
Finolex Cableswait · Fibre margin falling back to low double digits once cheap stock runs out
Cables
Finolex Cableswait · Building-wire volume growing beyond low single digits despite UltraTech
Cables
Finolex Cableswait · Bombay High Court outcome on promoter voting control
Cables
Finolex Cableswait · Fibre draw capacity reaches 8 million fibre-km
Project milestone · Cables
Finolex Indswait · Volume growth returning now the PVC price floor is in place (guide high single to low double digits; −27% in Q1)
Plastics
Finolex Indswait · A board decision on using the ₹2,636cr of net cash
Plastics
Fractal Analyticsfollow · Tech-client (TMT) revenue growing again in Q2 ('healthy sequential growth' expected)
Software
Fractal Analyticsfollow · A new CFO named
Software
Fractal Analyticsfollow · Cogentiq revenue disclosed and rising
Software
Fredun Pharmapass · Inventory days falling towards 120 at the half-year
Pharma
Fredun Pharmapass · 12–13 new packing lines installed
Project milestone · Pharma
Freshara Agrowait · Positive operating cash in H1 FY27
Food Products
Freshara Agrowait · Inventory days falling well below 282
Food Products
Frontier Springspass · Q2 FY27 revenue above ₹90cr
Auto Related · expected at least ₹90cr
Frontier Springspass · Air-spring output above 250 coach sets a month
Auto Related
Gabriel Indiapass · First quarter of Mando profit share covers the new interest cost
Auto Related
Gabriel Indiapass · Mando and Klemove payments made (September 2026)
Project milestone · Auto Related
Gala Precision Engi.own · No material demand from the August income-tax search
Industrials
Galaxy Surfactantsfollow · EBITDA of ₹21,000 a tonne or more in Q2 FY27 (company guide ₹21,000–22,000)
Chemicals
Galaxy Surfactantsfollow · Volume growth above 8% (guide 6–8%)
Chemicals
Gandhar Oil Refinery (India)wait · Q2 FY27 spread falls below ₹15,000 a kilolitre as the windfall fades (Q1: ₹28,145; normal ₹8,274)
Oil
Gandhar Oil Refinery (India)wait · The capex plan promised 'next quarter' on two calls is announced
Oil
Gandhar Oil Refinery (India)wait · Capex plan for the Taloja expansion announced
Project milestone · Oil
Ganesh Benzoplastwait · Storage margin back above 35% as the lease cost is passed on
Oil
Management changed this (2026-09-30): On 29 Sep 2026 the company agreed to sell its liquid storage and rail logistics businesses (including JNPT) for ₹1,154cr; if the sale closes, this checkpoint no longer applies to the company
Ganesh Consumer Prodwait · Volume back to +7–8% in H1 FY27, as guided
Food Products
Ganesh Consumer Prodwait · Operating margin at or above the 9.8–10% guided
Food Products · expected at least 9.8%
Ganesh Housingavoid · Related-party advances (₹385cr) start coming back
Realty
Ganesh Housingavoid · The Thaltej plot buyer and price disclosed
Realty
Garware Hi-Techfollow · Q2 margin within the 25% ±2 guide once the one-off tariff refund is stripped out
Plastics
GE Powerpass · Operating margin at or above the 11% underlying 'base' management guides
Electrical Equipment · expected at least 11%
GE Powerpass · The ₹450cr on-demand deposit with the GE Vernova group recalled, not grown
Electrical Equipment
Genus Powerwait · Q2 FY27 operating margin of 18% or better (the cut FY27 guide)
Electrical Equipment · expected at least 18%
Genus Powerwait · New metering awards refill the order book above June's ₹24,020cr
Electrical Equipment · expected at least ₹24,020cr
GHCLown · Board does not commit to the ₹4,000–5,000cr soda-ash greenfield at today's prices
Chemicals
GHCLown · Safeguard limits on soda-ash imports imposed
Chemicals
GHCLown · Commercial production of bromine and vacuum salt
Project milestone · Chemicals
GK Energywait · Order book rebuilding above ₹1,000cr (₹541cr now)
Construction · expected at least ₹1,000cr
GK Energywait · Operating margin staying above CARE's 12% trigger
Construction · expected at least 12%
Gland Pharmaown · Management confirms the ~20% a year four-year growth guide next quarter
Pharma CDMO
Gland Pharmaown · FDA approval of the new bag line (decides whether FY27 beats 15%)
Pharma CDMO
Gland Pharmaown · Cenexi revenue reaching about €51m a quarter at a high-single-digit margin
Pharma CDMO
Gland Pharmaown · FDA approves the new bag line
Project milestone · Pharma CDMO
Global Health (Medanta)wait · Gurugram cluster margin at 24–25% as rivals open nearby (Q1: 24.1%)
Hospitals
GNFCfollow · ₹21,370cr telecom licence-fee demand formally dropped
Chemicals
GNFCfollow · Power plant started (slipped from April to September 2026)
Chemicals
GNG Electronicswait · Operating cash flow turning positive in the September half-year accounts (FY26: negative ₹215cr)
Hardware
GNG Electronicswait · Net debt falling back toward the ~₹300cr promised (₹406cr in June 2026)
Hardware
Go Fashion (India) (GoColors)pass · Margin after rent back above 15% (11.5% last)
Retail
Go Fashion (India) (GoColors)pass · The promised written clarification of its same-store figures
Retail
Godavari Powerfollow · Maharashtra land allotted (expected by end-Aug 2026)
Project milestone · Mining & Metals Recycle
Godavari Powerfollow · 100 MW solar plant commissioned (September 2026)
Project milestone · Mining & Metals Recycle
Godrej Agrovetfollow · FY27 profit range given after Q2, as promised
Food Products
Godrej Agrovetfollow · Crop protection recovering after the monsoon (sales −17% in Q1)
Food Products
Gopal Snackspass · The remaining ₹35–40cr of fire insurance received
Food Products
Gopal Snackspass · The MD's 8.42% share pledge released and the ~₹69cr GST disputes cleared
Food Products
GPT Healthcare (Agilus)follow · Agartala back above 55% occupancy
Hospitals
GPT Infraprojectsfollow · Promoter pledge (50.8%) falling
Construction
GPT Infraprojectsfollow · Tribunal approval of the Alcon merger
Construction
GR Infraprojectswait · A clean Q2 FY27: orders arriving and no new legal surprise
Construction
GR Infraprojectswait · Standalone margin holding at 10–11% (Q1: 11.0%)
Construction
GR Infraprojectswait · NTPC battery dispute (₹90.87cr guarantees) settled without a large loss
Construction
Granules Indiawait · Gagillapur FDA re-inspection held and cleared
Pharma
Greaves Cottonpass · No further capital sent to the electric-scooter company
Pumps Comp & Eng
Greenlam Industrieswait · An explanation of the ₹63cr of subsidiary tax disputes
Consumer Durables
Greenpanel Inds.pass · Plant use above 65% (51% now)
Consumer Durables
Greenpanel Inds.pass · Operating margin above 12%
Consumer Durables · expected at least 12%
Greenpanel Inds.pass · MDF exports restarting
Consumer Durables
Greenply Industrieswait · No demand from the February 2026 income-tax search
Consumer Durables
GRPpass · Pyrolysis credits arrive by H1 FY27, as promised on the Q4 call
Rubber
GSFCfollow · Rabi NPK subsidy rates from 1 October rising to catch up with sulphur and phosphoric acid
Agrochemical & Fertilizers
GSFCfollow · Group margin back above CARE's 7% trigger (6.5% in Q1)
Agrochemical & Fertilizers · expected at least 7%
GSFCfollow · The ₹1,332cr of unexplained 'other' claims explained
Agrochemical & Fertilizers
Gufic Bioscienceswait · EU GMP certificate for Indore received (management hoped within 1–2 months)
Pharma
Gujarat Fluorochemicwait · Net debt stays below CRISIL's 1.75x trigger and Inox-group guarantees do not rise above ₹498cr
Chemicals
Gujarat Fluorochemicwait · Expanded R-32 capacity commissioned
Project milestone · Chemicals
Gulf Oil Lubricantown · Operating margin held within the promised 12–14% band
Oil · expected at least 12%
Gulf Oil Lubricantown · Lubricant volume growth stays at two to three times the industry after the Q1 stock-up
Oil
H.G. Infra Engg.wait · Q2 FY27 revenue near ₹1,000cr at a double-digit margin
Construction
H.G. Infra Engg.wait · ₹725cr of sale proceeds from Neo arriving
Construction
Happiest Mindswait · ITC Infotech discloses its client and group-company (related-party) revenue
Software
Happy Forgingswait · Operating margin above 30% as the full price rise comes through
Forging · expected at least 30%
Harsha Engineers Intown · Foreign units' losses within the ₹2–4cr full-year guide (Romania losses shrinking)
Bearings
Harsha Engineers Intown · Building construction in China restarts after the seasonal pause
Project milestone · Bearings
HBL Engineeringfollow · Quarterly profit back above ₹200cr as the ₹1,714cr locomotive order ships
Industrials · expected at least ₹200cr
HDFC Bankown · Margin steadying near 3.3% as bonds roll off (3.26% in Q1)
Finance
HDFC Bankown · Cheap current and savings deposits back above 34% of deposits (32% in Q1)
Finance
HEGwait · HEG Graphite lists in late October at a price that asks only for ordinary cyclical growth
Elect and Refrac
HEGwait · Offtake contracts signed for about 70% of anode capacity
Project milestone · Elect and Refrac
Hester Bioscienceswait · Government PPR and goat pox vaccine tenders placed
Pharma Others
Hester Bioscienceswait · A quarter of profit without one-off gains (Q1 included ₹85cr)
Pharma Others
Hexagon Nutritionfollow · Operating margin back to 14% or better as 10–15% price rises land
Pharma Others · expected at least 14%
Hexagon Nutritionfollow · The ₹100cr order book turning into Q2 sales; receivables and inventory under control
Pharma Others
Himadri Specialityfollow · Operating margin holding at about 20%
Chemicals · expected at least 20%
Himadri Specialityfollow · Operating cash above 70% of EBITDA
Chemicals
Himadri Specialityfollow · No further lending to Dalmia Bharat Refractories / Birla Tyres' owner
Chemicals
Himadri Specialityfollow · First 2,600 tonnes commissioned
Project milestone · Chemicals
Hind Rectifiersfollow · A Q2 FY27 standalone quarter above ₹300cr of revenue
Industrial - Railway · expected at least ₹300cr
Hind Rectifiersfollow · Order book back above ₹1,000cr (₹740cr in July)
Industrial - Railway · expected at least ₹1,000cr
Hindustan Foodswait · Switch to reporting only conversion fees
Food Products
Hindustan Foodswait · Silvassa expansion starts production
Project milestone · Food Products
Hindware Home Innov.pass · Tribunal approval of the demerger
Consumer Durables
Hindware Home Innov.pass · Net bank debt below ₹550cr (about ₹669cr now)
Consumer Durables
HLE Glascoatpass · Omeras at ₹45–50cr of quarterly revenue and breaking even
Industrials
Honasa Consumer (Mamaearth)wait · No repeat of the FY25 distributor-stock correction
Consumer Durables
HPL Electricpass · New meter orders at higher prices and the order book growing again
Industrials
HPL Electricpass · Debt starting to fall
Industrials
Huhtamaki Indiawait · July–September volumes hold up after the customer pull-forward (results 27 October)
Packaging
Huhtamaki Indiawait · Operating margin holding at 8–9% or better
Packaging · expected at least 8%
ICE Make Refrig.avoid · Operating cash turning positive
Industrials
ICICI Bankown · Deposit growth closing the gap with loan growth (14% against 19.6% in Q1)
Finance
ICICI Bankown · Core margin held 'range bound' near 4.28%, as guided
Finance
ICICI Bankown · Credit cost moving back toward the ~0.50% normal level (0.32% in Q1)
Finance
ICICI Bankown · Release of the ₹1,283cr RBI-ordered farm-loan provision
Finance
ideaForge Technologywait · Gross margin back in the 50–55% band (49% in Q1)
Aerospace defence
IFB Industrieswait · Operating margin above 7% in Q2 FY27 (CRISIL's upgrade trigger; first of two quarters)
Consumer Durables · expected at least 7%
IFGL Refractoriespass · Indian company's margin back above 12%
Elect and Refrac
IG Petrochem.wait · Phthalic anhydride volume back to 50,000 tonnes a quarter
Chemicals
IG Petrochem.wait · First plasticiser sales, and their margin
Chemicals
IG Petrochem.wait · An explanation of the loss-making Dubai subsidiary holding ₹158cr
Chemicals
IG Petrochem.wait · Plasticiser commercial production starts
Project milestone · Chemicals
IKIO Technologiesfollow · Operating margin holding at 13–14% as chip costs bite
EMS & Electronics · expected at least 13%
India Pesticideswait · Operating margin above CARE's 14.5% line
Agrochemical & Fertilizers · expected at least 14.5%
Indiamart Intermeshfollow · Revenue grows in double digits, as guided
Retail · expected at least 10%
Indiamart Intermeshfollow · Cash collections growth stays above 8%
Retail
Indigo Paintsfollow · Revenue growth of about 20% in Q2 FY27
Consumer Durables · expected at least 19%
Indigo Paintsfollow · Jodhpur plant reaching commercial output
Consumer Durables
Indigo Paintsfollow · Trial production starts at the Jodhpur water-based plant
Project milestone · Consumer Durables
Indiqube Spaceswait · Audited H1 cash flow and capex disclosed
Commercial Services
Indiqube Spaceswait · Rent-paying area rising above 7.84m sq ft
Commercial Services
Indiqube Spaceswait · Filed profit after tax turning positive (Q1: loss of ₹24cr)
Commercial Services · expected at least ₹0cr
Indo Farmpass · No new guarantees to its finance arm; stock and receivables falling
Vehicles
Indo Farmpass · First lot of 10 tower cranes built
Project milestone · Vehicles
Indoco Remediespass · FDA re-inspection of Goa Plants II–III held and cleared
Pharma
Infibeam Avenues · Net revenue (the revenue it keeps) growing again (−3% in Q1)
Platform Cos
InfoBeans Technologiesown · Dollar revenue growth holding near 20%
Software
Innova Captabfollow · Jammu plant reaching ₹150cr of revenue a quarter
Pharma CDMO
Innova Captabfollow · Volume growth staying above 20%
Pharma CDMO
Inox Indiafollow · H1 FY27 revenue growth back near 15–20% (Q1 was 8%)
Industrials
Inox Windavoid · Q2 FY27 revenue about double a year earlier, the run-rate the +75% guide now needs
Electrical Equipment · expected at least 100%
Inox Windavoid · Receivable days disclosed and falling from 353 toward the ~200 promised
Electrical Equipment
Insecticides (India)wait · Revised targets given after H1, with inventory and receivables falling in Q2
Agrochemical & Fertilizers
Insolation Energypass · Q2 operating margin back toward the 14–15% guide (10% in Q1)
Solar PV Cells EPC · expected at least 14%
Insolation Energypass · No more cash going to promoter-linked companies
Solar PV Cells EPC
Insolation Energypass · Frame plant commissioned
Project milestone · Solar PV Cells EPC
Intellect Design Arenafollow · Company-reported total income above ₹900cr a quarter (₹872cr in Q1)
Software
Intellect Design Arenafollow · Days sales outstanding staying below 125 days (124 now)
Software
Interarch Buildingwait · Revenue running at about ₹570cr a quarter to meet the FY27 guide
Construction · expected at least ₹570cr
Interarch Buildingwait · Income-tax block assessment closing without a large demand
Construction
Interarch Buildingwait · QIP of about ₹250cr priced without heavy dilution
Construction
Inventurus Knowledge Solutionsfollow · Core business constant-currency growth staying at 12% or more
Software
Inventurus Knowledge Solutionsfollow · No further cut to TruBridge's $300m revenue base; combined margin about 26–27% before recovery
Software
Inventurus Knowledge Solutionsfollow · TruBridge in the accounts; group margin about 26–27% as it is added
Project milestone · Software
IOL Chem & Pharmafollow · Operating margin holding at 14–15%, as guided, as input prices ease
Pharma API · expected at least 14%
IOL Chem & Pharmafollow · Paracetamol capacity use rising from 55% towards 70–75%
Pharma API
ION Exchagewait · Chemicals segment margin back above 15%
Utilities
Ipca Laboratorieswait · A second quarter with operating margin above 23%, without tender or currency help
Pharma · expected at least 23%
Ipca Laboratorieswait · No further associate write-offs (Krebs, Lyka)
Pharma
IRB Infra.Devl.follow · A new toll-road win at its 15–16% target return
Construction
Ircon Intl.pass · Order book back above ₹30,000cr (₹23,366cr now)
Construction · expected at least ₹30,000cr
Ircon Intl.pass · A permanent chairman appointed, and any decision on a merger with RVNL
Construction
Ircon Intl.pass · Own margin (before other income) of 4.0–4.5% as guided
Construction
Isgec Heavy Engg.follow · Philippine plant at 90% use with positive operating profit, or sold
Industrials
Isgec Heavy Engg.follow · Standalone guidance (10–12%) raised at the half-year
Industrials
Isgec Heavy Engg.follow · Project margins moving to 5–6% as old contracts finish
Industrials
Isgec Heavy Engg.follow · Small production starts from the first phase
Project milestone · Industrials
IZMOavoid · The regulatory inquiries disclosed and closed
Software
IZMOavoid · The ₹150cr raise completed on fair terms (slipped ten months)
Software
J Kumar Infraown · Operating margin held at 14–15%
Construction · expected at least 14%
Jagsonpal Pharmawait · Operating margin held above 20% after the wellness deal
Pharma · expected at least 20%
Jagsonpal Pharmawait · Primary (reported) sales growth catching up with ~19% secondary sales (at least the 12–15% the 1.5x-market promise implies, excluding Aequitas)
Pharma
JD Cablesavoid · H1 FY27 results (due November) showing positive operating cash
Cables
JD Cablesavoid · New Dankuni unit above 50% use
Cables
Jeena Sikho Lifecareown · Operating profit growth back above 25% in Q2 (was 17% in Q1)
Pharma Others
Jeena Sikho Lifecareown · Operating margin above 40% as discounted and Ayushman beds fill
Pharma Others · expected at least 40%
JG Chemicalswait · Filed operating margin above 10%
Chemicals · expected at least 10%
JG Chemicalswait · First ceramics orders from Morbi
Chemicals
Jindal Drilling and Industriesfollow · Three off-hire rigs (Virtue-I, Discovery-I, Jindal Star) re-contracted at $45,000 a day or more
Oil
JK Tyre & Industwait · Mexico (JK Tornel) sales recovering in Q2 after almost stopping in Q1
Tyres
JNKwait · Formal renewal of the cooperation agreement with parent JNK Global
Industrials
John Cockerillavoid · A first commercial JVD order
Industrials
JTEKT Indiapass · Operating margin 8% or more in Q2 FY27 (first of two quarters)
Auto Related · expected at least 8%
Juniper Hotelswait · No related-party loans to promoter companies after the AGM vote against them
Hotels and Travels
Jupiter Life Line Hospitalswait · Dombivli losses within ₹2–3cr a month and occupancy above 40%, with insurer approvals
Hospitals
Jupiter Life Line Hospitalswait · Debt staying within ICRA's 1.8 times operating profit trigger
Hospitals
Jupiter Wagonspass · Q2 FY27 wagon output above 1,300
Industrial - Railway
Jupiter Wagonspass · Stock falling back from ₹1,079cr
Industrial - Railway
Jyothy Labsfollow · Double-digit growth excluding Pril and Fa, as guided
Consumer Durables
Jyothy Labsfollow · Volume growth staying high single-digit without Pril
Consumer Durables
Jyoti CNC Auto.wait · New 10,000-machine plant commissioned by end-September and foundry in October
Industrial Machinery
Jyoti CNC Auto.wait · Bhuj plant commissioned and producing
Project milestone · Industrial Machinery
Kajaria Ceramicsfollow · Double-digit tile volume growth in Q2 FY27, as promised
Consumer Durables
Kanpur Plastipackwait · Bulk-bag output back to 3,500–3,800 tonnes a quarter (3,000 in Q1)
Packaging
Kansai Nerolacfollow · Operating margin holding 13–14% as dearer stock flows through in Q2
Consumer Durables · expected at least 13%
Kansai Nerolacfollow · House-paint volume growth catching up with the market leader's (about 9%)
Consumer Durables
Kaveri Seed Companywait · Stock falling as production is cut
Food Products
KEC Internationalwait · Net debt (including supplier credit) down to about ₹6,000cr by September 2026
Construction - Power
KEC Internationalwait · No rating downgrade and no fresh tender ban
Construction - Power
KEC Internationalwait · Elastomeric cable production starts
Project milestone · Construction - Power
Kilburn Engg.wait · Q2 FY27 order intake above ₹200cr
Industrials
Kilburn Engg.wait · Debtor days back under 100
Industrials
Kiri Industriesavoid · Financial closure of the copper project and a binding concentrate contract
Chemicals
Kiri Industriesavoid · No tax demand on the DyStar award
Chemicals
Kirloskar Brothersfollow · US data-centre framework contract (in final signing) is signed
Pumps Comp & Eng
Kirloskar Pneumaticfollow · H1 FY27 sales of ₹750–800cr at about a 19% margin (Q2 catch-up after Q1's +10%)
Pumps Comp & Eng
Kirloskar Pneumaticfollow · Middle East package orders restart
Pumps Comp & Eng
Knack Packagingfollow · Operating margin holding above 18% as polymer prices swing
Packaging · expected at least 18%
Knack Packagingfollow · Quarterly sales held at the Q1 FY27 level until the new plant starts, as management said
Packaging
KNR Constructionswait · Telangana paying its ₹70–90cr monthly instalments (about ₹1,450cr owed)
Construction
KP Green Engg.pass · H1 FY27 revenue growth on the 40–50% minimum guided for FY27
Electrical Equipment · expected at least 40%
KP Green Engg.pass · H1 FY27 operating margin within the 16–20% guided
Electrical Equipment · expected at least 16%
KP Green Engg.pass · Outside (non-group) customers above 60% of revenue
Electrical Equipment
KP Green Engg.pass · The ₹32.9cr property advance to the promoter returned and stock back toward 100 days
Electrical Equipment
KPIT Technologiesown · Q2 dollar revenue no lower than Q1 (management expects Q2 flat)
Software
KRBLwait · Exports recovering in Q2 FY27 after halving in Q1
Food Products
KRBLwait · Progress toward closure of the ED money-laundering case behind the qualified audit
Food Products
Krishana Phoschempass · Operating cash turning positive as receivables are collected
Agrochemical & Fertilizers
Krishana Phoschempass · CRISIL rating watch resolved without a downgrade, and group loans with Madhya Bharat reduced
Agrochemical & Fertilizers
Krishna Defence & Allied Industriesown · Late-delivery charges falling (₹9.97cr in FY26) and inventory rebuilding from the ₹16.3cr March low
Aerospace defence
Krishna Inst.Mediwait · Thane and Electronic City hospitals breaking even (Thane lost ₹8.0cr in Q1)
Hospitals
Krishna Inst.Mediwait · Interest cost falling from Q2 after the ₹1,125cr debt repayment
Hospitals
Krishna Inst.Mediwait · Founder's share pledge (for ₹750cr of personal loans) shrinking
Hospitals
KRN Heat Exchanwait · Operating margin "20-plus" (guidance)
Industrials · expected at least 20%
KRN Heat Exchanwait · Vertiv samples turning into volume orders; unbooked incentives appearing in profit
Industrials
Krosswait · Operating margin back to 13–14% after truck-maker settlements
Auto Related · expected at least 13%
Krosswait · Receivable and stock days falling
Auto Related
Krosswait · Axle-shaft facility commissioned (September 2026)
Project milestone · Auto Related
Krsnaa Diagnosticswait · Rajasthan revenue roughly doubling in Q2
Healthcare Diagnostic
Krsnaa Diagnosticswait · Debtor days below 120
Healthcare Diagnostic
Krsnaa Diagnosticswait · Profit margin back to double digits (7% in Q1 against about 13% promised)
Healthcare Diagnostic
Krsnaa Diagnosticswait · A permanent CFO appointed
Healthcare Diagnostic
Krsnaa Diagnosticswait · Rajasthan revenue roughly doubles from Q1's ₹26cr
Project milestone · Healthcare Diagnostic
Krystal Integrated Serviceswait · The ₹77.8cr loan to the former promoter-group firm (Newline) repaid
Commercial Services
Krystal Integrated Serviceswait · Receivables below 110 days (118 days now)
Commercial Services
KSH Internationalwait · Profit per tonne near ₹75,000 as Phase 2 adds standard wire
Cables
KSH Internationalwait · Next wave of Supa capacity added
Project milestone · Cables
Laser Power & Infrawait · Operating cash turning positive as projects bill
Cables
Laser Power & Infrawait · Revenue growth back in the mid-teens (guide +15–16% a year)
Cables · expected at least 14%
Laser Power & Infrawait · Lower interest cost showing from Q2 FY27 (about ₹40cr a year saving)
Cables
Latent View Analyticwait · Q2 dollar revenue back to growth (−3.5% from Q4 in Q1)
Software
Latent View Analyticwait · Decision Point claim settled near the company's ₹70cr figure (sellers claim ₹220cr)
Software
Laxmi Dentafollow · Margin holding in the 18–20% target range as scanner sales return
Health Products
Laxmi Dentafollow · Domestic lab growth above 15% (was 12%)
Health Products
Laxmi Organicpass · Dahej plant starts charging chemicals in Q2 FY27
Chemicals
Laxmi Organicpass · No impairment of the ₹491.6cr fluorination assets
Chemicals
Le Travenues Technowait · Contribution margin stays above the 36–37% floor (40.6% in Q1)
Travel Services
Lemon Tree Hotelsown · Room rates up 5–6% in Q2, as management's budget assumes (Q1: +2%)
Hotels and Travels
Lemon Tree Hotelsown · Two of three blocks of Aurika Shimla open
Project milestone · Hotels and Travels
LMWwait · Textile machinery utilisation above 75% (from about 60%) with active orders rising
Industrial Machinery
LMWwait · Aerospace order book growing beyond ₹1,000cr
Industrial Machinery
LMWwait · Cash not spent outside machinery (UAE investment, group-company purchases, new unrelated businesses)
Industrial Machinery
LT Foodsown · US ready-to-heat plant starting in Q2 FY27 (slipped from 'by July')
Food Products
LT Foodsown · US ready-to-heat plant operational
Project milestone · Food Products
Lumax Auto Techfollow · A second large customer for IAC (beyond Mahindra)
Auto Related
Lumax Industriesfollow · Q2 FY27 operating margin above 10%, as management promised
Auto Related · expected at least 10%
Lumax Industriesfollow · Debt stays flat through the doubled FY27 capex
Auto Related
M & B Engineer.wait · Margin holding near 11% in Q2 FY27 (company figure; Q1 11.4%)
Construction
M & B Engineer.wait · Orders back near ₹100cr a month in Q2 FY27
Construction
M & B Engineer.wait · Operating cash turning positive in H1 FY27, with the Sanand expansion running from October
Construction
Macfoswait · Operating cash turning positive as stock days come down
Platform Cos
Macfoswait · Revenue growth back above 45% (38% in Q1)
Platform Cos · expected at least 45%
Macfoswait · The size of the pending customs claim disclosed
Platform Cos
Macpower CNCfollow · Operating margin rises in Q2 FY27 from Q1's 16.2% (management: margin to rise each quarter)
Industrial Machinery · expected at least 16.2%
Macpower CNCfollow · The 60-acre land deal actually signed (three deadlines already missed)
Industrial Machinery
Madhya Bharat Agro Productspass · Quarterly sales growth catching up with the 50%-plus FY27 expectation (Q1 was flat)
Agrochemical & Fertilizers · expected at least 50%
Mamata Machinerywait · H1 FY27 delivers the ₹80cr of promised orders/deliveries
Industrial Machinery
Man Industries (I)follow · Saudi plant (NPC) revenue of ₹300–500cr a quarter from Q2
Iron and Steel
Man Industries (I)follow · Operating margin of 14% or more (guidance 14–15%)
Iron and Steel · expected at least 14%
Man Industries (I)follow · Revenue of about ₹1,300cr a quarter, needed for the ~₹5,000cr FY27 guide (Q1 ₹1,053cr)
Iron and Steel · expected at least ₹1,300cr
Man Industries (I)follow · NPC revenue of ₹300–500cr a quarter
Project milestone · Iron and Steel
Manaksia Coated Metalswait · Operating margin holding near 11% (guidance)
Iron and Steel · expected at least 11%
Manaksia Coated Metalswait · Operating cash turning positive and discounted bills (₹115cr) falling
Iron and Steel
Manaksia Coated Metalswait · Second colour-coating line commissioned
Project milestone · Iron and Steel
Manaksia Coated Metalswait · Alu-Zinc line at 75–80% use
Project milestone · Iron and Steel
Manaksia Coated Metalswait · Solar plant commissioned
Project milestone · Iron and Steel
Manba Financepass · Own-book bad loans below 3.7%
Finance
Manba Financepass · Borrowing cost back under 10.8% (10.86% in Q1)
Finance
Manorama Industrieswait · Operating margin within the 25–27% guided
Food Products · expected at least 25%
Manorama Industrieswait · The ₹20.64cr customs payment recovered from the supplier
Food Products
Marksans Pharmaown · Operating margin holds at or above the 21–22% guide in Q2 FY27 as the cheap stock runs out
Pharma · expected at least 21%
Marksans Pharmaown · No large, expensive acquisition with the ₹1,031cr net cash (next European deal at a sensible price)
Pharma
Matrimony.comfollow · Double-digit billing growth in Q2, as guided (7.8% in Q1)
Platform Cos
Matrimony.comfollow · Double-digit revenue growth in Q2, as guided
Platform Cos · expected at least 10%
Matrimony.comfollow · Triple-digit profit growth in Q2, as guided
Platform Cos · expected at least 100%
Matrimony.comfollow · A permanent CFO, and sign-ups holding after the Jodii rebrand
Platform Cos
Max Estateswait · No further related-party land or asset deals
Realty
Maxvolt Energy Indusavoid · H1 FY27 operating margin back above 12%
EMS & Electronics · expected at least 12%
Maxvolt Energy Indusavoid · Positive operating cash in H1 FY27
EMS & Electronics
Maxvolt Energy Indusavoid · Construction starts at Aligarh
Project milestone · EMS & Electronics
Mayur Uniquotersown · Operating margin at 22% or better without currency gains
Consumer Durables · expected at least 22%
Mayur Uniquotersown · No write-down of the ₹102.7cr polyurethane plant
Consumer Durables
Medpluswait · Own-label products regain 22% of sales
Retail
Meghmani Organicspass · Crop-protection volumes returning to growth while keeping the ~20% margin
Agrochemical & Fertilizers
Menon Bearingswait · No further promoter-family selling
Auto Related
Menon Bearingswait · First railway brake orders from the new test rig
Auto Related
Metro Brandswait · Profit margin inside the 13–15% guide
Consumer Durables
Metropolis Health.follow · Core Diagnostics turning profitable (lost ₹3.1cr in FY26)
Healthcare Diagnostic
Minda Corpwait · Net debt falls, not rises, after the ₹500cr bond issue
Auto Related
Minda Corpwait · Flash Electronics' margin recovers to 16–17%
Auto Related
Mishra Dhatu Nigam (MIDHANI)pass · Approval of the ₹1,000cr modernisation
Aerospace defence
MM Forgingsfollow · Quarterly volume of 23,000–25,000 tonnes from Q2 (Q1: 20,200)
Forging
MM Forgingsfollow · Net debt cut below ₹900cr (now ₹1,010cr)
Forging
MM Forgingsfollow · Quarterly volume of 23,000–25,000 tonnes
Project milestone · Forging
Mobavenue Ai Techpass · The ₹45.7cr owed to promoters paid off, and promoter-linked loans and trades wound down
Software
Mobavenue Ai Techpass · 'Rule of 50': revenue growth above 30%
Software · expected at least 30%
Mobavenue Ai Techpass · 'Rule of 50': operating margin of 20% or more
Software · expected at least 20%
Mobavenue Ai Techpass · Direct-client share recovering from 65%
Software
Molbio Diagnosticswait · Commissions falling from 11.6% of revenue
Healthcare
Molbio Diagnosticswait · Anti-corruption notice at the Prognosys subsidiary closed
Healthcare
Mold-Tek Pack.follow · Operating profit per kilo holding at ₹44 or more (guide ₹44–45; ₹46.7 in Q1)
Packaging
Motherson Sumi Wirinwait · Operating margin back above 9%
Auto Related · expected at least 9%
Motherson Sumi Wirinwait · Wage-cost recovery agreed with customers
Auto Related
Motherson Sumi Wirinwait · New-plant revenue above ₹500cr a quarter
Auto Related
Mrs Bectors Foodwait · Q2 operating margin holding near 13% despite inflation
Food Products · expected at least 13%
Mrs Bectors Foodwait · Domestic biscuit growth reaching double digits
Food Products
MSTCfollow · Auction fee growth stays in double digits as guided
Commercial Services
MSTCfollow · EPR-certificate exchange goes live (government notification issued)
Commercial Services
MSTCfollow · No coal exchange licensed that takes over MSTC's coal-sale auctions
Commercial Services
MTAR Technologiesfollow · No second hot-box supplier added at Bloom
Aerospace defence
MTAR Technologiesfollow · Oil and gas plant commissioned
Project milestone · Aerospace defence
MV Electrosystemswait · 10 propulsion sets delivered in September (none in July–August)
Industrial - Railway
MV Electrosystemswait · First 10 propulsion sets delivered
Project milestone · Industrial - Railway
Narayana Hrudayalayawait · UK margin recovering from 8.8% after the heatwave outages
Hospitals
Narayana Hrudayalayawait · Insurance losses (Cayman and India) falling after repricing (about ₹54cr in Q1)
Hospitals
Narayana Hrudayalayawait · No further slips in Indian project dates
Hospitals
Narayana Hrudayalayawait · South-west Bengaluru hospital opens
Project milestone · Hospitals
Natco Pharmawait · What the ₹1,279cr rights money buys, and at a sensible return (not a large, expensive deal)
Pharma
Navin Fluorine Intlfollow · Operating margin holding at 32% or more in Q2 FY27 as R-32 prices fall (guide 32–33%)
Chemicals · expected at least 32%
Navin Fluorine Intlfollow · Chemours data-centre cooling-fluid plant started by the end of Q2 FY27
Chemicals
Navin Fluorine Intlfollow · Chemours plant completed
Project milestone · Chemicals
NBCCfollow · Q2 FY27 revenue above ₹4,000cr
Construction · expected at least ₹4,000cr
NBCCfollow · Cabinet approval of the five Delhi colonies
Construction
NCCfollow · Uttar Pradesh water-scheme dues falling below ₹1,000cr
Construction
NCCfollow · Operating margin of 8.5–9% as guided
Construction · expected at least 8.5%
NDR Auto Componentsfollow · Operating margin in the 11–12% guided band
Auto Related · expected at least 11%
NDR Auto Componentsfollow · Operating cash back above 70% of operating profit
Auto Related
NDR Auto Componentsfollow · A material order from a maker other than Maruti (Toyota, Kia or Hyundai)
Auto Related
Neetu Yoshifollow · H1 FY27 results show the new bogie plant's first sales (plant started 13 September)
Forging
Neetu Yoshifollow · RDSO bogie approval received
Forging
Nelcastwait · Operating profit per kilogram above ₹14 in Q2 (Q1: ₹9.5)
Forging
Nelcastwait · Pedapariya plant use back above 35% (Q1: 21%)
Forging
Neogen Chemicalspass · Insurer settles the ₹348.8cr fire claim close to the amount booked
Chemicals
Neogen Chemicalspass · Electrolyte plant commissioned
Project milestone · Chemicals
Neogen Chemicalspass · Dahej replacement plant in commercial production
Project milestone · Chemicals
Nephrocare Healthwait · Filed profit closing the gap with adjusted profit (FY26: ₹77cr filed vs ₹128cr adjusted)
Healthcare
Nephrocare Healthwait · Andhra Pradesh PPP contract renewed
Healthcare
Netweb Technologieswait · Stock back under 90 days and positive operating cash
Software
Netweb Technologieswait · Operating margin within the 13–14% guided
Software · expected at least 13%
Network People Servicespass · Quarterly revenue of ₹75cr or more (₹56cr in Q1)
Software · expected at least ₹75cr
Network People Servicespass · Debtor days falling from 195
Software
Neuland Laboratoriesfollow · Operating margin in Q2 at or above the 25%-plus guide
Pharma CDMO · expected at least 25%
Neuland Laboratoriesfollow · Peptide module 2 running with its anchor customer
Pharma CDMO
Newgen Softwareown · First disclosure of ARR or remaining contract value
Software
NGL Fine-Chemwait · Revenue above ₹150cr a quarter, the level management says it needs to stabilise (Q1: ₹139cr)
Pharma API · expected at least ₹150cr
NGL Fine-Chemwait · Operating margin holding inside the guided 15–18% as Phase 2 costs start
Pharma API · expected at least 15%
NGL Fine-Chemwait · Three pending European certificates approved
Pharma API
NGL Fine-Chemwait · Phase II commissioned
Project milestone · Pharma API
Nocilwait · Anti-dumping duty granted on Pilflex 13
Chemicals
Northern ARC Capitalfollow · Margin back to 9.5% in Q2 FY27, as guided (9.3% in Q1)
Finance
Northern ARC Capitalfollow · Overdue loans (1.2% at March) staying well below ICRA's 3% trigger
Finance
NRB Bearingfollow · Q2 margin above 16% despite power and freight costs
Bearings · expected at least 16%
NRB Bearingfollow · First major enhancement projects commissioned
Project milestone · Bearings
Nucleus Softwarewait · Sequential revenue growth from Q2 as the ₹1,244cr order book converts
Software
Nucleus Softwarewait · Operating margin back above 15% (3.6% in Q1)
Software · expected at least 15%
Nucleus Softwarewait · Days sales outstanding falling back towards 45 from 63
Software
OBSC Perfectionwait · No further share issues
Auto Related
Ola Electricavoid · Revenue growing again year on year as dealers open (43–57% below a year earlier for five quarters)
Vehicles · expected at least 0%
Ola Electricavoid · 6 GWh fully commissioned and cell production restarted
Project milestone · Vehicles
Olectra Greentechwait · Q2 bus deliveries of about 500 as guided (358 in Q1)
Vehicles
Olectra Greentechwait · BEST order dispute resolved and related-party (Evey, MEIL) approvals passed at the 26 September AGM
Vehicles
Olectra Greentechwait · Operating margin holding near 12% and receivables coming down
Vehicles
Olectra Greentechwait · About 500 buses delivered in the quarter
Project milestone · Vehicles
Omnitech Engineeringwait · Operating margin holding at 30% (guidance "30% and above")
Industrials · expected at least 30%
One Mobikwik Systemswait · Profit in Q2 without loan write-backs
Platform Cos
One Mobikwik Systemswait · Disbursals back at ₹1,000cr a quarter
Platform Cos
OnEMI Technologyfollow · Gross bad loans below the 2.25% ceiling guided
Finance
Onesource Specialtywait · Line 2 running in Q2 and revenue stepping up
Pharma CDMO
Onesource Specialtywait · Operating cash turning positive at the half-year
Pharma CDMO
Onesource Specialtywait · Line 2 in commercial production
Project milestone · Pharma CDMO
Onward Technologiesfollow · Double-digit revenue growth, as guided (12% in Q1)
Software · expected at least 10%
Onward Technologiesfollow · Offshore share of work recovering from 68%, with no loss among the top five clients
Software
Onward Technologiesfollow · New centre starts billing
Project milestone · Software
Orchid Pharmaavoid · No further credit rating cut
Pharma
Orchid Pharmaavoid · A US or Japanese licence for Exblifep
Pharma
Oriana Powerfollow · The 238 MWp Actis plant sale closes in H1 FY27 and cash comes back
Solar PV Cells EPC
Oriana Powerfollow · Off-balance-sheet guarantees for project companies (₹1,385cr) start falling
Solar PV Cells EPC
Oriana Powerfollow · 238 MWp sold to Actis with cash received
Project milestone · Solar PV Cells EPC
Orient Bellwait · Operating margin above 7% in Q2 FY27 as Morbi recovers
Consumer Durables · expected at least 7%
Orient Electricwait · Gross margin back above 31% (29.8% in Q1)
Consumer Durables
Orient Electricwait · Operating margin above 8% outside the summer (Q2 FY27)
Consumer Durables · expected at least 8%
Oriental Aromaticspass · Operating margin above 9% (first of the two quarters needed)
Chemicals · expected at least 9%
Oriental Aromaticspass · Mahad plant revenue above ₹12cr a quarter
Chemicals
Oriental Aromaticspass · Borrowings (₹403cr) and stock falling
Chemicals
OSEL Devicespass · Positive operating cash in H1 FY27 (negative in FY25 and FY26)
Health Products
OSEL Devicespass · Related-party purchases from the promoter-group firm falling (₹44cr a year)
Health Products
Oswal Pumpspass · Q2 FY27 revenue up 10–15%, as guided
Pumps Comp & Eng · expected at least 10%
Oswal Pumpspass · 1 GW first phase in commercial production
Project milestone · Pumps Comp & Eng
Paradeep Phosphateswait · Profit per tonne in Q2 around the ~₹5,000 FY27 guide
Agrochemical & Fertilizers
Paradeep Phosphateswait · Net debt staying under CRISIL's 3-times operating profit line (2.85 times now), with subsidy receivables coming down
Agrochemical & Fertilizers
Paramount Communicationspass · Term debt tied up for the Narmadapuram plant
Cables
Patel Engineeringwait · Promoter pledge (86.6%) falling by the promised 15–20% or more
Construction
Patel Engineeringwait · No further write-downs
Construction
Patel Engineeringwait · Operating margin of 13–14% as guided
Construction · expected at least 13%
Patil Automationwait · Order book rebuilt above ₹200cr in H1 FY27 (₹118cr in May)
Industrials
Patil Automationwait · Positive operating cash
Industrials
PCBL Chemicalwait · Carbon black profit above ₹16,000 a tonne after stock effects
Chemicals
PCBL Chemicalwait · Debt below four times EBITDA
Chemicals
PCBL Chemicalwait · Aquapharm back above ₹60cr a quarter
Chemicals
Pennar Industrieswait · Segment profit figures published, as promised for Q2
Construction
Pennar Industrieswait · Double-digit revenue growth from Q2 FY27 as guided
Construction · expected at least 10%
Pennar Industrieswait · Debt to equity staying at or below 0.7
Construction
PG Electroplastpass · Inventory below ₹900cr, as promised
EMS & Electronics
Piramal Pharmawait · Morpeth Form 483 closing without escalation
Pharma CDMO
Pitti Engineeringown · Net debt stays below ₹491cr while the ₹290cr plant is built
Industrials
PNC Infratechwait · Court ruling on the three-year NHAI debarment (ban quashed)
Construction
PNC Infratechwait · Water-scheme dues (₹925cr) coming in
Construction
Poly Medicurefollow · Quarterly revenue run-rate toward ₹592cr, the pace the FY27 guide needs (Q1: ₹525cr)
Health Products · expected at least ₹592cr
Poly Medicurefollow · Anti-dumping duty imposed on Chinese and Malaysian dialysers
Health Products
Poly Medicurefollow · Consolidated margin staying in the 23–25% guided range
Health Products
Pondy Oxides & Chem.wait · Lead volume back above 20,000 tonnes a quarter
Mining & Metals Recycle
Pondy Oxides & Chem.wait · Lead earning within the raised guide of ₹18,000–20,000 a tonne
Mining & Metals Recycle
Poojaa Precision Enggpass · First half-year results filed in November 2026
Auto Related
Poojaa Precision Enggpass · Customer names disclosed and a first earnings call held
Auto Related
Powericafollow · The 100 MW GUVNL wind project stays on schedule
Pumps Comp & Eng
Praj Industrieswait · A dated E25–E30 blending mandate
Industrials
Praj Industrieswait · Operating margin back above 7–8% (about 4% now)
Industrials · expected at least 7%
Precision Camshaftspass · A clean exit from the Dutch e-truck arm EMOSS
Auto Related
Precision Camshaftspass · Standalone camshaft margin back in the mid-teens
Auto Related
Premier Explosivespass · Quarterly revenue above ₹150cr
Chemicals · expected at least ₹150cr
Premier Explosivespass · Operating margin of 15% or more
Chemicals · expected at least 15%
Prevest Denproown · H1 FY27 sales growth back to about 20% (missed >20% in H2 FY26; Q1 +21%)
Health Products
Prevest Denproown · Founder-MD Atul Modi back at work after June's medical emergency
Health Products
Prevest Denproown · Inventory days falling from 239
Health Products
Pricolfollow · Q2 FY27 operating margin above 12% after price indexation
Auto Related · expected at least 12%
Pricolfollow · Demerger scheme for the cluster business announced with a credible partner
Auto Related
Pricolfollow · Plastics business margin back above 9%
Auto Related
Prince Pipeswait · Volume growing again, against the 12–15% guide (−7% in Q1)
Plastics
Prince Pipeswait · Stock days back to 65–75 by September (100 in Q1)
Plastics
Prince Pipeswait · Operating margin within the 11–13% guide
Plastics · expected at least 11%
Privi Speciality Chewait · Net debt staying below 2 times EBITDA
Chemicals
Privi Speciality Chewait · Phase 1 commercial (54,000 tonnes)
Project milestone · Chemicals
Protean eGovwait · Margins stabilising from Q2 or Q3, as management says
Software
Protean eGovwait · PAN 2.0 contract terms disclosed and sound
Software
PSP Projectspass · Collection of the Surat Diamond Bourse and UP dues (about ₹190cr of old dues)
Construction
Pyramid Technoplastwait · Operating cash flow positive in the September half-year (FY26: −₹41cr)
Packaging
Pyramid Technoplastwait · Operating margin above 10% as drum prices fall, as guided
Packaging · expected at least 10%
Pyramid Technoplastwait · Last 1 MW commissioned
Project milestone · Packaging
Q-Line Biotechwait · H1 FY27 revenue of about ₹185–195cr (results in November)
Pharma Others · expected at least ₹185cr
Q-Line Biotechwait · A smaller related-party share of sales and receivables in the H1 results
Pharma Others
Q-Line Biotechwait · Group guarantees actually closing
Pharma Others
Quality Power Elwait · Operating cash catching up with profit
Electrical Transformers
Quality Power Elwait · Trial production starts at Sangli
Project milestone · Electrical Transformers
Quess Corpfollow · Net headcount additions of 10,000+ in Q2 FY27 (core staffing added only about 3,800 in Q1)
Commercial Services
Quess Corpfollow · Professional (IT) staffing growth back in double digits
Commercial Services
R Systems Internationalfollow · Organic constant-currency growth of 3–4% a quarter
Software
R Systems Internationalfollow · Bookings above $85M ($82.9M last)
Software
R Systems Internationalfollow · Adjusted EBITDA margin staying within the raised 18–19% guide (above 18%) as currency gains fade
Software
RACL Geartechwait · Profit growth without foreign-exchange gains
Auto Related
Railtel Corporation of Indiafollow · Receivables and credit-loss charges growing no faster than revenue
Software
Rainbow Children's Medicarefollow · Margin before rent staying at or above 24% while new beds open
Hospitals
Rainbow Children's Medicarefollow · Occupancy climbing above 41% in the busy Q2–Q3 season
Hospitals
Rainbow Children's Medicarefollow · ₹31.5cr loan to the Delhi landlord repaid or resolved
Hospitals
Rajratan Globalfollow · Operating margin at 13.5–14% ('safely', as guided)
Auto Related · expected at least 13.5%
Rajratan Globalfollow · Chennai at 60,000-tonne capacity
Project milestone · Auto Related
Rajratan Globalfollow · Steel-cord trials start
Project milestone · Auto Related
Rallis Indiafollow · Branded domestic volume growing in Q2 without extra returns provisions
Agrochemical & Fertilizers
Rallis Indiafollow · Seed sales growing in the mid-to-high single digits (after missing the mid-teen promise)
Agrochemical & Fertilizers
Rane (Madras)wait · No further castings write-down
Auto Related
Rashi Peripheralfollow · Q2 revenue growth similar to Q1's 62%, with prices rising at about half Q1's pace (guidance)
Hardware
Rashi Peripheralfollow · Gearing after the VDA purchase staying near CRISIL's ~0.63x
Hardware
Rashi Peripheralfollow · First quarter with VDA consolidated (Q2 FY27 results)
Project milestone · Hardware
RateGain Travel Techfollow · Organic growth staying above 15% once the FIFA boost drops out in Q2
Software
Raymondfollow · Aerospace revenue growth of 25%-plus as committed
Aerospace defence
Raymondfollow · Use of the promoter warrant money disclosed
Aerospace defence
Raymondfollow · Five-year slice of the aerospace order book above ₹2,765cr
Aerospace defence
Raymond Realtywait · Net debt stays below one times equity
Realty
Redingtonwait · Margin excluding Turkey kept within 2.2–2.4% and ROCE above 18%
Commercial Services
Redingtonwait · A decision on the loss-making Turkish arm (Arena)
Commercial Services
Refex Industriesavoid · Unbilled ash revenue (₹696cr) turning into cash
Chemicals
Refex Industriesavoid · Promoter pledge actually falling from 47%
Chemicals
Relaxo Footwearspass · Pairs sold growing again in Q2 FY27 (down 2% in Q1)
Consumer Durables
RHI Magnesitafollow · Q2 volume back to +7–8% growth with adjusted margin at 13% or more
Elect and Refrac
RHI Magnesitafollow · Quartzite mining starts
Project milestone · Elect and Refrac
Rico Auto Industriespass · Gurugram land sale proceeds used to cut debt
Auto Related
Rico Auto Industriespass · Hosur commercial production starts (September 2026)
Project milestone · Auto Related
RIR Power Electravoid · The ₹70cr bank loan sanctioned and Phase 2 funding settled
Electrical Equipment
RIR Power Electravoid · Halol plant revenue of ₹30cr-plus a quarter, as guided
Electrical Equipment
RIR Power Electravoid · Epitaxy operations start
Project milestone · Electrical Equipment
Riteswait · Operating margin staying above the 20% red line through the pay revision
Construction · expected at least 20%
Riteswait · Debtor days falling from about 125–141
Construction
RMC Switchgearsavoid · Positive operating cash in H1 FY27
Electrical Equipment
RMC Switchgearsavoid · About ₹58cr of retention money collected
Electrical Equipment
RMC Switchgearsavoid · A first paid PulseBox order
Electrical Equipment
Rolex Ringsfollow · July–September revenue growth above 15%
Auto Related · expected at least 15%
Rolex Ringsfollow · CMD's share pledge released
Auto Related
Rossari Biotechfollow · Operating margin back above 13% (first of the two quarters needed)
Chemicals · expected at least 13%
Rossari Biotechfollow · Free cash positive and net debt below ₹200cr
Chemicals
Rossari Biotechfollow · Consumer arm sold or closed
Chemicals
Rossell Techsysavoid · The ₹300cr QIP actually closing
Aerospace defence
Rossell Techsysavoid · Margin above 16% once the loss-making Boeing batch ends
Aerospace defence · expected at least 16%
Route Mobilewait · No further supplier-prepayment write-offs or provisions
Software
Royal Orchid Hotelswait · Fee (managed-hotel) revenue growing again
Hotels and Travels
RPG Life Scienceswait · API arm margins back to the mid-20s after the Actis and Raghava deals
Pharma
RPG Life Scienceswait · H1 operating cash recovering after three years of decline
Pharma
RR Kabel Ltd.follow · Wire-and-cable segment margin holding at 9.5%-plus as UltraTech's wire reaches shops
Cables
RR Kabel Ltd.follow · Wire-and-cable volume growth of about 18% (FY27 guide)
Cables
RR Kabel Ltd.follow · Consumer electricals staying at break-even through the weak second quarter
Cables
RR Kabel Ltd.follow · New Silvassa wire lines start
Project milestone · Cables
Rubicon Researchfollow · H1 operating cash catching up with profit once delayed GST refunds arrive
Pharma
Rushil Decorpass · Interest cover staying above 2 times (the rating trigger)
Consumer Durables
Rushil Decorpass · MDF exports back above 4,000 cubic metres a month
Consumer Durables
Saatvik Greenpass · Q2 sales above 1 GW (334 MW in Q1)
Solar PV Cells EPC
Saatvik Greenpass · A permanent finance chief appointed
Solar PV Cells EPC
Saatvik Greenpass · Cell line passes ALMM inspection
Project milestone · Solar PV Cells EPC
Saatvik Greenpass · Site work starts
Project milestone · Solar PV Cells EPC
Sagilityown · Q2 company-adjusted margin at 24% or better with the full wage hit included (guide 24–25%)
Software
Sahasra Electronicavoid · Chip-packaging revenue near ₹20–25cr in H1 FY27
EMS & Electronics
Sahasra Electronicavoid · Clean stock accounting (records tallying with physical stock)
EMS & Electronics
Sai Life Sciencesfollow · The second big-pharma dedicated-team contract closing in Q2
Pharma CDMO
Sai Life Sciencesfollow · Manufacturing growth back in double digits (was +6% in Q1)
Pharma CDMO
Sai Silks (Kalamandir)wait · No further store closures
Retail
Sakar Healthcarewait · Cancer-drug exports above ₹15cr a quarter
Pharma
Sakar Healthcarewait · Inventory days falling at the half-year
Pharma
Saksoftwait · FY27 ₹1,200–1,250cr target kept at the post-Q2 review (may be restated)
Software
Salzer Electronicspass · A decision on the near-idle smart-meter plant
Electrical Equipment
Sambhv Steel Tubesfollow · Operating profit a tonne within the ₹7,500–8,500 guide as pipe prices ease
Iron and Steel
Samhi Hotelsown · The ₹750cr share authority stays unused, or is used at a fair price
Hotels and Travels
Samhi Hotelsown · Same-store RevPAR growth of 9–11% (promise)
Hotels and Travels
Sansera Engineeringfollow · New hangar's part approvals and NADCAP for surface treatment
Aerospace defence
Saregama Indiawait · Music revenue keeps growing at the guided 20–23% a year against a higher base in Q2 FY27
Media and Entertainment
Saregama Indiawait · Music EBITDA margin within the guided 60–65%
Media and Entertainment
Sastasundar Venturesavoid · Working capital back below 20 days
Retail
Sastasundar Venturesavoid · Move to the new, double-size West Bengal warehouse (around September)
Project milestone · Retail
Schneider Ele. Infraavoid · The promised product-mix disclosure published
Electrical Transformers
Scoda Tubeswait · Quarterly revenue near ₹175cr, needed for the FY27 guide (best quarter so far ₹152cr)
Iron and Steel · expected at least ₹175cr
Sedemac Mechatronicswait · Operating margin holds or improves from Q1 FY27 (about 19%)
Auto Related · expected at least 19%
Sedemac Mechatronicswait · A starter-generator win at a second large vehicle maker
Auto Related
Sedemac Mechatronicswait · The GST search closes without a demand
Auto Related
Senores Pharmaceuticwait · Unbilled profit-share balance (₹172cr) falling at the half-year
Pharma CDMO
Sequent Scientificfollow · Drug-ingredient (API) sales rebound in Q2, which management called its best quarter ever
Pharma Others
Sequent Scientificfollow · Bioforlife (Italy) acquisition closed
Pharma Others
Sequent Scientificfollow · Profit rising as acquisition amortisation falls from ₹25cr in Q1 to ₹10–11cr in Q2
Pharma Others
Servotech Renewavoid · Operating cash turning positive
Electrical Equipment
Servotech Renewavoid · Receivables below 90 days
Electrical Equipment
Servotech Renewavoid · Cost and funding of the ₹400cr Haryana plant disclosed
Electrical Equipment
SG Martwait · Solar volumes above 8,000 tonnes a month (under half of plan in Q1)
Retail
SH Kelkar & Cowait · Operating margin above 13% without one-offs
Chemicals · expected at least 13%
Sh. Pushkar Chem.follow · Promoter loans of ₹21cr repaid
Chemicals
Shadowfax Tech.follow · Q2 FY27 revenue growth in line with the raised 38–40% guide
Logistics · expected at least 38%
Shaily Engg. Plasticfollow · Dr Reddy's restarting semaglutide supply
Plastics
Shaily Engg. Plasticfollow · Second pen line reaching 80% efficiency
Plastics
Shaily Engg. Plasticfollow · A pen contract with an original (global) drug maker
Plastics
Shaily Engg. Plasticfollow · Second line operational, pen capacity about 75 million
Project milestone · Plastics
Shaily Engg. Plasticfollow · Update on the South plant (land, start) on the Q2 call
Project milestone · Plastics
Shaily Engg. Plasticfollow · Second 25-million pen line running, pen capacity about 75 million a year
Plastics
Shakti Pumpspass · Module line running from September 2026
Pumps Comp & Eng
Shakti Pumpspass · A quarter of falling receivables (₹1,799cr at Q1)
Pumps Comp & Eng
Shakti Pumpspass · PM-KUSUM 2.0 approved, at prices above Maharashtra's, with state agencies paying
Pumps Comp & Eng
Shakti Pumpspass · 0.5 GW module plant starts (September 2026)
Project milestone · Pumps Comp & Eng
Shakti Pumpspass · Expanded pump capacity available
Project milestone · Pumps Comp & Eng
Shalbypass · Standalone hospital margin back near 20% by Q2 (promised “significant upside”; Q1: 18.4%)
Hospitals
Shalbypass · Implant stock (651 days) stops growing or falls by September
Hospitals
Shalbypass · A clear funding plan for the ₹300cr Mumbai project, or it dropped
Hospitals
Shalbypass · Implant segment loss narrowing from FY26 (−₹35cr before tax for the year; −₹40cr in FY25)
Hospitals
Shalbypass · Consolidated operating cash clearly positive for the half year (FY25 −₹4cr, FY26 about zero)
Hospitals
Shalbypass · Borrowings flat or falling at September (interest already ₹41cr a year, up from ₹8cr in FY22)
Hospitals
Sharda Cropchemown · European volumes recovering in Q2 after the Q1 heatwave, with gross margin above 35%
Agrochemical & Fertilizers
Sharda Cropchemown · No write-off of registrations as spending rises to ₹480–550cr a year
Agrochemical & Fertilizers
Sheela Foampass · Operating margin inside the 11–12% band, as guided (10.6% in Q1)
Consumer Durables · expected at least 11%
Shilchar Tech.follow · Exports back above 40% of sales as Gulf freight eases
Electrical Transformers
Shilpa Medicarewait · A clean US re-inspection at the Jadcherla formulation plant
Pharma API
Shilpa Medicarewait · Profit without one-offs: tax back to about 25% and no associate or sale gains
Pharma API
Shilpa Medicarewait · Margin staying in a similar range of about 30%, as management expects
Pharma API
Shilpa Medicarewait · Free cash flow turning positive
Pharma API
Shiprocketwait · Adjusted EBITDA stays positive and per transaction stays above Q1's ₹1.45 (the CFO said it is improving every quarter)
Platform Cos
Shiprocketwait · Contribution margin holds around 19% (19.4% in Q1), as guided, and the newer businesses' rupee loss (₹43.8cr in Q1) stops growing
Platform Cos
Shiprocketwait · Revenue of at least ₹600cr in Q2, above Q1's ₹592cr (my threshold, not guidance; management flags only Q3 as seasonally weak)
Platform Cos · expected at least ₹600cr
Shoppers Stopwait · Like-for-like sales growth of about 6%, as guided (raised)
Retail
Shree Ganesh Remed.avoid · Quarterly revenue back above ₹30cr (Q1: ₹14.4cr)
Pharma API · expected at least ₹30cr
Shree Ganesh Remed.avoid · Block 7 (~₹34cr) starting in Q2 FY27
Pharma API
Shree Ganesh Remed.avoid · Block 7 in commercial production
Project milestone · Pharma API
Shree Refrigrationswait · H1 FY27 revenue growth near the guided 40% (a steadier first half)
Industrials · expected at least 40%
Shree Refrigrationswait · H1 FY27 operating margin within the guided 20–24%
Industrials · expected at least 20%
Shree Refrigrationswait · Spares and service rising back toward 15% of sales (7% now)
Industrials
Shree Refrigrationswait · First-half results showing growth on the 40% a year path
Project milestone · Industrials
Shriram Pistonsfollow · Legacy standalone margin back above 22% in Q2 FY27
Auto Related
Shyam Metalicsfollow · Operating margin of 14–15% (guidance)
Iron and Steel · expected at least 14%
Shyam Metalicsfollow · The Enforcement Directorate attachment on the subsidiary lifted
Iron and Steel
Shyam Metalicsfollow · Aluminium flat-rolled plant commissioned
Project milestone · Iron and Steel
Sigachi Industriespass · Insurance money actually received (promised by September 2026)
Pharma Others
Sigachi Industriespass · A funding plan after the rejected ₹290cr fundraise, with no pledge invocation
Pharma Others
Sigachi Industriespass · Quarterly revenue jumping toward ₹175–185cr to meet FY27 guidance (₹121cr in Q1)
Pharma Others · expected at least ₹175cr
Signatureglobal Ind.wait · Collections back above about ₹1,100cr a quarter
Realty
Sirca Paintspass · Revenue growth back above 20% in Q2 FY27 (13.8% in Q1)
Consumer Durables · expected at least 20%
Sirca Paintspass · Debtor and inventory days falling as promised
Consumer Durables
Sirca Paintspass · Holds an earnings call
Consumer Durables
SJS Enterprisesfollow · Disclosure and a clean outcome of the Walter Pack India inquiry
Auto Related
SJS Enterprisesfollow · Company EBITDA margin within the 27–28% guide
Auto Related
SJS Enterprisesfollow · Growth at 1.5–2 times the industry, as guided
Auto Related
SKF Indiawait · Pre-tax margin above 13% in Q2 without stock revaluation gains
Bearings
Skipperfollow · Expansion commissioned
Project milestone · Construction - Power
Smartworks Coworkingwait · Operating cash back above 1.1x EBITDA
Commercial Services
Smartworks Coworkingwait · Rent-adjusted margin moving above 20% (guide 19–20%)
Commercial Services
SMS Pharmaceuticalspass · Growth back towards 15% in Q2–Q3, showing Q1's 6% was a blip
Pharma API · expected at least 15%
SMS Pharmaceuticalspass · Operating margin moving towards 22%, as guided (20% in Q1)
Pharma API · expected at least 22%
SMS Pharmaceuticalspass · H1 operating cash above 60% of operating profit (49% in FY26)
Pharma API
Solara Active Pharmawait · The ibuprofen decision announced at Q2 results, ideally ending the losses without a large write-down
Pharma API
Solara Active Pharmawait · Base-business margin holding near 25% (±1), as guided (23.5% in Q1)
Pharma API
Solarworld Energy Sopass · Q2 FY27 revenue above ₹400cr (Q1: ₹168cr)
Construction · expected at least ₹400cr
Solarworld Energy Sopass · Operating cash turning positive in H1 FY27
Construction
Solarworld Energy Sopass · AGM vote on moving IPO money into the 50:50 cell venture: rejected, or full terms given
Construction
Solex Energywait · Operating margin back above 11% (fell from 16% to 11% in Q1)
Solar PV Cells EPC · expected at least 11%
Solex Energywait · Funding and power approval closed for the ₹1,050cr cell plant (June deadline missed)
Solar PV Cells EPC
Somany Ceramicswait · Operating margin above 11% as Morbi recovers and gas eases
Consumer Durables · expected at least 11%
Somany Ceramicswait · A clear answer on who owns and funds the Tirupati plant
Consumer Durables
Somany Ceramicswait · Tile volume growing at least mid-single digits, as guided (3% in Q1)
Consumer Durables
Sona BLW Precisionwait · Operating margin back above 24% from Q2 FY27, as promised
Auto Related · expected at least 24%
Sonata Softwarewait · Top five international clients growing again; 'positive traction every quarter' from Q2
Software
Sonata Softwarewait · No further Microsoft direct billing in India
Software
South West Pinnaclefollow · H1 FY27 operating cash catching up with profit (FY26: ₹12cr against ₹33cr of profit)
Oil
Stallion India Fluorpass · No further equity raise or dilution
Chemicals
Standard Glassavoid · Working capital below 200 days by September 2026, as promised
Industrials
State Bank of Indiaown · The ECL (expected-loss provisioning) impact disclosed with Q2 results, and small
Finance
State Bank of Indiaown · Domestic margin at or above 3%, as guided
Finance
State Bank of Indiaown · Early-overdue large loans (SMA-2, ₹1,687cr) falling back, not turning bad
Finance
Steel Strips Wheelswait · Exports back above ₹150cr a quarter
Auto Related
Steel Strips Wheelswait · The ₹400–500cr of factoring disclosed plainly
Auto Related
Steelcastown · Q2 tonnes well above 4,500 (Q1 grew only 11.6%)
Forging
Steelcastown · Operating margin (excluding other income) rising above Q1's flat 25.6%, moving toward 28%
Forging · expected at least 25.6%
Sterling and Wilsonpass · Q2 FY27 revenue near ₹1,600cr
Construction · expected at least ₹1,600cr
Sterling and Wilsonpass · The Reliance order signed on fair terms
Construction
Sterling and Wilsonpass · No further legacy charges, and indemnity cash arriving
Construction
Sterling Toolswait · EV-arm losses fall below ₹5cr a quarter
Auto Related
Sterling Toolswait · Standalone fastener margin stays above 15% as dearer steel arrives
Auto Related
Sterling Toolswait · Charger and multi-function-unit lines commissioned
Project milestone · Auto Related
Stove Kraftpass · H1 FY27 margin above 11% (Q2 margin at least 11%)
Consumer Durables · expected at least 11%
Stove Kraftpass · Working capital back under 30 days
Consumer Durables
Stove Kraftpass · IKEA billing visibly from Q2
Consumer Durables
Strides Pharmawait · FDA response on the Bengaluru plant
Pharma
Strides Pharmawait · Sandoz Africa deal closes in Q2 and contributes from H2
Pharma
Studds Accessoriesfollow · Operating margin back to 14–15% in Q2 FY27, as management guided
Auto Related · expected at least 14%
Studds Accessoriesfollow · Inventory days coming back below 100
Auto Related
Stylam Industriefollow · Domestic sales growing at last
Consumer Durables
Styrenix Performancefollow · Thai plant volume above 18,000 tonnes a quarter
Chemicals
Subrospass · Customers compensate the wage rises: operating margin back above 9.5%
Industrials · expected at least 9.5%
Sudarshan Chemicalsfollow · Q2 FY27 business EBITDA margin at 9% or better
Chemicals
Sudarshan Chemicalsfollow · FY27 guidance (revenue ₹9,800–10,200cr, EBITDA ~₹800cr) raised after Q2
Chemicals
Sudarshan Chemicalsfollow · €76.5m VP4 sale closes, making the company net cash
Chemicals
Sudeep Pharmawait · H1 operating cash catching up with profit; working capital heading to 150–160 days
Pharma Others
Sudeep Pharmawait · FDA approval for the new plant
Project milestone · Pharma Others
Sunteck Realtyfollow · Nepean Sea Road gets RERA registration and construction starts
Realty
Suprajit Engineeringwait · Operating cash above 70% of operating profit
Auto Related
Suprajit Engineeringwait · Group operating margin in the 12–13.5% guided band
Auto Related · expected at least 12%
Suprajit Engineeringwait · Indian cables margin back towards 14% as wage costs are recovered
Auto Related
Supreme Petrochemwait · New ABS line running above 80% of capacity
Chemicals
Supreme Petrochemwait · Quarterly volume back above 90,000 tonnes
Chemicals
Supreme Petrochemwait · Operating margin back to a normal 9–11%
Chemicals · expected 9%–11%
Supreme Powerfollow · Quarterly revenue above ₹75cr
Electrical Transformers · expected at least ₹75cr
Supriya Lifesciencewait · Operating margin back above 33% in Q2 (25% in Q1; guide 32–35%)
Pharma API · expected at least 33%
Suraj Estatepass · Statutory dues (income and advance tax) paid on time
Realty
Suraksha Diagnosticwait · Test-volume growth back towards 20% (halved to 10–11%)
Healthcare Diagnostic
Suraksha Diagnosticwait · Margin holding at 34% or more (raised guidance, company basis)
Healthcare Diagnostic
Swiggywait · Instamart order value growing 10%+ a quarter while its contribution margin stays within 0 to −1%
Platform Cos
Swiggywait · About 75 new dark stores opened
Project milestone · Platform Cos
Symphonywait · No new money put into the Australian arm, as promised
Consumer Durables
Symphonywait · A new group CEO appointed
Consumer Durables
Synergy Greenpass · Q2 sales above ₹120cr (Q1: ₹75cr)
Forging · expected at least ₹120cr
Synergy Greenpass · Operating margin back above 13% in Q2 (Q1: about 6%)
Forging · expected at least 13%
Synergy Greenpass · Net debt stops rising (about ₹234cr now) and the next plant's funding is set out
Forging
Syngene Internationalwait · No further cut to FY27 guidance (single-digit revenue decline)
Healthcare
Syngene Internationalwait · Named manufacturing wins at the Bayview plant
Healthcare
Syrma SGS Tech.follow · Operating margin back inside the 10.5–11% guided band
EMS & Electronics · expected at least 10.5%
Syrma SGS Tech.follow · Working-capital days back toward 63 (from 71) in Q2
EMS & Electronics
TAC Security (Tac Infosec)avoid · Q2 total income of about ₹24cr
Software
TAC Security (Tac Infosec)avoid · Debtor days falling below 90 (145 now)
Software
Talbros Auto Compontown · Marelli's stake sale in the chassis joint venture concludes cleanly (promised by 30 September)
Auto Related
Tanfac Industrieswait · Operating margin 16% or more from Q2 FY27 (guide 16–19% before R-32)
Chemicals · expected at least 16%
Tanla Platformsfollow · ValueFirst Middle East purchase completed by Q2 (signed 28 July after a missed 'committed' date)
Software
Tanla Platformsfollow · Operating margin holding at 16% as WhatsApp prices change
Software · expected at least 16%
Tanla Platformsfollow · Digital Platforms revenue growing again after a flat Q1 (₹103cr)
Software
Tanla Platformsfollow · Revenue growth 'definitely more than 10%', as promised (17.8% in Q1)
Software · expected at least 10%
Tanla Platformsfollow · Deal completed (promised for Q4 FY26, now Q2)
Project milestone · Software
Tarsons Productspass · Back to profit in Q2 after the ₹1.4cr Q1 loss (promised no accounting losses)
Health Products · expected at least ₹0cr
Tarsons Productspass · Remaining facilities fully commissioned
Project milestone · Health Products
Tata Chemicalswait · Net debt cut from cash flow, not asset sales (guide: similar to March)
Chemicals
Tata Chemicalswait · No write-down of US mining rights
Chemicals
Tata Chemicalswait · Chinese soda-ash stocks falling below about 1.2 Mt
Chemicals
Tata Technologieswait · Quarterly operating margin reaching 17% or better (stuck at 16%)
Software · expected at least 17%
Tatva Chintanwait · Operating margin back inside the 20–22% band
Chemicals · expected at least 20%
TBO Tekwait · FEMA adjudication without a large penalty (up to three times ₹71.2cr)
Platform Cos
TBO Tekwait · Organic gross-profit growth back above 20% (16% in Q1)
Platform Cos
TCPL Packagingfollow · Operating margin holding near 17–18% as flexible packaging grows faster
Packaging · expected at least 17%
TCPL Packagingfollow · Net debt below 1.5 times operating profit (1.75 times now)
Packaging
TD Power Systemsfollow · Large-generator capex plan announced on the Q2 FY27 call, as promised
Electrical Equipment
TD Power Systemsfollow · Quarterly order inflow holding near ₹700cr
Electrical Equipment
TD Power Systemsfollow · Receivables growing more slowly than sales (debtor days not above 146)
Electrical Equipment
TD Power Systemsfollow · Plan, products and cost of the next capacity round announced
Project milestone · Electrical Equipment
Techno Electric &Engwait · Operating cash flow turning positive as contract assets are billed (helped by selling the Ishanagar and Dhule lines)
Construction - Power
Techno Electric &Engwait · A signed contract with a large cloud tenant for the data centres
Construction - Power
Tega Industrieswait · Group operating margin about 15% in the first full Molycop quarter (guidance)
Industrials · expected at least 15%
Tempsens Instrumentswait · Inventory days falling from 170
Industrials
Tenneco Clean Airfollow · Half-year lifetime order book at or above ₹12,400cr
Auto Related · expected at least ₹12,400cr
Tenneco Clean Airfollow · Margin on value-added revenue back above 18.5%
Auto Related
Texmaco Railpass · No use or write-back of the ₹700cr provision taken from reserves
Industrial - Railway
Texmaco Railpass · Wagon output back above 2,000 a quarter (1,054 in Q1)
Industrial - Railway
Texmaco Railpass · Collection of the ₹765cr of unbilled infrastructure work
Industrial - Railway
The Anup Engineewait · Q2 FY27 revenue above ₹200cr
Industrials · expected at least ₹200cr
The Anup Engineewait · Q2 FY27 operating margin back above 15%
Industrials · expected at least 15%
The Anup Engineewait · Order intake of ₹200–250cr a quarter (guidance)
Industrials
Thyrocare Technologieswait · Docon's 100% pledge falling as API Holdings repays debt
Healthcare Diagnostic
Time Technoplastown · Composite cylinder orders from the oil companies
Plastics
Timken Indiawait · Bharuch revenue above ₹80cr a quarter (was ₹50cr in Q1)
Bearings
Timken Indiawait · Operating margin back over 20%
Bearings · expected at least 20%
Timken Indiawait · Bharuch spherical lines at about 70% use by August–September
Bearings
Timken Indiawait · Spherical roller lines reach about 70% use
Project milestone · Bearings
Tinna Rubberfollow · Pyrolysis oil sales start from Q2 FY27
Rubber
Tinna Rubberfollow · Commercial sales of pyrolysis oil begin
Project milestone · Rubber
Tips Musicwait · YouTube Shorts renewal (due June 2026) signed, ideally with an advertising share
Media and Entertainment
Titagarh Railsystemswait · The one-lakh-wagon tender issued or awarded
Industrial - Railway
Titagarh Railsystemswait · Coach output of 45–50 a quarter (30 in Q1)
Industrial - Railway
Transformers & Rectwait · Positive operating cash in H1 FY27
Electrical Transformers
Transformers & Rectwait · Quarterly revenue above ₹750cr in Q2–Q3 FY27
Electrical Transformers · expected at least ₹750cr
Transformers & Rectwait · Copper-conductor plant starting in Q2 FY27, the first backward-integration step
Electrical Transformers
Transformers & Rectwait · Conductor plant commissioned
Project milestone · Electrical Transformers
Transrail Lightingfollow · ₹79cr Burberry Infra loan and ₹25cr of interest repaid by 30 September 2026, as management promised
Construction - Power
Transrail Lightingfollow · The March 2026 income-tax search ends without a tax demand
Construction - Power
Transrail Lightingfollow · Doubled conductor capacity starts production
Project milestone · Construction - Power
Transrail Lightingfollow · IPO Phase 1 capex finished, tower capacity about 1,96,000 tonnes
Project milestone · Construction - Power
Triveni Turbinewait · First US combined-cycle product order won
Electrical Equipment
TruAlt Bioenergywait · Q2 FY27 ethanol volume meets its 11 crore litre plan
Oil
TruAlt Bioenergywait · Promoter pledge (about 26% of shares) released this quarter, as promised in July
Oil
TTK Prestigefollow · Revenue growth staying in double digits in Q2 FY27 after the price rises
Consumer Durables · expected at least 10%
TTK Prestigefollow · No new write-down at the UK unit or Ultrafresh
Consumer Durables
Turtlemint Fintechpass · Revenue of at least ₹350cr in Q2, bigger than Q1 (₹294cr) and about 40% above a year earlier, as guided
Platform Cos · expected at least ₹350cr
Turtlemint Fintechpass · Operating loss narrower than Q1's ₹33cr (adjusted EBITDA loss narrower than ₹26cr), with overheads no more than 22% of revenue
Platform Cos · expected at least ₹-33cr
Turtlemint Fintechpass · Service EBITDA margin (after agent pay) at least 14% (13.3% in Q1) and renewals at least 22% of revenue, on the path to about 16%
Platform Cos
TVS Electronicsavoid · Return to profit in Q2 after the ₹6.6cr June-quarter loss
Hardware · expected at least ₹0cr
TVS Electronicsavoid · Operating margin above 5% in Q2 (first of two quarters needed)
Hardware · expected at least 5%
TVS Electronicsavoid · Circuit-board lines above 40% used, and a results call held
Hardware
TVS Supply Chain Solwait · Supply-chain segment margin at 9% in Q2 FY27 (8.1% in Q1)
Logistics
TVS Supply Chain Solwait · Forwarding margin holding near 4% as freight rates ease
Logistics
Unimech Aerospacewait · Serial parts and the FACC contract replacing one-off tooling
Aerospace defence
Unimech Aerospacewait · Size and price of the ₹750cr share sale
Aerospace defence
Uniparts Indiaown · Q2 FY27 revenue in line with Q1 (₹347cr), as guided
Auto Related · expected at least ₹340cr
Uniparts Indiaown · Operating margin stays above the 20% the company calls normal through the cycle
Auto Related · expected at least 20%
United Heat Transferavoid · H1 FY27 revenue growth of 30–35% as guided
Industrials · expected at least 30%
United Heat Transferavoid · Repeat Vertiv orders beyond the trial order
Industrials
United Heat Transferavoid · The rating agency (Crisil) receiving information again
Industrials
Updater Serviceswait · Revenue growth of 9–12% as indicated
Commercial Services · expected at least 9%
Updater Serviceswait · IFM segment margin holding at 4.5% or better
Commercial Services
Urban Companywait · InstaHelp's absolute loss shrinking, not just per order (₹132cr in Q1)
Platform Cos
Urban Companywait · Core India services margin holding (6.9% in Q1) in the seasonally weaker Q2, heading to 9–10%
Platform Cos
V-Guard Industrifollow · Operating margin holding near 10% in Q2 FY27 as the price rises fade
Consumer Durables · expected at least 9.5%
V-Mart Retailfollow · Gross margin holds near 34–35% (Q2 flagged as weaker)
Retail
Varroc Engineeringwait · Second traction-motor customer starts production
Project milestone · Auto Related
Vasa Denticitypass · Gross margin rising toward the 27–30% target in Q2
Health Products
Vasa Denticitypass · Positive operating cash for the September half-year
Health Products
Vedant Fashions (Manyavar)wait · The promised dividend or buyback policy announced
Retail
Venkys Indiawait · Receivables from group companies falling
Food Products
Venkys Indiawait · A return to regular earnings calls and presentations
Food Products
Venkys Indiawait · Animal-health margin of 22–23%, as guided
Food Products
Venus Pipes & Tubeswait · Operating margin above 17%
Iron and Steel · expected at least 17%
Viceroy Hotelswait · No further related-party purchases
Hotels and Travels
Vijaya Diagnostic Centrewait · Operating margin above 40% as the nine new hubs open
Healthcare Diagnostic · expected at least 40%
Vijaya Diagnostic Centrewait · No further CFO or senior finance departures
Healthcare Diagnostic
Vikram Solarpass · A revised FY27 outlook given with the H1 results (₹1,500–1,600cr operating-profit guide was withdrawn)
Solar PV Cells EPC
Vikram Solarpass · Land and state incentives for the LFP cell plant finalised
Project milestone · Solar PV Cells EPC
Vilas Transcorepass · Positive operating cash in H1 FY27
Industrials
Vilas Transcorepass · PAT margin holding at 7% or more (guidance)
Industrials
Vimta Labsfollow · Revenue growth of 15% or more in Q2 (first of two quarters; Q1: +11.8%)
Healthcare · expected at least 15%
Vimta Labsfollow · First overseas biologics orders
Healthcare
Vinyas Innovativwait · H1 FY27: March receivables collected and operating cash positive
EMS & Electronics
Vinyas Innovativwait · H1 FY27 operating margin within the raised 11–12% guide
EMS & Electronics · expected at least 11%
Vinyas Innovativwait · New capacity available
Project milestone · EMS & Electronics
Virtuoso Optoelectroavoid · Operating margin within the 9–10% guided
EMS & Electronics · expected at least 9%
Virtuoso Optoelectroavoid · Compressor utilisation rising from just over 50% toward the ~80% expected
EMS & Electronics
Virtuoso Optoelectroavoid · The ₹8.61cr advance to a manager's relative recovered
EMS & Electronics
Voltamp Transformerswait · Order book rising above ₹2,000cr
Electrical Transformers · expected at least ₹2,000cr
Voltamp Transformerswait · No further promoter selling after the 7.8% block sale
Electrical Transformers
Voltaswait · Cooling (unitary) segment margin above 6% in Q2 FY27
Consumer Durables
Voltaswait · Voltbek's loss (about ₹130cr a year) narrowing
Consumer Durables
VST Tillers Tractorswait · FY27 guidance given, as promised for September
Vehicles
Waaree Renewablesfollow · Third-party orders lift the solar order book above 2,425 MWp
Solar PV Cells EPC
Waaree Renewablesfollow · Operating margin holds at or above the new ~15% aim (18.8% in Q1)
Solar PV Cells EPC · expected at least 15%
Websol Energy System Ltdwait · Margin holds at about the lowered 34% anchor (fell every quarter from 47%)
Solar PV Cells EPC · expected at least 34%
Websol Energy System Ltdwait · Land and equipment orders secured for the West Bengal 4 GW expansion
Solar PV Cells EPC
Websol Energy System Ltdwait · Remaining promoter share pledges released
Solar PV Cells EPC
Welspun Enterpfollow · Quarterly revenue back above ₹1,000cr
Construction · expected at least ₹1,000cr
Welspun Enterpfollow · Aunta–Simaria sale closing in Q2 FY27
Construction
WeWork Indiawait · Filed profit after tax turns positive (Q1: loss of ₹4cr)
Commercial Services · expected at least ₹0cr
WeWork Indiawait · Rent-adjusted margin holding at 19–20% as 20,000 new desks open
Commercial Services
Wheels Indiawait · Aluminium wheel output reaches 60,000 a month
Auto Related
Wheels Indiawait · No further rise in capex guidance (now ₹400–450cr)
Auto Related
Whirlpool Indiawait · Operating margin back above 6% (5.1% in Q1)
Consumer Durables · expected at least 6%
Whirlpool Indiawait · A buyer for the parent's controlling stake named, with the open-offer price
Consumer Durables
Windlas Biotechown · Plant 6 opens at the end of Q2 and starts filling from Q3
Pharma CDMO
Windlas Biotechown · Trade generics returning to growth after the codeine ban (−32% in Q1)
Pharma CDMO
Windlas Biotechown · Plant 6 commercial
Project milestone · Pharma CDMO
WPILwait · Operating margin within the guided 15–20% band
Industrials · expected at least 15%
Xtranet Technologiespass · First-half revenue of at least ₹200cr
Software
Xtranet Technologiespass · ₹33.6cr of over-three-year receivables collected or provided for
Software
Yash Highvoltagefollow · H1 FY27 revenue of ₹140–150cr
Electrical Transformers · expected at least ₹140cr
Yash Highvoltagefollow · Operating cash above half of EBITDA in H1 FY27
Electrical Transformers
Yasho Industrieswait · Operating margin holding near 24% as raw-material shortages ease
Chemicals · expected at least 24%
Yasho Industrieswait · Debt falling below 2.5 times trailing operating profit
Chemicals
Yatharth Hospitalfollow · Margin close to or above 24% (Q1: 23.3%, company basis)
Hospitals
Yatharth Hospitalfollow · Receivable days falling to 90–95 and old receivables collected (29% over a year old)
Hospitals
Yatharth Hospitalfollow · ₹59.7cr tax demand won on appeal
Hospitals
Yatra Onlinepass · SEBI/NSE query over IPO-money usage closed
Travel Services
Yatra Onlinepass · Kanoo Travel partnership turning profitable from Q2, as promised
Travel Services
Zaggle Prepaidwait · A Q2 operating-cash-flow figure disclosed
Software
Zelio E-Mobilitywait · Operating cash flow positive in the H1 FY27 results (November)
Vehicles
Zelio E-Mobilitywait · Revenue growth of 75–80% a year, as management talks of
Vehicles · expected at least 75%
Zelio E-Mobilitywait · Related-party sales kept small (approval sought for related-party dealings)
Vehicles
Zensar Technologiesown · Quarterly bookings back to $180–200M ($149.2M in Q1)
Software
Zensar Technologiesown · Q2 revenue above Q1, as guided
Software
Zota Health Carepass · Positive operating profit in Q2, as promised
Pharma Others · expected at least ₹0cr
Zydus Lifesciencesfollow · Operating margin holding about 24% through the Saroglitazar launch spending
Pharma · expected at least 24%
Zydus Lifesciencesfollow · H1 operating cash recovering from FY26's 25% cash conversion
Pharma
Zydus Lifesciencesfollow · The June 2026 US warning letter at Baddi closed
Pharma
Q3 FY27
100% hit · 2 met, 0 partly, 0 missed · 495 pendingBorosilpass · Bharuch glassware plant commissioned
Project milestone · Consumer Durables · actual Bharuch plant dropped by Borosil; it goes to Borosil Scientific (NSE filing, Sep 2026) · judged in review · No longer a Borosil project
Kalpataru Proj.follow · A first large Middle East oil and gas order, expected by Q3
Construction - Power · actual UAE gas pipeline EPC order worth over ₹4,000cr (Major), 28 Sep 2026 (NSE filing) · judged in review · Stays follow; the Gulf question is closed, the margin and water collections remain the test
Voltamp Transformerswait · New plant starts production (October 2026)
Project milestone · Electrical Transformers · actual Commercial production began 7 Oct 2026 · judged in review · Stays wait; the plant started on its revised October date, three months after the original July
Pending (495)
20 Micronsown · Quarterly revenue above ₹250cr in H2 FY27 (Q3)
Mining & Metals Recycle · expected at least ₹250cr
Aarti Drugsfollow · Sayakha methylamine plant supplying 80–90% of its own needs by December 2026
Pharma API
Aarti Drugsfollow · Sayakha supplying 80–90% of its methylamine needs (by December)
Project milestone · Pharma API
Action Const.Eq.follow · KATO heavy-crane joint venture earning from Q3 FY27
Vehicles
ADF Foodsfollow · Phase 2 line starts at Surat
Project milestone · Food Products
Aditya Birla Lifestyfollow · Van Heusen Innerwear reaches its first profitable quarter (Q3 is the target)
Retail
Aditya Infotechwait · Housing plant phase 1 operational
Project milestone · Industrials
Advait Energyavoid · Battery plant installed in Q3 FY27
Cables
Advait Energyavoid · Battery plant machinery installed
Project milestone · Cables
Advanced Enzymefollow · New R&D centre operational
Project milestone · Pharma Others
Aegis Logisticsfollow · First phase of JNPA liquid tanks (~100,000 cubic metres) commissioned
Project milestone · Logistics
Aegis Vopak Terminalswait · JNPA phase 1 (first 100,000 cbm) starts in Q3 FY27, after slipping from Q1
Oil
Aegis Vopak Terminalswait · First ~100,000 cbm of liquid storage at JNPA commissioned
Project milestone · Oil
Aequswait · 22 October shareholder vote on the ₹650cr promoter warrants
Aerospace defence
Aeroflex Industrieswait · Skid capacity reaching 15,000 a year by October–November 2026
Iron and Steel
Aeroflex Industrieswait · 15,000-skid capacity commissioned
Project milestone · Iron and Steel
Aether Industriespass · Revenue from the first Panoli blocks
Pharma CDMO
Affle 3ifollow · Operating cash back to 80–85% of profit by Q3, as promised (about 41% in Q1)
Software
Ahluwalia Contr.follow · Operating margin above 8% again in Q3 FY27
Construction · expected at least 8%
Ajmera Realtywait · Boutique-office launch in Q3 FY27
Realty
Ajmera Realtywait · Kanjurmarg freehold conversion done by December 2026
Realty
Akzo Nobelwait · Operating margin back inside 13–15% by Q3 (11.9% in Q1)
Consumer Durables · expected at least 13%
Akzo Nobelwait · The SAP systems switch around Diwali passing without disruption
Consumer Durables
Alembic Pharmawait · US sales holding up after the bosutinib exclusivity ends around November
Pharma
Alicon Castalloywait · Operating margin 11% or more again in Q3 FY27 (second of two quarters)
Auto Related · expected at least 11%
Alivus Life Sciencesown · Revenue of ₹720–740cr a quarter in H2 FY27, which the guide needs (Q1: ₹640cr)
Pharma API · expected at least ₹720cr
Alivus Life Sciencesown · Solapur plant running by Diwali (Q3 FY27)
Pharma API
Alivus Life Sciencesown · Solapur Phase 1 operating (by Diwali)
Project milestone · Pharma API
All Time Plasticwait · Margin above 16% in H2 FY27 (Q3)
Consumer Durables · expected at least 16%
All Time Plasticwait · Order for about 4,000 tonnes more placed
Project milestone · Consumer Durables
Alpex Solarwait · Cell margins of 35–40%, as guided
Solar PV Cells EPC
Alpex Solarwait · Cell line ramped up (management: within about 30 days of opening)
Project milestone · Solar PV Cells EPC
Amara Raja Energyfollow · Operating margin back above 11% by Q3 FY27 as price rises catch up
Auto Related · expected at least 11%
Amara Raja Energyfollow · The 5 GWh storage-system plant starts by end-2026 with orders
Auto Related
Anthem Biosciencesfollow · Q3 revenue above ₹600cr (needs ~28% growth in each of the next three quarters to grow 15% for the year)
Pharma CDMO · expected at least ₹600cr
Antony Waste Handfollow · Pune waste-to-energy plant restarts safely in October
Utilities
Antony Waste Handfollow · New Mumbai wards contract (about ₹190cr a year) starts contributing from Q3 FY27
Utilities
Antony Waste Handfollow · Mumbai seven-ward contract earning
Project milestone · Utilities
Anupam Rasayanpass · Two quarters running of 20%+ organic growth (guide 25% ± 2 points)
Chemicals
Apar Inds.wait · Conductor volume recovering in Q2–Q3 FY27 after Q1's 6.7% fall
Electrical Equipment
Apcotex Indsown · NBR debottlenecking start date confirmed on the Q3 call at about April 2027, not slipping past mid-2027
Rubber
Apcotex Indsown · Final NBR start date confirmed on the Q3 call
Project milestone · Rubber
Apollo Micro Systemsavoid · Premier Explosives consolidating from Q3
Aerospace defence
Apollo Micro Systemsavoid · Premier Explosives consolidated
Project milestone · Aerospace defence
Apollo Tyresown · Transfer of Dutch output to Hungary and India complete
Project milestone · Tyres
Archean Chemical Industriespass · Brine field Phase 1 commissioned
Project milestone · Chemicals
Archean Chemical Industriespass · SOP Phase 2 trials complete
Project milestone · Chemicals
Ashapura Minechemfollow · Q3 FY27 bauxite volume above 3 million tonnes
Mining & Metals Recycle
Ashoka Buildconpass · Three-project sale closing by 31 October 2026
Construction
Asian Energy Servicesfollow · Operating margin back above 12% in Q2–Q3 FY27 (Q1: 8.1% against a 12–13% guide)
Oil · expected at least 12%
Asian Energy Servicesfollow · Oilmax merger completed by September–October 2026 on disclosed final terms
Oil
Astra Microwave Productsfollow · About ₹130cr of warrant money received by December
Aerospace defence
Ather Energywait · AURIC goes live
Project milestone · Vehicles
Atlanta Electricalsown · 400 kV short-circuit test passed in Q2–Q3 FY27
Electrical Transformers
Atlanta Electricalsown · Inverter-duty plant starts production (promised for December 2026)
Project milestone · Electrical Transformers
Atlanta Electricalsown · 400 kV short-circuit test passed
Project milestone · Electrical Transformers
Aurionpro Solutionswait · The ₹350cr data-centre mandate showing up in Q2–Q3 revenue (revenue flat at ₹340–370cr for five quarters)
Software
Aurum Proptechpass · Housing.com losses falling each quarter after the deal closes
Platform Cos
Auto.Axlefollow · Margin holds through the H2 FY27 truck slowdown (profit margin within the 7.5–8.5% guide)
Auto Related
Auto.Axlefollow · 25–30% more capacity in place by December 2026 (about ₹120cr)
Auto Related
Auto.Axlefollow · Phase 1 and 1A complete (end of December 2026)
Project milestone · Auto Related
Avanti Feedswait · Feed margin back above 12% (7.5% in Q1; Q2 expected weak too)
Food Products
AXISCADES Technologiespass · XiDA: growth of the original business shown separately from the business transferred in (which earned a 46.2% margin in Q1), and the two large new customers placing repeat orders
Aerospace defence
Azad Engineeringwait · H2 FY27 revenue growth above 30% as new plants ship
Aerospace defence · expected at least 30%
Azad Engineeringwait · Stabilisation of the new plants fully closed
Project milestone · Aerospace defence
Bajaj Electricalspass · Revenue growth reaching 8% in Q3 FY27
Consumer Durables · expected at least 8%
BASF Indiapass · Celasto line goes live
Project milestone · Chemicals
Belrise Industriespass · Hyva acquisition closes
Project milestone · Auto Related
Bikaji Foodswait · Festive-quarter revenue growth of 15% or more
Food Products · expected at least 15%
Bikaji Foodswait · Festive-quarter operating margin at 13.5% or more
Food Products · expected at least 13.5%
Birlasoftfollow · Two more quarters of constant-currency growth (Q2 and Q3), with no negative quarter
Software
Blue Jet Healthcarewait · Revenue growth on the year positive again in Q3 FY27
Pharma API · expected at least 0%
Blue Jet Healthcarewait · Mahad commercial batches by end-Q2 or early Q3 FY27, running by end-2026
Pharma API
Blue Jet Healthcarewait · Mahad commissioned and commercial batches (end-Q2 or early Q3 FY27)
Project milestone · Pharma API
Blue Starwait · Room-AC margin recovering in Q3 towards the cut guide of over 6.5% (2.9% in Q1)
Consumer Durables
Blue Starwait · October decision on a new Sri City line
Consumer Durables
Blue Starwait · Board decides on the new Sri City line (October 2026)
Project milestone · Consumer Durables
Borosilpass · Operating margin of 17–18% in Q3 FY27
Consumer Durables · expected at least 17%
Brigade Hotel Ven.wait · Chennai WTC Courtyard opening in October 2026
Hotels and Travels
Brigade Hotel Ven.wait · Chennai Courtyard opens (October 2026)
Project milestone · Hotels and Travels
Camlin Fineavoid · Double-digit operating margin in Q3 FY27, as promised
Chemicals · expected at least 10%
Camlin Fineavoid · Diphenol plant decision by Q3 FY27
Chemicals
Camlin Fineavoid · Decision to restart or repurpose the diphenol plant
Project milestone · Chemicals
Campus Activewearwait · Operating margin back in the 17–19% band in the second half (Q3)
Consumer Durables · expected at least 17%
Campus Activewearwait · Stock falling back toward ₹415cr after the festive season (₹500cr now)
Consumer Durables
Capacite Infraproj.wait · Q3 FY27 revenue above ₹850cr (needed for the reaffirmed 20% growth)
Construction · expected at least ₹850cr
Capacite Infraproj.wait · SAP system goes live
Project milestone · Construction
Capillary Technologiesfollow · Kognitiv and SessionM migrations lifting gross margin
Software
Carborundum Univer.follow · Foskor and Awuko exits closed by Q2–Q3 FY27
Industrials
Cartrade Techown · Operating margin above 31% in Q3, as guided for Q2–Q4
Platform Cos · expected at least 31%
CEATfollow · Camso's operating profit turns positive after the customer move completes in September
Tyres
CEATfollow · Standalone operating margin back above 12% as price rises catch up (9.1% in Q1)
Tyres
Ceigall Indiawait · The two remaining project sales to Neo closing in Q2–Q3
Construction
Cello Worldwait · Volume growth in the Q3 festive quarter, with steel and glass plants filling
Consumer Durables
Cello Worldwait · Steel-bottle designs reaching 50–55 and glass plant use above 70%
Consumer Durables
Cello Worldwait · Designs made in-house rise to 50–55
Project milestone · Consumer Durables
Cemindia Projectsfollow · Q3 FY27 revenue of ₹3,000–3,500cr
Construction · expected at least ₹3,000cr
Century Plyboards(I)wait · Hoshiarpur plywood plant starting on time in Q3 FY27
Consumer Durables
Century Plyboards(I)wait · Hoshiarpur plant starts operations (October 2026)
Project milestone · Consumer Durables
Century Plyboards(I)wait · Chennai reaches 12,500 cubic metres a month
Project milestone · Consumer Durables
Cera Sanitarywarefollow · H2 operating margin back at 14% (Q3 FY27)
Consumer Durables · expected at least 14%
Chambal Fert & Chemfollow · Gadepan-3 urea terms after December 2026 published and close to the old ones
Agrochemical & Fertilizers
Chambal Fert & Chemfollow · Board decision on the ₹9,500–10,000cr fourth urea plant after mid-October bids
Agrochemical & Fertilizers
Chambal Fert & Chemfollow · Ammonium nitrate sales entering the accounts from Q3 FY27
Agrochemical & Fertilizers
Chambal Fert & Chemfollow · High-density ammonium nitrate commissioned and sales booked
Project milestone · Agrochemical & Fertilizers
Chambal Fert & Chemfollow · Vendor bids received and board decides on the fourth plant
Project milestone · Agrochemical & Fertilizers
Chembond Chemicalswait · Operating margin back to 15% in the second half
Chemicals · expected at least 15%
Chemplast Sanmaravoid · PVC spread at $150 a tonne or more from Q3 FY27
Chemicals
Chemplast Sanmaravoid · Back to an operating profit ('reasonable performance') from Q3 FY27
Chemicals · expected at least ₹0cr
Chemplast Sanmaravoid · Paste PVC debottlenecking commissioned
Project milestone · Chemicals
CIE Automotiveown · Working capital unwinding by December 2026
Auto Related
CIE Automotiveown · Second-half capex stepping up and the US casting order shipping from Q3
Auto Related
Clean Sciencewait · Water-treatment product launched in November 2026
Chemicals
Clean Sciencewait · PC2 commercial production starts
Project milestone · Chemicals
Clean Sciencewait · NOR-HALS production starts
Project milestone · Chemicals
CMS Info Systemsown · Algo multivendor ATM software goes live at ICICI Bank
Project milestone · Commercial Services
Cohance Lifesciencesavoid · Its recovery plan published by December 2026
Pharma CDMO
Concord Biotechfollow · Contract sales from the injectables plant begin
Project milestone · Pharma API
Cosmo Firstfollow · Remaining ~15% of film capacity largely sold
Project milestone · Packaging
Cosmo Firstfollow · Plastech capacity up 50%
Project milestone · Packaging
Craftsman Automationwait · DR Axion Sriperumbudur plant starts (December 2026)
Project milestone · Auto Related
Crompt.Greaves Cons.follow · Operating margin above 11% again in Q3 FY27, with fan share holding after the Q1 stock-outs
Consumer Durables · expected at least 11%
Crompt.Greaves Cons.follow · Rooftop-solar installations turning into revenue in Q2–Q3
Consumer Durables
Cyientwait · Two quarters of positive core engineering growth in constant currency (Q2 and Q3)
Software
DDev Plastiksown · Second-half volume approaching 60,000 tonnes a quarter
Chemicals
DEE Developmentfollow · A clean audit opinion by Q3 FY27, as promised
Industrials
DEE Developmentfollow · New fuel lets both the pellet and power plants run fully
Project milestone · Industrials
Deepak Fert & Petrowait · Gopalpur starts operations
Project milestone · Chemicals
Deepak Fert & Petrowait · Dahej nitric acid starts operations
Project milestone · Chemicals
Deepak Nitritewait · Phenolics EBIT margin at or above about 13% (its FY26 level) once war-time prices fade
Chemicals
Delhiverywait · Express margin recovering above Q1's 15.6% through the festive quarter
Logistics
Dharmaj Crop Guardfollow · Second-half sales growth toward the 18–20% guide
Agrochemical & Fertilizers · expected at least 18%
Dharmaj Crop Guardfollow · Herbicide unit starting on time in Q3 FY27
Agrochemical & Fertilizers
Dharmaj Crop Guardfollow · Herbicide unit commissioned
Project milestone · Agrochemical & Fertilizers
Digitide Solutionspass · Promised 2-point margin gain showing up in Q2–Q3 (9.9% in Q1)
Software · expected at least 12%
Dilip Buildconwait · Revenue stepping up 30–40% from Q3 FY27 as guided
Construction
Divgi Torqtransferpass · EV revenue reaches ₹10–12cr a quarter by Q3 FY27
Auto Related
Dr Agarwal's Health Carewait · Chennai flagship opening in October 2026
Hospitals
Dr Agarwal's Health Carewait · Chennai flagship opens
Project milestone · Hospitals
Dr Lal PathLabsfollow · Growth holding up as the CGHS rate boost fades in Q3–Q4 FY27
Healthcare Diagnostic
Dr Lal PathLabsfollow · List-price rise taken after H1 FY27 (none for three years)
Healthcare Diagnostic
E2E Networksfollow · Second lot of 1,024 B200 GPUs goes live and runs at high utilisation
Software
E2E Networksfollow · Second B200 lot goes live
Project milestone · Software
EIHfollow · Margins recovering in Q3–Q4 once renovations end (Q1 fell to 25%)
Hotels and Travels
Electronics Mart Indwait · Kolkata stores open by Diwali
Retail
Electronics Mart Indwait · Q2–Q3 gross margin settles near 15%
Retail
Electronics Mart Indwait · Five Kolkata stores open by Diwali
Project milestone · Retail
Elgi Equipmentsfollow · EBITDA margin above 16% as the June price rise lands (14.6% in Q1)
Pumps Comp & Eng
Ellen. Indl. Gaswait · First full quarter of East India onsite revenue
Project milestone · Chemicals
Emcure Pharmafollow · Net debt peaks near ₹1,450cr in Q2 and falls after
Pharma
Emmvee Photovoltaic Power Ltdfollow · 6 GW plant on time: modules from December 2026
Solar PV Cells EPC
Emmvee Photovoltaic Power Ltdfollow · Module line commissioned
Project milestone · Solar PV Cells EPC
EMS Limitedavoid · West Bengal (Kolkata ₹780cr) work at full pace in Q3
Utilities
Enviro Infra Engine.wait · First HAM plant commissioned
Project milestone · Utilities
Epack Durableavoid · Mass production of Hisense front-load washers (around October 2026)
Project milestone · Consumer Durables
EPack Prefab Techno.follow · Commercial production at Ghiloth (October–November 2026)
Project milestone · Construction
EPack Prefab Techno.follow · Gujarat plant starts production
Project milestone · Construction
Epigralown · ECH and CPVC capacity doubling running by December 2026
Chemicals
Epigralown · ECH and CPVC doubling running
Project milestone · Chemicals
EPLown · Europe's margin back towards the mid-teens by Q3 FY27 (4.8% at the EBIT level in Q1)
Packaging
Eris Lifescienceswait · The ₹625cr December 2026 bonds refinanced cleanly
Pharma
Ester Industriespass · Land acquisition completed (within two months of August)
Project milestone · Packaging
Exicom Tele-Sys.pass · Consolidated operating break-even by Q3 FY27, as promised for Q2–Q3
Electrical Equipment · expected at least ₹0cr
Exicom Tele-Sys.pass · Monthly AC-charger output up about 50%
Project milestone · Electrical Equipment
Exide Industrieswait · First lithium-cell revenue in Q3 FY27 with disclosed customer orders and narrowing lithium losses
Auto Related
Exide Industrieswait · Standalone lead-acid operating margin holds above 11% as the GST high base arrives
Auto Related
Exide Industrieswait · First cell revenue reported by Exide Energy Solutions
Auto Related
Fiem Industriesown · Operating margin back at about 14% in Q2–Q3 FY27 after the wage rise
Auto Related · expected at least 14%
Finolex Cableswait · Preform plant stable and lifting the fibre margin
Project milestone · Cables
Gabriel Indiapass · Operating margin back towards 10% as costs are recovered
Auto Related · expected at least 10%
Ganesh Benzoplastwait · First ~50,000 kL of new JNPT tanks commissioned by December 2026
Oil
Management changed this (2026-09-30): On 29 Sep 2026 the company agreed to sell its liquid storage and rail logistics businesses (including JNPT) for ₹1,154cr; if the sale closes, this checkpoint no longer applies to the company
Ganesh Benzoplastwait · First phase (~50,000 kL) commissioned by December 2026
Project milestone · Oil
Management changed this (2026-09-30): On 29 Sep 2026 the company agreed to sell its liquid storage and rail logistics businesses (including JNPT) for ₹1,154cr; if the sale closes, this checkpoint no longer applies to the company
Ganesh Consumer Prodwait · Snacks and sweets launched from Amta
Project milestone · Food Products
Ganesh Housingavoid · Million Minds Phase 2 (commercial) launched
Project milestone · Realty
Garware Hi-Techfollow · TPU line starting in Q3 FY27
Plastics
Garware Hi-Techfollow · TPU line commissioned
Project milestone · Plastics
Garware Hi-Techfollow · TPU film line commissioned and supplying the paint-protection line
Plastics
GE Powerpass · NCLT sanctions the Durgapur demerger to JSW Energy (ICRA expects Q3 FY27)
Electrical Equipment
GK Energywait · Formal PM-KUSUM 2.0 launch in Q3 FY27 (chairman: 'in Q3. Not before.')
Construction
GMM Pfaudlerfollow · Operating margin back above 12–13% in Q2–Q3 FY27 (Q1 10.1%)
Industrials · expected at least 12%
GNFCfollow · Power plant fully commercial with TDI savings visible
Project milestone · Chemicals
Go Fashion (India) (GoColors)pass · Two quarters of positive same-store growth, as guided
Retail
Godavari Powerfollow · 5.4-million-tonne ore-upgrading plant (₹325cr) commissioned in Q3 FY27
Mining & Metals Recycle
Godavari Powerfollow · Construction starts (October 2026)
Project milestone · Mining & Metals Recycle
Godavari Powerfollow · Beneficiation plant commissioned; mine ramp-up begins
Project milestone · Mining & Metals Recycle
Godrej Agrovetfollow · Specialty-fats refinery contributing to sales
Project milestone · Food Products
Gopal Snackspass · Operating margin reaching 8–9% in H2 FY27, as guided (7.4% in Q1)
Food Products · expected at least 8%
GPT Healthcare (Agilus)follow · Raipur breaks even at operating level on a monthly basis
Project milestone · Hospitals
GPT Infraprojectsfollow · Q2 and Q3 revenue on the path to about ₹1,700cr for FY27
Construction
GR Infraprojectswait · Orders towards the ₹20,000cr FY27 guide in Q2–Q3
Construction
Gravita Indiaown · Lead volume recovering once the Gulf scrap-export ban ends on 8 October 2026
Mining & Metals Recycle
Greenply Industrieswait · Two quarters (Q2–Q3) of ₹600cr+ plywood sales at a 10% margin
Consumer Durables
Greenply Industrieswait · Odisha plywood plant commissioned (December 2026)
Project milestone · Consumer Durables
GRPpass · Recovered carbon-black plant starts in October 2026
Rubber
GRPpass · Carbon black plant commissioned (October 2026)
Project milestone · Rubber
GSFCfollow · Converted Sikka line commissioned
Project milestone · Agrochemical & Fertilizers
Gufic Bioscienceswait · EU GMP certificate for Indore
Project milestone · Pharma
Gujarat Fluorochemicwait · LFP cathode final qualification
Project milestone · Chemicals
Gulf Oil Lubricantown · Chennai expansion commissioned (by December 2026)
Project milestone · Oil
Gulf Oil Lubricantown · New Tirex plant operational
Project milestone · Oil
H.G. Infra Engg.wait · About ₹300cr of remaining project loans released after commissioning
Project milestone · Construction
Happiest Mindswait · Competition-regulator and shareholder approvals for the ITC Infotech merger
Software
Happy Forgingswait · Heavy-parts line starting trials in Q3 FY27
Forging
Happy Forgingswait · Trials start on the heavy line
Project milestone · Forging
Happy Forgingswait · Order book of new business above ₹1,000cr of peak yearly revenue
Forging
Harsha Engineers Intown · Indian engineering margin back to about 18% by Q3 FY27
Bearings
HEGwait · Signed anode offtake contracts (promised for about 70% of capacity) replacing the non-binding MOUs
Elect and Refrac
HEGwait · US final anti-dumping duties (due about 7 December) not well above the preliminary 6.99%
Elect and Refrac
HEGwait · Electrode price rises holding in October–December bookings against rising needle-coke costs
Elect and Refrac
Himadri Specialityfollow · A signed, named LFP customer contract as the 2,000t LFP line starts in Q3 FY27
Chemicals
Himadri Specialityfollow · First 2,000-tonne LFP line commissioned
Project milestone · Chemicals
Hindustan Foodswait · Greek yogurt plant starts
Project milestone · Food Products
Hindware Home Innov.pass · Pipes margin above 5% for two quarters (Q2–Q3)
Consumer Durables
HLE Glascoatpass · Two quarters of double-digit operating margins (Q1 FY27 7%)
Industrials · expected at least 10%
HPL Electricpass · Operating margin back to 15% by Q3 FY27 (12% in Q1)
Industrials · expected at least 15%
Huhtamaki Indiawait · Fees paid to the Finnish parent not rising again in CY26 (₹105cr in CY25)
Packaging
IFB Industrieswait · Operating margin above 7% again in Q3 FY27
Consumer Durables · expected at least 7%
IG Petrochem.wait · Biogas plant commissioned
Project milestone · Chemicals
Indegenefollow · Revenue from the $10 million-plus outcome deal starting in Q3
Healthcare
Indegenefollow · Q3 margin landing on the path to 19–20% (Q1: 16.9%)
Healthcare
India Pesticideswait · Inventory back to about 170 days in Q3 (about 200 now)
Agrochemical & Fertilizers
India Pesticideswait · First European sales of the approved fungicide from November 2026
Agrochemical & Fertilizers
Indiamart Intermeshfollow · Two quarters of positive net paying-supplier additions (flat at about 2.18 lakh for a year)
Retail
Indigo Paintsfollow · Revenue growth of about 20% in Q3 FY27
Consumer Durables · expected at least 19%
Indigo Paintsfollow · Gross margin above 45% in Q2 and Q3 despite heavier trade schemes
Consumer Durables
Indigo Paintsfollow · Commercial output in time for the festive season
Project milestone · Consumer Durables
Indo Farmpass · New crane plant producing by end-November (after four delays)
Vehicles
Indo Farmpass · Commercial production starts at the new crane plant
Project milestone · Vehicles
Infibeam Avenues · Its share of the UPI fee from 15 October 2026
Platform Cos
InfoBeans Technologiesown · Promoter selling stops after the October window closes
Software
Insolation Energypass · First cell output in December 2026, per the Q1 deck
Solar PV Cells EPC
Insolation Energypass · First cell output
Project milestone · Solar PV Cells EPC
Intellect Design Arenafollow · Second quarter running of ₹900cr+ total income with company EBITDA margin back at 24%+ on a cost base near ₹700cr
Software
Interarch Buildingwait · Phase 2 complete, making it a full plant
Project milestone · Construction
Inventurus Knowledge Solutionsfollow · TruBridge's margin rising from 22–23% in the first quarters after the July close
Software
IOL Chem & Pharmafollow · Tablet plant shipping to Europe
Project milestone · Pharma API
Isgec Heavy Engg.follow · Plant at about 90% use
Project milestone · Industrials
IZMOavoid · izmo Microsystems (chip packaging) reaching about ₹12cr a quarter
Software
J Kumar Infraown · Q3 FY27 revenue above about ₹1,800cr
Construction · expected at least ₹1,800cr
Jash Engineeringfollow · Rodney Hunt back in profit by Q2–Q3 FY27
Industrials
Jash Engineeringfollow · Saudi land allotted
Project milestone · Industrials
Jeena Sikho Lifecareown · Manali hospital opens
Project milestone · Pharma Others
JG Chemicalswait · Dahej plant (Phase 1) commissioned in November 2026
Chemicals
JG Chemicalswait · Dahej Phase 1 commissioned
Project milestone · Chemicals
JG Chemicalswait · Naidupeta expansion commissioned
Project milestone · Chemicals
Jindal Drilling and Industriesfollow · Jindal Pioneer starts work under its new ONGC contract in October 2026
Oil
Jindal Drilling and Industriesfollow · Jindal Pioneer starts its new ONGC contract (October 2026)
Project milestone · Oil
JNKwait · A Dangote or fertiliser reformer award in Q2–Q3 FY27
Industrials
John Cockerillavoid · Group operating profit turns positive in H2 CY26 (Jul–Dec 2026)
Industrials
JTEKT Indiapass · Operating margin 8% or more again in Q3 FY27 (second of two quarters)
Auto Related · expected at least 8%
JTEKT Indiapass · CVJ lines at about 90% use after Maruti's electric MPV launch (October 2026)
Project milestone · Auto Related
Jubilant Ingreviawait · Volumes restored on the paused $300m agrochemical contract by Q3
Pharma CDMO
Jubilant Ingreviawait · Gajraula multipurpose plant starting by December 2026
Pharma CDMO
Jubilant Ingreviawait · Gajraula plant commissioned
Project milestone · Pharma CDMO
Jubilant Ingreviawait · Volumes restored on the paused agro contract
Project milestone · Pharma CDMO
Jubilant Pharmovawait · Operating margin at least 17% in Q3 FY27 (first H2 quarter)
Pharma CDMO · expected at least 17%
Juniper Hotelswait · Westin Bengaluru opening in October 2026 (slipped three times)
Hotels and Travels
Juniper Hotelswait · Westin Bengaluru opens (October 2026)
Project milestone · Hotels and Travels
Jupiter Life Line Hospitalswait · Mira Road digging started by the end of 2026
Hospitals
Jupiter Life Line Hospitalswait · Excavation starts at Mira Road
Project milestone · Hospitals
Jupiter Wagonspass · Stone India supplies all Jupiter's own wagons and turns profitable
Project milestone · Industrial - Railway
Jyothy Labsfollow · Gross margin rising in Q3 FY27 as crude-linked costs ease
Consumer Durables
Jyoti CNC Auto.wait · Foundry and other backward-integration lines at the new site running
Project milestone · Industrial Machinery
Kajaria Ceramicsfollow · Double-digit tile volume growth in Q3 FY27, as promised
Consumer Durables
Kanpur Plastipackwait · Non-woven sales starting in Q3 FY27
Packaging
Kanpur Plastipackwait · Non-woven plant commissioned and first revenue
Project milestone · Packaging
Kaveri Seed Companywait · Tax tribunal hearing on 15 October 2026 upholds the farm-income exemption
Food Products
Kaynes Technologywait · Metering receivables (₹1,311cr) falling in Q2–Q3, or the unit sold
EMS & Electronics
Kaynes Technologywait · First OSAT (chip-packaging) and circuit-board revenue in Q3 FY27
EMS & Electronics
Kaynes Technologywait · First chip-packaging revenue
Project milestone · EMS & Electronics
Kaynes Technologywait · Commercial production and first board revenue
Project milestone · EMS & Electronics
Kaynes Technologywait · Both new plants billing customers in Q3 FY27 as promised
EMS & Electronics
KEC Internationalwait · E-beam plant commissioned
Project milestone · Construction - Power
Kilburn Engg.wait · Saravali and Pune expansions complete
Project milestone · Industrials
Kirloskar Brothersfollow · SPP UK service work returns in Q2–Q3 and the unit gets back to profit
Pumps Comp & Eng
Kirloskar Oilwait · Standalone operating margin back above 13% (its FY26 level)
Pumps Comp & Eng
KPIT Technologiesown · The two troubled European clients stabilising in Q3
Software
KRBLwait · Gangavati facility operational
Project milestone · Food Products
Krishana Phoschempass · New NPK-DAP line utilisation above 70% by Q3 (43% in Q1)
Agrochemical & Fertilizers
Krishna Defence & Allied Industriesown · Order book passing ₹150cr by December as the ₹289cr tender pipeline converts
Aerospace defence · expected at least ₹150cr
Krishna Defence & Allied Industriesown · Bulb-bar orders from the next-generation corvette programme
Aerospace defence
Krishna Inst.Mediwait · Thrissur hospital opens
Project milestone · Hospitals
Krosswait · High-pressure moulding line running
Project milestone · Auto Related
Krsnaa Diagnosticswait · Remaining MRI centres live
Project milestone · Healthcare Diagnostic
KSBwait · NPCIL's 500-hour coolant-pump test restarts and is passed
Pumps Comp & Eng
KSBwait · Double-digit sales growth in H2 CY26 (Jul–Dec 2026), after 2–3% in H1
Pumps Comp & Eng
KSBwait · Receivable days fall from 118 by the CY26 year-end
Pumps Comp & Eng
Laxmi Organicpass · Dahej customer qualification in Q3 FY27
Chemicals
Laxmi Organicpass · Phase 2 mechanical completion
Project milestone · Chemicals
Laxmi Organicpass · Project Vaayu mechanical completion
Project milestone · Chemicals
Le Travenues Technowait · Flight volumes and airline seats returning from the festive season (flights +4% in Q1)
Travel Services
Lemon Tree Hotelsown · Room rates up about 10% in the winter quarter, as planned
Hotels and Travels
Lumax Auto Techfollow · Manesar mechatronics plant commissioned
Project milestone · Auto Related
M & B Engineer.wait · Sanand expansion commissioned (October 2026)
Project milestone · Construction
Macpower CNCfollow · Operating margin above 17–18% by Q3 FY27; above 18% with the new site on schedule would make it a buy
Industrial Machinery · expected at least 17%
Madhya Bharat Agro Productspass · Dhule DAP/NPK plant starting by October 2026
Agrochemical & Fertilizers
Madhya Bharat Agro Productspass · Dhule DAP/NPK and phosphoric acid plants commissioned
Project milestone · Agrochemical & Fertilizers
Manba Financepass · Loans reaching ₹2,000cr by December 2026
Finance
Manorama Industrieswait · Rest of the debottlenecked capacity running
Project milestone · Food Products
Mastekfollow · North America reaching $28–30M a quarter by H2
Software
Minda Corpwait · Turntide JV starts production (October–November 2026)
Project milestone · Auto Related
Mishra Dhatu Nigam (MIDHANI)pass · Margin back to 20–21% from Q3 FY27 (15% in Q1)
Aerospace defence · expected at least 20%
Motherson Sumi Wirinwait · New plants' margins reach company level (pushed out one or two quarters in Aug 2026)
Project milestone · Auto Related
MTAR Technologiesfollow · Phase 2 hot-box capacity on time in Q3 FY27
Aerospace defence
MTAR Technologiesfollow · Hot-box Phase 2 commissioned
Project milestone · Aerospace defence
MV Electrosystemswait · About 70 sets delivered by December and a first profitable quarter
Industrial - Railway · expected at least ₹0cr
MV Electrosystemswait · Test rigs installed
Project milestone · Industrial - Railway
Navin Fluorine Intlfollow · 15,000 tonnes of extra R-32 capacity commissioned in Q3 FY27
Chemicals
Navin Fluorine Intlfollow · Extra 15,000t R-32 capacity commissioned
Project milestone · Chemicals
Navin Fluorine Intlfollow · Dahej MPP debottlenecking completed
Project milestone · Chemicals
NBCCfollow · Q3 FY27 revenue above ₹4,000cr
Construction · expected at least ₹4,000cr
Netweb Technologieswait · New large orders won as the ₹1,600cr strategic order runs down
Software
Network People Servicespass · Two consecutive quarters of ₹75cr+ revenue with positive operating cash flow
Software
Newgen Softwareown · Debtor days back below 130 by Q3 (145 in Q1, above CRISIL's 140-day trigger)
Software
Newgen Softwareown · Implementation revenue catching up in Q2–Q3 after a 23% Q1 fall, as promised
Software
NGL Fine-Chemwait · Commercial production from Phase II (H2 FY27)
Project milestone · Pharma API
Ola Electricavoid · Monthly registrations rising toward the 20,000–25,000 break-even after the dealer switch (about 13,000 now)
Vehicles
Onward Technologiesfollow · Operating margin back above 13% in Q2–Q3 as the new power-equipment design centre bills
Software · expected at least 13%
Orchid Pharmaavoid · Cefiderocol plant ready
Project milestone · Pharma
Orient Bellwait · Operating margin above 7% in Q3 FY27
Consumer Durables · expected at least 7%
Orient Bellwait · Expansion decision by about December 2026
Consumer Durables
Orient Bellwait · Decision on the larger expansion (November–December 2026)
Project milestone · Consumer Durables
Orient Electricwait · Operating margin above 8% outside the summer (Q3 FY27)
Consumer Durables · expected at least 8%
Oswal Pumpspass · Receivables below 200 days in Q3 (229 days now)
Pumps Comp & Eng
Oswal Pumpspass · Remaining 0.5 GW module capacity completed
Project milestone · Pumps Comp & Eng
Oswal Pumpspass · Pump and motor expansion and automation completed
Project milestone · Pumps Comp & Eng
Paradeep Phosphateswait · Phosphoric acid capacity reaching 0.6 million tonnes by December 2026
Agrochemical & Fertilizers
Paradeep Phosphateswait · Phosphoric acid capacity reaches 0.6 million tonnes
Project milestone · Agrochemical & Fertilizers
Paradeep Phosphateswait · Granulation debottlenecking complete
Project milestone · Agrochemical & Fertilizers
Pennar Industrieswait · Car-body unit revenue doubles on scheduled orders
Project milestone · Construction
PG Electroplastpass · Compressor plant comes online
Project milestone · EMS & Electronics
PG Electroplastpass · Side-by-side refrigerator production starts in India
Project milestone · EMS & Electronics
Pine Labswait · A solid share of the new UPI fee for acquirers
Platform Cos
Pondy Oxides & Chem.wait · Copper cathode plant starts trial production in December 2026
Mining & Metals Recycle
Pondy Oxides & Chem.wait · Phase 1 (18,000 tonnes) commissioned by December 2026
Project milestone · Mining & Metals Recycle
Power Mech Proj.own · Tasra coal-washing plant commissioned by about December 2026
Construction
Power Mech Proj.own · Tasra washing plant commissioned (about November–December)
Project milestone · Construction
Powericafollow · Genset margin back to 9–10% from Q3 FY27 (5.6% in Q1)
Pumps Comp & Eng
Premier Explosivespass · Apollo Micro Systems' ₹698 open offer closing in Q3 FY27
Chemicals
Premier Explosivespass · RDX/HMX plant starts production
Project milestone · Chemicals
Pricolfollow · Operating margin back towards 12.5% by Q3 FY27
Auto Related · expected at least 12.5%
Prince Pipeswait · Bathware at break-even in the December quarter
Plastics
Prince Pipeswait · Bathware reaches break-even (about ₹25cr revenue a quarter)
Project milestone · Plastics
Privi Speciality Chewait · Privi Fine Sciences merger approved at a fair ratio in the 27 October vote
Chemicals
Privi Speciality Chewait · Shareholder vote on the merger (27 Oct)
Project milestone · Chemicals
Protean eGovwait · Filed operating margin back above 10% by Q3 as Aadhaar centres fill up (4.9% in Q1)
Software · expected at least 10%
Protean eGovwait · All 190 centres open (promised for September–October 2026)
Project milestone · Software
Protean eGovwait · Margins stabilise (management: from Q2 or Q3)
Project milestone · Software
PSP Projectspass · Operating margin at 7–8% from H2 (Q1: 6.42%)
Construction · expected at least 7%
Punjab Chem. & Corpwait · Second-half sales growth toward the 15–20% guide
Agrochemical & Fertilizers · expected at least 15%
Quality Power Elwait · Turkey battery-converter plant starts in Q3 FY27
Electrical Transformers
Quality Power Elwait · Magnet wire plant commissioned
Project milestone · Electrical Transformers
Quality Power Elwait · Nigde converter plant begins operations
Project milestone · Electrical Transformers
RACL Geartechwait · BMW supplies start after the 24 October sign-off
Auto Related
RACL Geartechwait · Equipment installed and commissioned (Oct–Dec 2026)
Project milestone · Auto Related
RACL Geartechwait · BMW supplies start after the 24 October sign-off
Project milestone · Auto Related
Rainbow Children's Medicarefollow · Guntur hospital opens ('in a couple of months')
Project milestone · Hospitals
Rainbow Children's Medicarefollow · Indore hospital opens
Project milestone · Hospitals
Rajratan Globalfollow · Steel-cord line selling from Q3 FY27
Auto Related
Rajratan Globalfollow · First steel-cord sales
Project milestone · Auto Related
Ramkrishna Forgingspass · Rail-wheel bulk supply starts by December 2026
Auto Related
Ramkrishna Forgingspass · Cold forging above 70% use
Project milestone · Auto Related
Redingtonwait · Revenue growth holds after the festive season despite PC price rises (IDC expects a H2 slowdown)
Commercial Services
Relaxo Footwearspass · Pairs sold growing in Q3 FY27
Consumer Durables
Remsons Industrieswait · Operating margin back above 11% after the Q2 flood
Auto Related · expected at least 11%
RHI Magnesitafollow · Adjusted margin not slipping below 12% as surcharges fade
Elect and Refrac
Rico Auto Industriespass · Operating margin back above 9% by Q3 FY27
Auto Related · expected at least 9%
RIR Power Electravoid · First silicon-carbide epi-wafer revenue billed in Q3 FY27
Electrical Equipment
RIR Power Electravoid · First epi-wafer revenue billed
Project milestone · Electrical Equipment
RIR Power Electravoid · Phase 2 funding and plan updated
Project milestone · Electrical Equipment
Rossari Biotechfollow · New Dahej ethoxylation capacity meaningfully used
Project milestone · Chemicals
Route Mobilewait · Gross margin back above 22% in Q2–Q3 (20.9% in Q1)
Software
Rushil Decorpass · MDF margin back above 10% (guided 10–12% in one or two more quarters)
Consumer Durables
Sai Parenteralspass · Operating margin above the 17% guide in H2 FY27
Pharma · expected at least 17%
Sai Silks (Kalamandir)wait · Same-store growth above +3% in the November–December wedding season (−7.5% in Q1)
Retail
Sakar Healthcarewait · Quarterly revenue reaching ₹85–90cr by Q3 FY27
Pharma · expected at least ₹85cr
Saksoftwait · Quarterly revenue growing off the flat ₹249cr run-rate in Q2–Q3
Software · expected at least ₹250cr
Saksoftwait · The $28M pipeline converting
Software
Samhi Hotelsown · Margin back toward 38% as the GST cost laps from Q3 (Q1: 32.9%)
Hotels and Travels
Sandhar Technologieswait · Sanaswadi plant profitable (slipped from Q2 to Q3 FY27)
Project milestone · Auto Related
Sansera Engineeringfollow · New ADS hangar commissioned
Project milestone · Aerospace defence
Sansera Engineeringfollow · NADCAP approval for surface treatment
Project milestone · Aerospace defence
Sansera Engineeringfollow · New hangar commissioned and surface-treatment plant NADCAP-approved
Aerospace defence
Sansera Engineeringfollow · ADS backlog above ₹5,750cr after the order conversions management expects in Q2 and Q3
Aerospace defence
Sastasundar Venturesavoid · RetailerShakti turning EBITDA-positive in Q3 FY27
Retail
Schneider Ele. Infraavoid · Operating margin back above 12% in Q2–Q3 FY27
Electrical Transformers · expected at least 12%
Sedemac Mechatronicswait · MF4 motor plant starts shipments
Project milestone · Auto Related
Sequent Scientificfollow · Bioforlife deal closes
Project milestone · Pharma Others
SH Kelkar & Cowait · Net debt (₹852cr) falling about ₹25cr a quarter from Q3 FY27
Chemicals
SH Kelkar & Cowait · Mahad plant operational
Project milestone · Chemicals
Sh. Pushkar Chem.follow · Unit 6 running commercially by Q3 FY27
Chemicals
Sh. Pushkar Chem.follow · Unit 6 running commercially
Project milestone · Chemicals
Shadowfax Tech.follow · New capacity live for the festive peak
Project milestone · Logistics
Sheela Foampass · Indian mattress volume back near 10% in the festive quarters
Consumer Durables
Sheela Foampass · Kurlon synergy machines running
Project milestone · Consumer Durables
Shree Ganesh Remed.avoid · Quarterly revenue above ₹30cr for a second quarter running
Pharma API · expected at least ₹30cr
Shriram Propertieswait · Approvals and launches for Manjari, Bannerghatta and Yelahanka in Q3
Realty
Sirca Paintspass · Revenue growth above 20% in Q3 FY27
Consumer Durables · expected at least 20%
SKF Indiawait · Pre-tax margin above 13% again in Q3 (second clean quarter)
Bearings
Skipperfollow · Significant use of the new capacity
Project milestone · Construction - Power
Sonata Softwarewait · International EBITDA margin back above 18% for two quarters (15.4% in Q1)
Software
SPML Infrapass · NTPC approving the battery designs by December 2026
Construction
SPML Infrapass · NTPC approves the battery designs
Project milestone · Construction
Stallion India Fluorpass · 10,000-tonne R-32 plant starts by end-December 2026
Chemicals
Stallion India Fluorpass · R-32 plant starts production
Project milestone · Chemicals
Stallion India Fluorpass · Mambattu terminal starts operating
Project milestone · Chemicals
Standard Glassavoid · GScale factory opens in November with named data-centre orders
Industrials
Standard Glassavoid · GScale factory starts operations
Project milestone · Industrials
Steel Strips Wheelswait · Trial production at Bhuj starts (October 2026)
Project milestone · Auto Related
Steel Strips Wheelswait · New steel-wheel line starts (by December 2026)
Project milestone · Auto Related
Steelcastown · Both power plants commissioned (by 31 Dec 2026)
Project milestone · Forging
Sterling and Wilsonpass · H2 revenue near ₹2,600cr a quarter
Construction · expected at least ₹2,600cr
Sterling Toolswait · Commercial supplies start
Project milestone · Auto Related
Stove Kraftpass · Second IKEA line starts
Project milestone · Consumer Durables
Stove Kraftpass · Tri-ply line running
Project milestone · Consumer Durables
Strides Pharmawait · DEA's December decision on the larger controlled-substance quota
Pharma
Strides Pharmawait · US sales rising from about $68m a quarter in the second half
Pharma
Studds Accessoriesfollow · New plant (Facility V), Decathlon supplies and the Italian unit all start in October 2026
Auto Related
Studds Accessoriesfollow · Phase 1 of Facility V starts production (October 2026)
Project milestone · Auto Related
Stylam Industriefollow · First full quarter of new-plant sales at a 20% margin
Consumer Durables · expected at least 20%
Stylam Industriefollow · First full quarter of sales from the new plant
Project milestone · Consumer Durables
Styrenix Performancefollow · Second-half operating margin back near 10–12% without volume loss
Chemicals · expected 10%–12%
Subrospass · Kharkhoda plant starting production in Q3 FY27
Industrials
Subrospass · Kharkhoda starts production
Project milestone · Industrials
Sudeep Pharmawait · A binding battery supply contract with price terms, later in 2026
Pharma Others
Sudeep Pharmawait · Operating margin back to 37–38% in H2 as price increases take effect
Pharma Others · expected at least 37%
Sudeep Pharmawait · Two binding offtake agreements signed
Project milestone · Pharma Others
Sudeep Pharmawait · Supplies start from the new plant
Project milestone · Pharma Others
Sumitomo Chemical Indiawait · Rabi-season sales growth in Q3
Agrochemical & Fertilizers · expected at least 5%
Sumitomo Chemical Indiawait · Bhavnagar capacity doubled
Project milestone · Agrochemical & Fertilizers
Sundram Fastenerswait · Revenue growth holds above 12% against the high second-half base
Auto Related · expected at least 12%
Suprajit Engineeringwait · Technology-centre building completed
Project milestone · Auto Related
Supriya Lifesciencewait · Operating margin above 33% again in Q3
Pharma API · expected at least 33%
Supriya Lifesciencewait · A clean EU audit at Ambernath in November 2026
Pharma API
Supriya Lifesciencewait · EU audit of the Ambernath plant (November)
Project milestone · Pharma API
Suraj Estatepass · Business Bay Phase 2 launches in Q3
Realty
Swiggywait · Company-level cash break-even within two quarters of July 2026, as targeted
Platform Cos
Talbros Auto Compontown · Forging growth once the October order starts
Auto Related
Talbros Auto Compontown · Forging expansion finished and commercial supplies start (October 2026)
Project milestone · Auto Related
Talbros Auto Compontown · Land search for the Gujarat plant under way
Project milestone · Auto Related
Tanfac Industrieswait · 20,000-tonne R-32 plant fires in late November 2026
Chemicals
Tanfac Industrieswait · R-32 plant commissioned
Project milestone · Chemicals
Tarsons Productspass · Cell-culture lines at Panchla running by Q2–Q3 FY27, with first orders
Health Products
Tarsons Productspass · First revenue from the remaining new lines
Project milestone · Health Products
TBO Tekwait · Classic Vacations moved onto TBO's platform by end-2026
Platform Cos
Thomas Cook Indiawait · DEI and Desert Adventures (Middle East) back to profit in Q2–Q3 (DEI lost ₹15.2cr in Q1)
Travel Services
Thomas Cook Indiawait · Travel segment margin back to 4% (2.4% in Q1; works to 4–5%)
Travel Services
Thomas Cook Indiawait · Middle East business back to 50–60% of normal by year-end (30–35% in July)
Travel Services
TILpass · Two profitable standalone quarters in a row (lost ₹5.45cr in Q1)
Vehicles
Timken Indiawait · Jamshedpur rail line producing by December 2026
Bearings
Timken Indiawait · Cylindrical roller line ramps up
Project milestone · Bearings
Timken Indiawait · Jamshedpur rail line starts production
Project milestone · Bearings
Tinna Rubberfollow · MRP expansion commissioned (total 20,000 tonnes)
Project milestone · Rubber
Tinna Rubberfollow · Crumb rubber production starts in South Africa
Project milestone · Rubber
Transformers & Rectwait · Changodar work done and revenue growth picks up
Project milestone · Electrical Transformers
Transformers & Rectwait · Pressboard plant commissioned
Project milestone · Electrical Transformers
TruAlt Bioenergywait · Three Sumitomo biogas plants running
Project milestone · Oil
TTK Prestigefollow · Festive-quarter revenue growth staying in double digits in Q3 FY27
Consumer Durables · expected at least 10%
TVS Electronicsavoid · Operating margin above 5% again in Q3 (second quarter)
Hardware · expected at least 5%
Unicomm. eSolutionswait · Shipway reaching adjusted-EBITDA breakeven in Q3 FY27, as guided
Software
Uniparts Indiaown · First deliveries from the Mexico warehouse
Project milestone · Auto Related
Updater Serviceswait · Two clean quarters (no further write-offs or audit issues) in Q2 and Q3 FY27
Commercial Services
V-Guard Industrifollow · Operating margin still near 10% in Q3 FY27
Consumer Durables · expected at least 9.5%
V-Mart Retailfollow · Strong Q3 festive same-store growth (guide mid-to-high single digit)
Retail
V2 Retailown · Same-store growth back to 8–10% after the 4–5% price rises from Q3 (7.5% last)
Retail
Va Tech Wabagfollow · Underlying (filed) operating margin back above 11% by Q3, without currency gains (about 9% in Q1)
Utilities · expected at least 11%
Va Tech Wabagfollow · Kuwait plant work starts and the 400 MLD Perur plant moves into commissioning
Utilities
Vasa Denticitypass · Second quarter of rising gross margin, with positive cash
Health Products
Vasa Denticitypass · Own-brand stock-outs below 5% by December (12.9% in Q1)
Health Products
Vedant Fashions (Manyavar)wait · Same-store growth above 7% in the November–December wedding season (3.8% in Q1)
Retail
Ventive Hospitalitywait · Maldives margin recovering in the October–March season (operating profit −32% in Q1)
Hotels and Travels
Venus Pipes & Tubeswait · Spool plant starting by end-Q3 FY27 and the ₹185cr letter of intent turning into firm orders
Iron and Steel
Venus Pipes & Tubeswait · Spool plant starts
Project milestone · Iron and Steel
Viceroy Hotelswait · Convention centre back by December 2026
Hotels and Travels
Viceroy Hotelswait · Phase 2 done and convention centre reopens (about December 2026)
Project milestone · Hotels and Travels
Vimta Labsfollow · Revenue growth of 15% or more again in Q3 (second quarter)
Healthcare · expected at least 15%
Virtuoso Optoelectroavoid · Phase 1 (8 lakh CPH) in commercial production
Project milestone · EMS & Electronics
Virtuoso Optoelectroavoid · 2.5 lakh-unit freezer capacity live
Project milestone · EMS & Electronics
Vishnu Chemicalsfollow · First captive chrome ore from the South African mine reaching India in Q3 FY27
Chemicals
Vishnu Chemicalsfollow · First captive ore reaches the Indian plants
Project milestone · Chemicals
Vishnu Chemicalsfollow · Chromium capacity at 92,000 tonnes
Project milestone · Chemicals
Voltaswait · Cooling (unitary) segment margin above 6% in Q3 FY27
Consumer Durables
VST Tillers Tractorswait · Tiller sales growing again through the Rabi season (fell about 13% in July–August)
Vehicles
Welspun Enterpfollow · Pune–Shirur appointed (start) date in Q3 FY27
Construction
Welspun Enterpfollow · Start (appointed) date declared
Project milestone · Construction
WeWork Indiawait · About 20,000 new desks open
Project milestone · Commercial Services
Windlas Biotechown · Adjusted margin holding at 13–14% as Plant 6 depreciation starts
Pharma CDMO
Wockhardtwait · EU approval of Zaynich by end-2026
Pharma
WPILwait · State water-scheme collections (₹300–350cr) arrive in Q2–Q3 FY27
Industrials
Xtranet Technologiespass · XtraTrust data-centre expansion done
Project milestone · Software
Yasho Industrieswait · Equipment arrives
Project milestone · Chemicals
Yatra Onlinepass · Corporate card deal launched and receivable days falling from about 194
Travel Services
Zaggle Prepaidwait · Program-fee growth back above 20% as the Dice contracts transfer (10% now)
Software
Zen Technologieswait · ₹700–800cr of simulator orders and a large anti-drone order by Q3
Aerospace defence
ZF Comm Vehic Contrwait · Operating margin back to 16% as aluminium costs are recovered from truck makers
Auto Related · expected at least 16%
Q4 FY27
1303 pendingOla Electricavoid · Cash burn within ₹300–500cr with no further covenant breach or equity raise
Vehicles · actual Board approved a rights issue of up to ₹1,000cr on 28 Sep 2026 (NSE filing) · judged in review · Stays avoid
Pending (1303)
20 Micronsown · Quarterly revenue above ₹250cr in H2 FY27 (Q4)
Mining & Metals Recycle · expected at least ₹250cr
20 Micronsown · FY27 revenue crosses ₹1,000cr, management's only stated hope
Mining & Metals Recycle
3B Blackbio Diagnosticswait · Coris turning positive after the December sleeping-sickness order
Healthcare
3B Blackbio Diagnosticswait · FY27 revenue growth of 15–20% excluding Coris (guidance; Q1 +11.8%)
Healthcare
Aartech Solonicsavoid · Operating cash turning positive
Aerospace defence
Aartech Solonicsavoid · Narmadapuram plant starts operations
Project milestone · Aerospace defence
Aarti Industriespass · Net debt falling below ₹4,000cr in FY27
Chemicals
Aarti Industriespass · Remaining Zone IV chemistry blocks commissioned
Project milestone · Chemicals
Aarti Industriespass · Recycling plant commissioned
Project milestone · Chemicals
Aarti Pharmalabswait · Contract revenue of ₹350cr-plus over the last three quarters (40–50% growth for the year, H2-heavy)
Pharma CDMO
Accent Microcellfollow · Unit III Phase 2 running by March 2027
Pharma Others
Accent Microcellfollow · Unit III Phase 2 starts
Project milestone · Pharma Others
Action Const.Eq.follow · Defence sales 10–15% above ₹200cr in FY27
Vehicles
Action Const.Eq.follow · Plant 9 functional
Project milestone · Vehicles
Action Const.Eq.follow · Land takeover completed
Project milestone · Vehicles
Acutaas Chemicalsfollow · FY27 revenue up 25%, as guided, with H2 carrying 60% of the year
Pharma API · expected at least 25%
Acutaas Chemicalsfollow · FY27 margin similar to FY26's 35.9%, as guided
Pharma API
ADF Foodsfollow · Margin back above 17% without one-offs in H2 FY27, once freight is passed on
Food Products
ADF Foodsfollow · FY27 revenue 'upwards of ₹900cr', as guided (trimmed from ₹925–1,000cr)
Food Products
ADF Foodsfollow · Surat plant sales of ₹40–50cr in FY27
Food Products
ADF Foodsfollow · ₹40–50cr of Surat sales in FY27
Project milestone · Food Products
Aditya Birla Fashion & Retailpass · Losses narrow in H2 FY27
Retail
Aditya Birla Fashion & Retailpass · TCNS breaks even by the end of FY27
Retail
Aditya Birla Fashion & Retailpass · No new equity raise in FY27
Retail
Aditya Birla Fashion & Retailpass · 25–30 new Tasva stores opened in FY27
Project milestone · Retail
Aditya Birla Lifestyfollow · Net debt before leases falls towards ₹500cr
Retail
Aditya Birla Lifestyfollow · More than 300 new stores opened in FY27
Project milestone · Retail
Aditya Infotechwait · FY27 revenue of ₹6,000–6,500cr (guidance)
Industrials
Aditya Infotechwait · Noida Sector 68 facility operational
Project milestone · Industrials
Aditya Infotechwait · Housing plant phase 2 operational
Project milestone · Industrials
Aditya Infotechwait · Cable plant starts commercial production
Project milestone · Industrials
Aditya Visionfollow · FY27 operating margin of 8–10%, as guided
Retail · expected at least 8%
Aditya Visionfollow · 30+ store openings across four states without losses in the new states
Retail
Aditya Visionfollow · More than 30 new stores opened in FY27
Project milestone · Retail
Ador Weldingown · FY27 growth of at least 6–8% (guidance), with volume growth above 8%
Industrials · expected at least 6%
Advait Energyavoid · FY27 revenue growth of 40%-plus as guided
Cables · expected at least 40%
Advait Energyavoid · Dholera phase 1 and 100 MW electrolyser line operational
Project milestone · Cables
Advanced Enzymefollow · No write-down of the ₹321cr US goodwill
Pharma Others
Aegis Logisticsfollow · LPG distribution margin holds at ₹7,000+ a tonne in H2 FY27 (guidance)
Logistics
Aegis Logisticsfollow · Distribution volume above 1 million tonnes in FY27 (0.75 million in FY26)
Logistics
Aegis Logisticsfollow · LPG distribution above 1 million tonnes for FY27
Project milestone · Logistics
Aegis Vopak Terminalswait · Throughput up at least 25% in FY27 (cut from 30–40%)
Oil
Aegis Vopak Terminalswait · Liquid capacity raised from 1.7 to 2.2 million cbm by March 2027
Oil
Aegis Vopak Terminalswait · Liquid capacity reaches about 2.2 million cbm
Project milestone · Oil
Aequswait · Consumer arm at EBITDA breakeven by Q4 FY27, with utilisation rising from 22% to 40–50%
Aerospace defence
Aequswait · Consolidated operating cash turning positive
Aerospace defence
Aequswait · FY27 revenue growth of 45–50% as guided
Aerospace defence · expected at least 45%
Aequswait · Consumer utilisation reaches 40–50%
Project milestone · Aerospace defence
Aequswait · Consumer segment at EBITDA break-even
Project milestone · Aerospace defence
Aeroflex Industrieswait · FY27 revenue growth of about 35% (guidance)
Iron and Steel · expected at least 35%
Aeroflex Industrieswait · Hose expansion and annealing furnace complete
Project milestone · Iron and Steel
Aether Industriespass · FY27 operating margin within the 29–30% guide
Pharma CDMO · expected at least 29%
Afcons Infrawait · Net debt of ₹2,700–2,800cr by March 2027 as guided
Construction
Afcons Infrawait · FY27 order inflow of at least ₹30,000cr
Construction
Affle 3ifollow · Gross margin turning up in H2 FY27
Software
Affle 3ifollow · The larger acquisition completed by early 2027, at a sound margin; Bobble AI stake dealt with
Software
Affle 3ifollow · Larger acquisition closed
Project milestone · Software
AGI Greenpacwait · Gwalior furnace starting by March 2027
Packaging
AGI Greenpacwait · FY27 volume up 8–9%, per January guidance
Packaging
AGI Greenpacwait · Gwalior furnace commissioned (March 2027)
Project milestone · Packaging
Ahluwalia Contr.follow · FY27 revenue growth of 12–15% (cut from 15–20%)
Construction · expected at least 12%
Ahluwalia Contr.follow · Central Vista billing reaching about ₹700cr in FY27
Construction
Aimtronwait · FY27 revenue of ₹450–550cr, as guided
EMS & Electronics
Aimtronwait · Mechatronics facility ready
Project milestone · EMS & Electronics
Airfloa Rail Techno.avoid · FY27 revenue of about ₹500cr at 12–13% PAT margin (cut guidance)
Industrials
Airfloa Rail Techno.avoid · New 14-acre plant in place
Project milestone · Industrials
Ajanta Pharmawait · FY27 revenue growth in the high teens, as guided
Pharma · expected at least 17%
Ajanta Pharmawait · FY27 operating margin 27% ±1 before currency, as guided
Pharma · expected at least 26%
Ajax Engineeringwait · Second-half demand recovering in Maharashtra and Madhya Pradesh; mixer volumes growing again (core volume −11% in Q1)
Vehicles
Ajax Engineeringwait · Exports growing about 30% a year, as raised ambition says
Vehicles
Ajmera Realtywait · H2 launches (₹6,508cr planned, 95% in H2) go ahead
Realty
Akums Drugsfollow · Zambia supplies ($25m) starting in Q3–Q4
Pharma CDMO
Akums Drugsfollow · API unit reaching monthly break-even by March 2027
Pharma CDMO
Akums Drugsfollow · New Baddi tablet plant live
Project milestone · Pharma CDMO
Akzo Nobelwait · FY27 operating margin of 13–15%, as guided
Consumer Durables · expected at least 13%
Alembic Pharmawait · Pivya breaking even by Q4 FY27
Pharma
Alembic Pharmawait · FY27 revenue growth about mid-teens (raised guide)
Pharma · expected at least 14%
Alicon Castalloywait · New Shikrapur plant starts by March 2027
Auto Related
Alicon Castalloywait · New plant starts production (by March 2027)
Project milestone · Auto Related
Alivus Life Sciencesown · FY27 revenue up 10–12%, the first guidance it has given (second-half weighted)
Pharma API · expected at least 10%
Alivus Life Sciencesown · Glenmark orders in H2 FY27 leave the year flat, not a real decline (−52.6% in Q1)
Pharma API
Alivus Life Sciencesown · Solapur Phase 1.1 operating
Project milestone · Pharma API
Alkyl Amineswait · FY27 volume up 5–10%
Chemicals
All Time Plasticwait · Plant use above 75% in H2 FY27
Consumer Durables
All Time Plasticwait · FY27 revenue up 15–20%, as guided
Consumer Durables · expected at least 15%
All Time Plasticwait · 14 new machines (+1,500 tonnes) running
Project milestone · Consumer Durables
All Time Plasticwait · First bamboo revenue
Project milestone · Consumer Durables
Alpex Solarwait · About ₹1,700cr of revenue in H2 FY27 (Q3 + Q4)
Solar PV Cells EPC
Alpex Solarwait · Operating cash flow turns positive in FY27 after −₹116cr in FY26
Solar PV Cells EPC
Alpex Solarwait · Module capacity at 3.6 GW
Project milestone · Solar PV Cells EPC
Amagi Media Labspass · Stock-option cost falling below 5% of revenue
Software
Amara Raja Energyfollow · New-energy losses stay below about ₹200cr for FY27
Auto Related
Amara Raja Energyfollow · Storage plant starts production (end-2026, by Q4 FY27 at the latest)
Project milestone · Auto Related
Amara Raja Energyfollow · Storage (BESS) plant starts production by March 2027, with first named customers or orders
Auto Related
Amara Raja Energyfollow · New-energy revenue at least ₹1,100cr in FY27 (₹809cr in FY26)
Auto Related
Amber Enterprisesavoid · Net debt down to ₹700–800cr by March 2027, as guided (₹1,225cr in June)
EMS & Electronics
Amber Enterprisesavoid · A clean (unqualified) FY27 audit opinion
EMS & Electronics
Amber Enterprisesavoid · Electronics revenue up 40% in FY27, as guided
EMS & Electronics
Amber Enterprisesavoid · Trial phone production starts
Project milestone · EMS & Electronics
Anondita Medicarepass · The 250mn-piece male-condom lines running by January 2027
Health Products
Anondita Medicarepass · FY27 turnover of about ₹205cr (August offer document)
Health Products
Anondita Medicarepass · All four new lines installed and running (by January 2027)
Project milestone · Health Products
Anondita Medicarepass · First female-condom sales booked
Project milestone · Health Products
Antony Waste Handfollow · Supreme Court ruling on the Kanjurmarg site goes Antony's way
Utilities
Antony Waste Handfollow · Thane facility processing waste
Project milestone · Utilities
Apar Inds.wait · About ₹1,500cr of capex spent in FY27
Project milestone · Electrical Equipment
Apcotex Indsown · FY27 margin settles around management's 15–16% average, above FY26's 12%
Rubber · expected at least 15%
Apex Frozen Foodspass · FY27 volume reaching about 12,000 t, as guided
Food Products
Apex Frozen Foodspass · Ready-to-eat at 18–20% of sales
Food Products
Apollo Micro Systemsavoid · Underwater-mine order signed, expected December–January
Aerospace defence
Apollo Micro Systemsavoid · Order book of ₹3,500–4,000cr by March 2027
Aerospace defence · expected at least ₹3,500cr
Apollo Micro Systemsavoid · Unit 3 in full production
Project milestone · Aerospace defence
Apollo Pipesavoid · Margin moving back toward 7–8% (1% in Q1; guided within 12–15 months)
Plastics
Apollo Pipesavoid · Varanasi at about 30% use in FY27
Project milestone · Plastics
Apollo Pipesavoid · Tarapur capacity ready for ₹1,000cr of revenue
Project milestone · Plastics
Apollo Pipesavoid · Window profiles reach 7–8% of revenue
Project milestone · Plastics
Apollo Tyresown · Indian business margin back towards 14% in H2 FY27 as price rises catch up with rubber
Tyres
Apollo Tyresown · Europe margin heading to the guided 'high teens' once Dutch output has moved to Hungary and India
Tyres
Apollo Tyresown · FY27 capex runs at the ₹3,500cr plan (Q1 only ₹650cr; pace to rise in Q2–Q3) and Andhra Pradesh stays on its ₹5,810cr budget
Tyres
Apollo Tyresown · First Andhra Pradesh lines start production
Project milestone · Tyres
Apollo Tyresown · Hungary running at 21,000 car tyres a day
Project milestone · Tyres
Apollo Tyresown · Restructuring benefits visible in Europe's margin
Project milestone · Tyres
Archean Chemical Industriespass · Bromine at a 20,000-tonne exit run-rate at about ₹300/kg
Chemicals
Archean Chemical Industriespass · Potash volume of 9,000–10,000 tonnes in FY27
Chemicals
Ardee Industriesfollow · FY27 revenue growth within the guided 10–20%
Mining & Metals Recycle · expected at least 10%
Ardee Industriesfollow · FY27 volume toward the guided ~85,000 tonnes
Mining & Metals Recycle
Ardee Industriesfollow · Largest customer's share of sales below FY26's 41%
Mining & Metals Recycle
Ardee Industriesfollow · About 85,000 tonnes sold in FY27
Project milestone · Mining & Metals Recycle
Arihant Superstruct.pass · 2,500 home deliveries in FY27, as guided
Realty
Arihant Superstruct.pass · About ₹75cr spent on the hotel and gymkhana in FY27
Project milestone · Realty
Arkadewait · Thane launch in Q4 FY27
Realty
Arkadewait · FY27 pre-sales of about ₹1,000cr (guide cut from +20–25%)
Realty
Arkadewait · Margin of 25–26% (guide cut from 27–28%)
Realty
Artemis Medicarefollow · Gurugram margin reaching the raised 23–24% target
Hospitals
Arvind Fashionsfollow · FY27 revenue grows in the mid-teens, as guided
Retail · expected at least 14%
Arvind Fashionsfollow · Operating margin up 30–40 basis points in FY27, as guided
Retail
Arvind Fashionsfollow · Inventory turns rise towards 3.7–3.8x
Retail
Arvind Fashionsfollow · Bank debt back towards ₹390cr
Retail
Arvind SmartSpacesfollow · FY27 bookings reach ₹2,100–2,200cr (guide +35–40%)
Realty
Arvind SmartSpacesfollow · First Mumbai launch (Pen-Khopoli, then Goregaon) in H2 FY27
Realty
Arvind SmartSpacesfollow · FY27 operating cash of ₹400–500cr, as guided
Realty
Ashapura Minechemfollow · FY27 bauxite volume within the cut target of 9–11 million tonnes
Mining & Metals Recycle
Ashapura Minechemfollow · GSM jetty operational at 10 million tonnes
Project milestone · Mining & Metals Recycle
Ashiana Housingfollow · Aaroham Phase 3 launches in Q3–Q4 FY27
Realty
Ashiana Housingfollow · FY27 pre-sales about ₹2,200cr and revenue about ₹2,000cr as handovers land
Realty
Ashoka Buildconpass · Standalone margin reaching 9–9.5% in H2 (Q1: 7.2% before other income)
Construction
Ashoka Buildconpass · FY27 revenue growth of 10–15% (cut from 20%)
Construction
Asian Energy Servicesfollow · Kuiper delivers $60–65m of revenue in FY27, as guided
Oil
Asian Energy Servicesfollow · Indian revenue up 30–40% in FY27, as guided (Q1 +29%)
Oil
Asian Energy Servicesfollow · Mewar and Indrora at about 1,000 barrels a day
Project milestone · Oil
ASK Automotivefollow · FY27 operating margin 13.5–14% if aluminium eases, as guided
Auto Related · expected at least 13.5%
ASK Automotivefollow · New southern plant running before March 2027
Auto Related
ASK Automotivefollow · FY27 net revenue growth 'high teens', as guided
Auto Related
ASK Automotivefollow · New Bengaluru plant operational (before March 2027)
Project milestone · Auto Related
ASK Automotivefollow · Karoli plant at about 80% use
Project milestone · Auto Related
Astra Microwave Productsfollow · FY27 revenue reaching ₹1,350cr (±₹25cr) after a weak Q1
Aerospace defence
Astra Microwave Productsfollow · FY27 margin similar to FY26 as guided
Aerospace defence
Ather Energywait · Aurangabad (AURIC) plant starts trial output this festive season and reaches 42,000 a month by March 2027
Vehicles
Atlanta Electricalsown · FY27 revenue up about 40% (about ₹2,590cr), as guided
Electrical Transformers · expected at least 40%
Atlanta Electricalsown · FY27 operating margin of 17–18%, as guided
Electrical Transformers · expected at least 17%
Atlanta Electricalsown · 765 kV technology deal signed and first 765 kV bids made
Project milestone · Electrical Transformers
Aurionpro Solutionswait · Operating cash flow turning positive in H2
Software
Australian Premwait · FY27 revenue grows 30–35%, as guided (cut from 75%-plus)
Solar PV Cells EPC · expected at least 30%
Auto.Axlefollow · Next capex phase decided (6–9 months from May 2026)
Project milestone · Auto Related
Avalon Techfollow · FY27 revenue growth landing above 30% (guide 26–30%)
EMS & Electronics · expected at least 30%
Avalon Techfollow · US plant at break-even by March 2027, as guided
EMS & Electronics
Avantelpass · FY27 revenue of about ₹300cr as guided
Aerospace defence
Avanti Feedswait · FY27 feed volume of 585,000 t, as guided (raised)
Food Products
Awfis Space Solutionsfollow · FY27 cash EBITDA (after rent) of ₹190–200cr, with a Q4 lift
Commercial Services
Awfis Space Solutionsfollow · FY27 revenue above ₹1,800cr, about 21% growth (guide already cut from 25–27%)
Commercial Services · expected at least 21%
Awfis Space Solutionsfollow · 22,000–25,000 seats added for the year
Project milestone · Commercial Services
AXISCADES Technologiespass · Aerospace manufacturing at a yearly run rate above ₹375cr of revenue and ₹84cr of operating profit, as management targets (₹6.1cr of revenue in Q1; includes Cloud Wave)
Aerospace defence
AXISCADES Technologiespass · The kept business covers its interest and depreciation from reported operating profit, with no adjustments (Q1: ₹8.7cr against ₹8.9cr of interest and ₹8.8cr of depreciation)
Aerospace defence
AXISCADES Technologiespass · Defence orders turning into cash: the aged Ministry of Defence receivable recovered or not provided for again, and defence receivables not growing faster than defence revenue (₹4,557cr of forecast orders rests on this)
Aerospace defence
Azad Engineeringwait · Positive operating cash without more bill discounting
Aerospace defence
Azad Engineeringwait · Working capital falling to 160–180 days by the second half of FY27
Aerospace defence
Azad Engineeringwait · Substantive revenue from the new plants (H2 FY27 growth)
Project milestone · Aerospace defence
Azad Engineeringwait · Civil construction of the remaining plants complete
Project milestone · Aerospace defence
Bajaj Consumer Carewait · No new payments to promoter companies, and an explanation of the ₹27cr paid for flats
Consumer Durables
Bajaj Consumer Carewait · FY27 revenue growth in double digits, as aspired
Consumer Durables · expected at least 10%
Bajaj Electricalspass · Consumer-products margin of 6–7%, as guided
Consumer Durables
Bajaj Healthcarewait · Peptide plant (about 250 kg a year) commissioned by Q4 FY27, as promised on the July 2026 call
Project milestone · Pharma API
Bajaj Healthcarewait · Receivable days down to 110–120 (131 in June 2026, 145 in March)
Pharma API
Bajaj Healthcarewait · FY27 revenue growth of 10–15% as guided, with profit growing alike
Pharma API
Balaji Amineswait · FY27 volume up 10–15%
Chemicals
Balaji Amineswait · Acetonitrile plant started by the end of FY27
Chemicals
Balaji Amineswait · DME at 30–40% use
Project milestone · Chemicals
Balaji Amineswait · Unit 2 HCN/NaCN plant commissioned
Project milestone · Chemicals
Balaji Amineswait · Unit 1 EDA-derivatives plant commissioned
Project milestone · Chemicals
Balaji Amineswait · Acetonitrile plant commissioned
Project milestone · Chemicals
Balaji Amineswait · NMM plant commissioned
Project milestone · Chemicals
BASF Indiapass · Operating margin above 6% after the agro demerger (from January 2027)
Chemicals · expected at least 6%
Basilic Fly Studiopass · Second-half FY27 operating margin back above 20%, as promised
Media and Entertainment
Basilic Fly Studiopass · Debtor days fall below 90 and free cash flow turns positive for FY27
Media and Entertainment
Basilic Fly Studiopass · Organic revenue growth of about 30% or more in FY27, as guided (Q1 was +10%)
Media and Entertainment
Basilic Fly Studiopass · 100 full-time staff in Bengaluru
Project milestone · Media and Entertainment
Bata Indiawait · Volume growth above 5% once the new range is in shops (January–March 2027)
Consumer Durables
Bata Indiawait · Fees to Bata group companies growing slower than sales
Consumer Durables
Belrise Industriespass · FY27 revenue growth 'mid-teens', as guided
Auto Related · expected at least 14%
Belrise Industriespass · New programme (over ₹66cr a year) starts production
Project milestone · Auto Related
Belrise Industriespass · Solar-tracker assembly production starts
Project milestone · Auto Related
Belrise Industriespass · Haridwar at peak production
Project milestone · Auto Related
Beta Drugspass · FY27 revenue growth within the 20–25% guide
Pharma · expected at least 20%
Beta Drugspass · Intermediate plant in commercial production
Project milestone · Pharma
Bikaji Foodswait · FY27 revenue growth in the mid-to-high teens, as promised
Food Products · expected at least 15%
Bikaji Foodswait · A plan to replace the ~₹50cr PLI subsidy that ends after FY27
Food Products
Birlasoftfollow · A buyback or higher payout from the ₹2,879cr cash
Software
Black Boxwait · H2 revenue growth of 30–40% as the new US cloud client starts in November
Software · expected at least 30%
Black Boxwait · FY27 revenue ₹7,800–8,000cr and profit after tax ₹300–325cr, as guided
Software
Black Boxwait · Operating cash above 60% of EBITDA
Software
Black Boxwait · A full year without exceptional charges
Software
BlackBuckfollow · Vehicle finance profitable by end-FY27
Platform Cos
BLS Internationalown · Aadhaar (UIDAI) revenue at full run-rate of about ₹340cr a year by Q4 FY27–Q1 FY28
Travel Services
Blue Jet Healthcarewait · Two of about 20 contract proposals turning commercial in FY27
Pharma API
Blue Starwait · FY27 room-AC margin over 6.5% and projects margin 6.5–7%, as guided
Consumer Durables
Blue Starwait · Data-centre orders reaching the ₹3,000cr FY27 target
Consumer Durables
Borosilpass · Third double-walled line starts by January 2027
Project milestone · Consumer Durables
Borosil Renewablesfollow · First new furnace firing by end-March 2027
Industrials
Borosil Renewablesfollow · First new furnace fired and commissioned
Project milestone · Industrials
Brainbees Solutionswait · India adjusted EBITDA up double digits in FY27, as guided (−22% in Q1)
Retail
Brainbees Solutionswait · International losses fall below 5% of international revenue
Retail
Brigade Enterprisesfollow · Neopolis 2 (Hyderabad) and Whitefield–Hoskote (Bengaluru) launch on time in H2 FY27
Realty
Brigade Enterprisesfollow · FY27 pre-sales above ₹7,500cr (at least +20%)
Realty
Brigade Enterprisesfollow · FY27 commercial capex of ₹1,200–1,700cr spent
Project milestone · Realty
Brigade Hotel Ven.wait · H2 growth recovering toward the mid-teens promise as events return (Q1: +2%)
Hotels and Travels
Brigade Hotel Ven.wait · FY27 revenue growth in the mid-teens (promise)
Hotels and Travels · expected at least 14%
Brigade Hotel Ven.wait · ₹500cr of capex spent in FY27
Project milestone · Hotels and Travels
Caliber Mining & Logwait · Debt falls toward ₹750cr by March 2027
Mining & Metals Recycle
Caliber Mining & Logwait · FY27 revenue up 45–50%, as guided
Mining & Metals Recycle · expected at least 45%
Caliber Mining & Logwait · FY27 operating profit and net profit up 35%, as guided (Q1 profit −22%; rest of year must earn about ₹182cr)
Mining & Metals Recycle
Camlin Fineavoid · FY27 operating margin of 10–12% (cut from 12–14%)
Chemicals · expected at least 10%
Camlin Fineavoid · Vanillin output of about 3,000 tonnes for FY27
Project milestone · Chemicals
Campus Activewearwait · Operating margin in the 17–19% band in the second half (Q4)
Consumer Durables · expected at least 17%
Campus Activewearwait · A clean FY27 audit-trail report under the new CFO
Consumer Durables
Campus Activewearwait · Output of the new upper plants doubles to about 4 lakh a month
Project milestone · Consumer Durables
Capacite Infraproj.wait · Q4 FY27 revenue above ₹850cr
Construction · expected at least ₹850cr
Capacite Infraproj.wait · Auditor's qualification over ₹11.56cr of written-back receivables cleared in the FY27 accounts
Construction
Capacite Infraproj.wait · Remaining promoter pledge released by end-FY27
Construction
Capillary Technologiesfollow · FY27 revenue above ₹1,065cr and adjusted EBITDA above ₹172cr, as management says it will 'definitely beat'
Software
Caplin Point Labsfollow · New US injectable block on time for March 2027
Pharma
Caplin Point Labsfollow · US arm grows 25–30% in FY27 as promised
Pharma
Caplin Point Labsfollow · New injectable block with 5 more lines ready
Project milestone · Pharma
Carborundum Univer.follow · The ₹400cr of FY27 capex actually spent (₹53cr in Q1)
Industrials
Carborundum Univer.follow · Ceramics growth of 23–25% in FY27 (guidance)
Industrials
Carborundum Univer.follow · Serial supplies to the key customer under way
Project milestone · Industrials
Carysilfollow · FY27 revenue growth of about 15%, as guided
Consumer Durables · expected at least 15%
Carysilfollow · New quartz and steel sink lines running by March 2027
Consumer Durables
Carysilfollow · New quartz capacity running (by March 2027)
Project milestone · Consumer Durables
Carysilfollow · New steel-sink lines running (by March 2027)
Project milestone · Consumer Durables
Carysilfollow · Stone-fabrication unit running (by March 2027)
Project milestone · Consumer Durables
CCL Productsown · FY27 volume and operating profit both up about 15%, as guided
Food Products
CCL Productsown · Gross debt down to near ₹1,000cr by March 2027
Food Products
CE Info Systemspass · FY27 revenue growth above 10% without another government write-off
Software · expected at least 10%
CEATfollow · Camso's own mixing lines running
Project milestone · Tyres
Ceigall Indiawait · A clean internal-control audit report for FY27
Construction
Ceigall Indiawait · FY27 revenue growth of at least 15% with an 11–12.5% margin, as guided
Construction
Ceinsys Techpass · Operating cash flow above ₹80cr in FY27 (₹3cr in FY26)
Software
Ceinsys Techpass · Unbilled revenue (₹319cr) falling sharply, billed before 31 March after the Maharashtra water-scheme release
Software
Cello Worldwait · Two more steel lines commissioned (early 2027)
Project milestone · Consumer Durables
Cemindia Projectsfollow · Q4 FY27 revenue of ₹3,000–3,500cr
Construction · expected at least ₹3,000cr
Cemindia Projectsfollow · FY27 revenue growth of 25% as guided (Q1: +6%)
Construction · expected at least 25%
Centum Electronicswait · Own-design defence revenue jumping in H2 FY27 (helicopter radar, satellites)
EMS & Electronics
Centum Electronicswait · FY27 revenue up about 25%, as guided (was 25–30%)
EMS & Electronics · expected at least 25%
Centum Electronicswait · FY27 operating margin above about 13%, as guided
EMS & Electronics · expected at least 13%
Century Plyboards(I)wait · Debt falling towards ICRA's 2.2–2.3 times EBITDA by March 2027
Consumer Durables
Cera Sanitarywarefollow · FY27 revenue up 18–20%, as guided
Consumer Durables · expected at least 18%
Cera Sanitarywarefollow · FY27 operating margin of 13.5–14%, as guided (cut from 14–15%)
Consumer Durables · expected at least 13.5%
Cera Sanitarywarefollow · Faucet capacity of 5 lakh pieces a month running
Project milestone · Consumer Durables
Cera Sanitarywarefollow · Decision on the greenfield plant after the end-FY27 review
Project milestone · Consumer Durables
Chalet Hotelsfollow · Delhi airport Taj and second Powai office tower on time in Q4 FY27
Hotels and Travels
Chalet Hotelsfollow · At least 70 rooms launched
Project milestone · Hotels and Travels
Chalet Hotelsfollow · Cygnus 2 substantially complete
Project milestone · Hotels and Travels
Chembond Chemicalswait · Operating cash above 70% of profit in FY27
Chemicals
Chemplast Sanmaravoid · R-32 capacity at 14,000 tonnes by March 2027
Chemicals
Chemplast Sanmaravoid · 14,000 tonnes of R-32 capacity online
Project milestone · Chemicals
Chennai Petroleum Corporationwait · FY27 dividend stays above ₹30 a share
Oil
Chennai Petroleum Corporationwait · First fuel stations commissioned
Project milestone · Oil
Clean Max Env. Energfollow · At least 1.5 GW of new power-sales capacity commissioned in FY27 (403 MW in Q1)
Solar PV Cells EPC
Clean Max Env. Energfollow · Net debt stays within 5.5 times EBITDA
Solar PV Cells EPC
Clean Max Env. Energfollow · At least 1.5 GW commissioned in FY27 (at least 4.6 GW operating)
Project milestone · Solar PV Cells EPC
Clean Sciencewait · HALS revenue of ₹250–300cr in FY27
Chemicals
CMR Green Techwait · Operating cash turns positive (two quarters running)
Mining & Metals Recycle
CMR Green Techwait · FY27 volume up 25%, as guided
Mining & Metals Recycle
CMR Green Techwait · Shoolagiri and Bawal plants operating; capacity near 7 lakh tonnes
Project milestone · Mining & Metals Recycle
CMS Info Systemsown · Services revenue of ₹2,650–2,750cr for FY27 (the cut guide), with no further cut
Commercial Services
CMS Info Systemsown · Margin held at about 27% (raised guide) through FY27
Commercial Services
Concord Biotechfollow · FY27 growth above its historical ~18%, as guided (ICRA sees only 14–15%)
Pharma API · expected at least 18%
Concord Controlwait · ProGOTA's Kavach field trial and safety approval within FY27
Industrial - Railway
Control Printwait · FY27 core coding growth of 10–15% (guidance kept)
Hardware
Corona Remediesfollow · FY27 revenue growth at or above the ~17% guide
Pharma · expected at least 17%
Corona Remediesfollow · FY27 profit growth at or above the 20% guide
Pharma
Corona Remediesfollow · Hormone plant asset turn near 1
Project milestone · Pharma
Cosmic CRFwait · FY27 revenue at least 20% higher on 1,22,000–1,30,000 tonnes (guidance)
Industrial - Railway · expected at least 20%
Cosmic CRFwait · Insolvency tribunal approves the purchase and funding is fixed
Project milestone · Industrial - Railway
Cosmic CRFwait · Forging unit in full commercial production
Project milestone · Industrial - Railway
Cosmic CRFwait · FY27 volume of 1,22,000–1,30,000 tonnes
Project milestone · Industrial - Railway
Cosmo Firstfollow · FY27 revenue up about 20%, as guided (raised from 'double-digit')
Packaging · expected at least 20%
Cosmo Firstfollow · Net debt actually falling in H2 FY27 (₹1,166cr now; ₹400–500cr to be repaid in two years)
Packaging
Cosmo Firstfollow · Plastech (rigid packs) revenue of ₹150–160cr in FY27
Packaging
Cosmo Firstfollow · Coating line commissioned
Project milestone · Packaging
Craftsman Automationwait · Sunbeam at a mid-teens margin by Q4 FY27
Auto Related
Craftsman Automationwait · Positive free cash in FY27
Auto Related
Craftsman Automationwait · FY27 revenue growth 'mid-teens', as guided
Auto Related · expected at least 14%
Craftsman Automationwait · About 4 million alloy wheels produced in FY27
Project milestone · Auto Related
Crizacwait · H2 FY27 revenue at least matches H2 FY26
Retail
Crizacwait · FY27 operating margin of 25–27%, as guided
Retail · expected at least 25%
Crizacwait · Signed Australian or US contracts start producing revenue
Retail
Cyientwait · TAO Digital adds $40–50m of revenue in FY27 and integrates without an earnout dispute
Software
Cyientwait · TAO adds about $40–50m of revenue in FY27
Project milestone · Software
Data Patterns (India)follow · FY27 order inflow reaching about ₹2,000cr
Aerospace defence
Data Patterns (India)follow · Operating cash above half of profit
Aerospace defence
Data Patterns (India)follow · FY27 revenue growth of 20–25% as guided
Aerospace defence · expected at least 20%
Data Patterns (India)follow · FY27 margin within the widened 35–40% guide
Aerospace defence · expected at least 35%
Datamatic Global Serfollow · FY27 margin up about 0.5 points to near 20% (18.7% in FY26)
Software · expected at least 19%
DCWpass · FY27 operating profit better than FY26
Chemicals
DDev Plastiksown · FY27 volume up 15% to 2,31,000 tonnes
Chemicals
DDev Plastiksown · FY27 revenue up about 13%
Chemicals · expected at least 13%
DDev Plastiksown · Bhiwadi averages about 50% use for FY27
Project milestone · Chemicals
DEE Developmentfollow · FY27 operating margin above 19% (guidance; Q1 16.9%)
Industrials · expected at least 19%
DEE Developmentfollow · Net debt at ₹400–425cr by March 2027
Industrials
DEE Developmentfollow · FY27 revenue of at least ₹1,500cr (guidance)
Industrials
DEE Developmentfollow · Anjar at 60–65% use
Project milestone · Industrials
DEE Developmentfollow · Seamless plant at 60–70% use
Project milestone · Industrials
DEE Developmentfollow · Non-core revenue of about ₹80cr for FY27
Project milestone · Industrials
Deep Industriesown · FY27 revenue up 25–30%, as guided in May (Q1 +40%)
Oil · expected at least 25%
Deep Industriesown · FY27 profit of about ₹350cr, as targeted by management (₹224cr reported over the last twelve months)
Oil
Deep Industriesown · Kandla plant contributing to margins ('later in this financial year')
Project milestone · Oil
Deepak Fert & Petrowait · Both new plants commissioned and at about 80% use by Q4 FY27
Chemicals
Deepak Fert & Petrowait · About 80% use
Project milestone · Chemicals
Deepak Fert & Petrowait · About 80% use
Project milestone · Chemicals
Deepak Nitritewait · New intermediates selling from January 2027
Chemicals
Deepak Nitritewait · New intermediates in commercial supply
Project milestone · Chemicals
Deepak Nitritewait · Advanced Intermediates revenue of at least ₹3,000cr for FY27, with the new intermediates in regular supply from January 2027
Chemicals
Deepak Nitritewait · Polycarbonate cost still ₹11,500cr and start-up still H2 FY29 on every call; about ₹1,500cr spent in FY27
Chemicals
Deepak Nitritewait · First named strategic tie-up for polycarbonate compounds, which management said would come 'soon'
Chemicals
Delhiverywait · Express margin back in the 16–18% band in H2 FY27 (guidance)
Logistics
Delhiverywait · FY27 express volume +20–30% (better end) and part-truckload +18–22% (guidance)
Logistics
Dhanuka Agritechwait · FY27 operating margin around the ~18% guide (cut by 2 points)
Agrochemical & Fertilizers · expected at least 18%
Dharmaj Crop Guardfollow · FY27 revenue growth of 18–20% as guided
Agrochemical & Fertilizers · expected at least 18%
Dharmaj Crop Guardfollow · Technicals plant utilisation reaching 75% and profitable after interest and depreciation
Agrochemical & Fertilizers
Dharmaj Crop Guardfollow · Herbicide unit fully ready for the next kharif season
Project milestone · Agrochemical & Fertilizers
Dhoot Transmissionpass · FY27 revenue grows 25–30%, as guided
Auto Related · expected at least 25%
Dhoot Transmissionpass · Both plants running, adding 15–20% capacity within FY27
Project milestone · Auto Related
Diffusion Engineersfollow · Operating profit growing faster than revenue by H2 FY27
Industrials
Diffusion Engineersfollow · About 20% revenue growth in FY27 (guidance)
Industrials · expected at least 20%
Diffusion Engineersfollow · The ₹67cr of unspent IPO money spent on plant, not new ventures
Industrials
Diffusion Engineersfollow · FY27 revenue up 20% or more as the new plant ramps
Project milestone · Industrials
Digilogic Systemspass · FY27 revenue growth of 25–30% as guided
Aerospace defence · expected at least 25%
Dilip Buildconwait · Standalone net debt falling by ₹600–800cr in FY27 as promised
Construction
Dilip Buildconwait · Mine revenue towards the ₹2,500cr FY27 target (Q1: ₹362cr)
Construction
Dilip Buildconwait · Siarmal produces about 27m tonnes
Project milestone · Construction
Dishman Carbogen (Carbogen Amcis)avoid · Net debt below CHF 140m
Pharma CDMO
Dr Agarwal's Health Carewait · New-centre losses for FY27 within the ₹30–40cr guided (about ₹20cr in Q1 alone)
Hospitals
Dr Agarwal's Health Carewait · 60 new centres opened for the year
Project milestone · Hospitals
Dr Lal PathLabsfollow · FY27 revenue growth of 13–15%, leaning mid-teens (guidance)
Healthcare Diagnostic · expected at least 13%
Dr Lal PathLabsfollow · FY27 margin at 27–28% or better (guidance)
Healthcare Diagnostic · expected at least 27%
Dr Lal PathLabsfollow · 12–15 new labs opened during FY27
Project milestone · Healthcare Diagnostic
Dynamic Cablesown · Reengus plant running and adding revenue from Q4 FY27
Cables
EFC (I)wait · 18,000–20,000 seats added in FY27 as guided
Commercial Services
EFC (I)wait · Design-and-build growth of about 50% in FY27 (raised target)
Commercial Services
EFC (I)wait · 18,000–20,000 new billable seats added
Project milestone · Commercial Services
EFC (I)wait · Furniture plant reaches 60–70% use
Project milestone · Commercial Services
EIHfollow · FY27 margins better than FY26, as management said; operating profit growing after two flat years
Hotels and Travels
Eldeco Housing & Indwait · Approvals and launches on the four new Lucknow parcels by March 2027
Realty
Eldeco Housing & Indwait · FY27 bookings above FY26's ₹744cr
Realty
Eldeco Housing & Indwait · Margins of 30–35% and 25% after tax, as guided
Realty
Elecon Engg.Cofollow · FY27 revenue growth at least low double digits (about 10%+), as guided
Electrical Equipment · expected at least 10%
Elecon Engg.Cofollow · Gear-segment EBITDA margin moving back toward the ~24% guided for FY27 (from 18.8%)
Electrical Equipment
Elecon Engg.Cofollow · The Navy carrier-gear order booked, expected in Q4 FY27
Electrical Equipment
Electronics Mart Indwait · FY27 operating margin in the 7.5–8% guide
Retail · expected at least 7.5%
Electronics Mart Indwait · FY27 revenue up 18–20%, as guided
Retail · expected at least 18%
Electronics Mart Indwait · 25–30 new stores opened in FY27
Project milestone · Retail
Ellen. Indl. Gaswait · FY27 revenue growth of 20% (guide for each of the next 2–3 years)
Chemicals · expected at least 20%
Emcure Pharmafollow · Indian organic growth (without in-licensed brands) back in double digits in H2 FY27
Pharma
Emcure Pharmafollow · FY27 margin up the promised 70–100 basis points
Pharma
Emcure Pharmafollow · FY27 revenue growth at the higher end of low-to-mid teens
Pharma · expected at least 14%
Emmvee Photovoltaic Power Ltdfollow · FY27 operating profit of about ₹2,400cr, as targeted
Solar PV Cells EPC
Emmvee Photovoltaic Power Ltdfollow · 6 GW plant on time: cells from March 2027
Solar PV Cells EPC
Emmvee Photovoltaic Power Ltdfollow · Cell line commissioned
Project milestone · Solar PV Cells EPC
EMS Limitedavoid · FY27 revenue ₹900–950cr, as cut-down guidance says
Utilities
EMS Limitedavoid · Debtor and inventory days coming down from a 333-day filed cash cycle
Utilities
eMudhrawait · Positive free cash flow in FY27 (−₹52cr in FY26)
Software
Engineers Indiafollow · Consultancy revenue growing 25% or more in FY27
Construction
Engineers Indiafollow · FY27 revenue growth of at least 10% as guided
Construction · expected at least 10%
Engineers Indiafollow · FY27 order inflow of about ₹8,000cr, including IOCL Paradip and BPCL Andhra awards
Construction
Enterofollow · Revenue up 23% before new acquisitions, as guided
Retail
Enterofollow · Half of FY27 EBITDA turns into operating cash
Retail
Enterofollow · Partner buy-outs (₹343cr owed) paid without new debt
Retail
Enviro Infra Engine.wait · FY27 revenue ₹2,000cr and profit ₹260–270cr, as guided (about 40% of revenue expected in Q4)
Utilities
Enviro Infra Engine.wait · FY27 operating margin 19–20%, as guided
Utilities · expected at least 19%
Enviro Infra Engine.wait · Suyog Urja revenue of ₹400–450cr for FY27
Project milestone · Utilities
EPack Prefab Techno.follow · FY27 revenue of ₹1,900–1,950cr as guided
Construction
EPack Prefab Techno.follow · FY27 order inflow on track for ₹2,000cr
Construction
EPack Prefab Techno.follow · Ghiloth and Gujarat plants starting on time
Construction
Epigralown · CPVC price holds after the new plant starts
Chemicals
Epigralown · FY27 revenue growth of 15–20% (guide for each of the next 3–5 years)
Chemicals · expected at least 15%
EPLown · Court and shareholder approval of the Indovida merger by Q4 FY27
Packaging
EPLown · FY27 profit up double digits, as guided, with tax at 20–22%
Packaging
EPLown · Indovida merger completed
Project milestone · Packaging
Eris Lifescienceswait · Bhopal insulin lifts gross margin back towards 76% by Q4 FY27
Pharma
Eris Lifescienceswait · FY27 operating margin 36% (back-loaded), as guided
Pharma · expected at least 36%
Eris Lifescienceswait · Gross margin back towards 76% as Bhopal supplies insulin
Project milestone · Pharma
Ester Industriespass · Gross debt down to ₹620cr by March 2027 (₹722cr now)
Packaging
Ester Industriespass · Specialty-polymer demand recovering by Q4 FY27
Packaging
Eureka Forbeswait · FY27 revenue growth above FY26's 11.3%, as guided
Consumer Durables · expected at least 11.3%
Eureka Forbeswait · FY27 margin at or above FY26's 12.2% (company's adjusted basis)
Consumer Durables
Exicom Tele-Sys.pass · Tritium breaks even in Q4 FY27, with revenue three times FY26
Electrical Equipment
Exide Industrieswait · First revenue from the Bengaluru cell plant (promised 'during FY27')
Project milestone · Auto Related
Exide Industrieswait · Fourth line, for car makers' cells, commissioned (end of FY27)
Project milestone · Auto Related
Exide Industrieswait · A named two-wheeler maker approves Exide's cells for series supply
Auto Related
Exide Industrieswait · Fourth line (large LFP cells for storage and cars) commissioned by March 2027
Auto Related
Exide Industrieswait · Standalone lead-acid revenue growth of at least 9% in FY27
Auto Related
Fairchem Organicspass · Utilisation exit rate of 70–75%
Chemicals
Fiem Industriesown · FY27 revenue grows 15–20%, as guided
Auto Related · expected at least 15%
Fineotex Chemicalwait · CrudeChem revenue of US$100M in FY27
Chemicals
Fredun Pharmapass · FY27 operating cash above ₹40cr
Pharma
Fredun Pharmapass · FY27 revenue about ₹800cr (+25–30%), as guided
Pharma · expected at least 25%
Freshara Agrowait · Cash-positive for FY27, as promised
Food Products
Freshara Agrowait · FY27 revenue of about ₹575cr, as guided (trimmed from ₹600cr)
Food Products
Frontier Springspass · ₹500cr gross revenue in FY27 (reaffirmed guidance)
Auto Related
Frontier Springspass · FY27 operating margin 23–24%, as guided
Auto Related · expected at least 23%
Gabriel Indiapass · Debt within the ₹800–1,000cr guided range
Auto Related
Gala Precision Engi.own · Operating margin into the guided 17–19% by FY27 end (Q1 16.3%)
Industrials · expected at least 17%
Gala Precision Engi.own · FY27 revenue growth of 20–25% (guidance)
Industrials · expected at least 20%
Gala Precision Engi.own · FY27 operating cash improves under the KPMG working-capital plan
Industrials
Gala Precision Engi.own · Chennai phase 2 producing (was due June–July 2026)
Project milestone · Industrials
Gala Precision Engi.own · Chennai sales reach ₹9–10cr a month
Project milestone · Industrials
Gala Precision Engi.own · Wada land deal completed (only an MoU in Q1), so capex can start next year
Project milestone · Industrials
Galaxy Surfactantsfollow · FY27 EBITDA of ₹24,000–25,000 a tonne (raised guide)
Chemicals
Gandhar Oil Refinery (India)wait · FY27 volume growth of 8–11%, as guided
Oil
Ganesh Benzoplastwait · The new JNPT tanks filled and earning by Q4 FY27
Oil
Management changed this (2026-09-30): On 29 Sep 2026 the company agreed to sell its liquid storage and rail logistics businesses (including JNPT) for ₹1,154cr; if the sale closes, this checkpoint no longer applies to the company
Ganesh Benzoplastwait · New tanks earning revenue
Project milestone · Oil
Management changed this (2026-09-30): On 29 Sep 2026 the company agreed to sell its liquid storage and rail logistics businesses (including JNPT) for ₹1,154cr; if the sale closes, this checkpoint no longer applies to the company
Ganesh Housingavoid · Million Minds rent starts in Q4 FY27
Realty
Ganesh Housingavoid · FY27 revenue of ₹1,000–1,200cr and profit of ₹300–325cr (first guide)
Realty
Ganesh Housingavoid · Rent starts coming in from Million Minds Phase 1
Project milestone · Realty
Garware Hi-Techfollow · FY27 revenue of at least ₹2,500cr, as guided
Plastics
Garware Hi-Techfollow · FY27 operating margin within the 25% ±2 guide
Plastics · expected at least 23%
Garware Hi-Techfollow · FY27 revenue at least ₹2,500cr, with paint-protection film back to about a quarter of sales (it was 20% in Q1)
Plastics
Garware Hi-Techfollow · 50 Garware Home Solutions studios open
Plastics
GE Powerpass · Core services orders growing in FY27 without one-off gains
Electrical Equipment
Genus Powerwait · FY27 revenue of ₹6,000–6,500cr, as guided
Electrical Equipment
Genus Powerwait · Over 1 crore meters installed in FY27, as guided
Electrical Equipment
GHCLown · Bromine and vacuum-salt unit bringing meaningful revenue from Q4 FY27
Chemicals
GHCLown · Both units at intended capacity
Project milestone · Chemicals
GK Energywait · FY27 revenue doubling to about ₹3,000cr as planned
Construction · expected at least 100%
Gland Pharmaown · FY27 revenue growth at least 15% at constant currency (raised guide)
Pharma CDMO
Gland Pharmaown · New Fontenay ampoule line in production
Project milestone · Pharma CDMO
Global Health (Medanta)wait · Noida hospital at operating break-even in H2 FY27 (guidance; Q1 loss ₹4.9cr)
Hospitals
Global Health (Medanta)wait · FY27 capex within ₹800–900cr (guidance)
Hospitals
Global Health (Medanta)wait · Noida reaches operating break-even (guided H2 FY27)
Project milestone · Hospitals
GNG Electronicswait · FY27 revenue growth of 30% (raised from 25%)
Hardware · expected at least 30%
Godavari Powerfollow · Operating margin back above 23% in Q4 FY27, when management expects the recovery (Q1: 19% against 24–25% promised)
Mining & Metals Recycle · expected at least 23%
Godavari Powerfollow · Tree-cutting/dumping-land approval received and the mining ramp-up under way from Q4 FY27
Mining & Metals Recycle
Godavari Powerfollow · FY27 revenue of ₹6,000cr-plus, the guidance kept after Q1
Mining & Metals Recycle
Godrej Agrovetfollow · FY27 revenue growth in 'early double digits', as guided
Food Products · expected at least 10%
Godrej Agrovetfollow · FY27 profit before tax up 'double-digit' (company figures), as guided (cut from mid-teens)
Food Products
Godrej Agrovetfollow · Phase 2 of the integrated complex running
Project milestone · Food Products
Godrej Agrovetfollow · About 17,000 hectares of new area added in FY27
Project milestone · Food Products
Gopal Snackspass · FY27 revenue of ₹1,800–1,900cr, as guided
Food Products
Gopal Snackspass · FY27 margin of 8–9% with Rajkot running all year
Project milestone · Food Products
GPT Healthcare (Agilus)follow · Raipur hospital breaking even around January 2027 (loses about ₹3cr a quarter)
Hospitals
GPT Healthcare (Agilus)follow · Jamshedpur hospital opening on time, late in FY27
Hospitals
GPT Healthcare (Agilus)follow · FY27 revenue growth of about 15% (guidance)
Hospitals · expected at least 15%
GPT Healthcare (Agilus)follow · Jamshedpur hospital commissioned
Project milestone · Hospitals
GPT Infraprojectsfollow · FY27 revenue of about ₹1,700cr (+30%), needing about ₹1,400cr in the last nine months
Construction · expected at least 30%
Granules Indiawait · Peptide arm profitable for FY27, as guided
Pharma
Granules Indiawait · FY27 operating margin within the reinstated 22–23% guide
Pharma · expected at least 22%
Granules Indiawait · Genome Valley plant past 50% use by March 2027
Pharma
Granules Indiawait · Genome Valley above 50–60% use
Project milestone · Pharma
Gravita Indiaown · Copper earning about ₹60,000 a tonne by March 2027, as guided (₹55,151 in Q1)
Mining & Metals Recycle
Gravita Indiaown · FY27 profit growth within the 25–30% a year target (Q1 +14%)
Mining & Metals Recycle
Gravita Indiaown · FY27 operating cash catching up with profit (FY26: ₹169cr against ₹378cr of profit)
Mining & Metals Recycle
Gravita Indiaown · Copper plant use up from 50% to 60% or more
Project milestone · Mining & Metals Recycle
Greaves Cottonpass · Core engine margin back above 13% (13–15% target) in the second half
Pumps Comp & Eng
Greaves Cottonpass · Core business grows 16–20% in FY27, as guided
Pumps Comp & Eng
Greenlam Industrieswait · Chipboard use near 70% and plywood break-even by the last quarter of FY27
Consumer Durables
Greenlam Industrieswait · Net debt down about ₹100cr in FY27
Consumer Durables
Greenlam Industrieswait · FY27 revenue up about 18%, as guided
Consumer Durables · expected at least 18%
Greenlam Industrieswait · New laminate lines start commercial production
Project milestone · Consumer Durables
Greenply Industrieswait · MDF volume up 25–30% and plywood volume up 10% in FY27, as guided
Consumer Durables
Greenply Industrieswait · Net debt peaking within ₹710–730cr, as guided
Consumer Durables
GRPpass · FY27 revenue grows 20% or more, as guided
Rubber · expected at least 20%
GRPpass · Reclaim-rubber margin moves into the 10–14% target band without credits
Rubber
GRPpass · Meaningful carbon black sales begin
Project milestone · Rubber
GRPpass · Phase 1B (extra pyrolysis lines and carbon black) fully commissioned by February 2027
Project milestone · Rubber
Gufic Bioscienceswait · Indore at 40–45% use by March 2027
Pharma
Gufic Bioscienceswait · FY27 revenue growth within the 15–20% “bare minimum” guide
Pharma · expected at least 15%
Gufic Bioscienceswait · FY27 operating margin about 18%, as guided
Pharma · expected at least 18%
Gufic Bioscienceswait · Indore at 40–45% use
Project milestone · Pharma
Gujarat Fluorochemicwait · Battery-materials sales of ₹100cr or more in Q4 FY27
Chemicals
Gujarat Fluorochemicwait · LFP cathode approved and selling by the end of FY27
Chemicals
Gujarat Fluorochemicwait · Fluoropolymer sales grow 17–20% in FY27
Chemicals
Gujarat Fluorochemicwait · Battery sales of ₹100cr+ in a quarter
Project milestone · Chemicals
Gujarat Fluorochemicwait · R-134a plant commissioned
Project milestone · Chemicals
Gulf Oil Lubricantown · Capacity lifted 70% to 2.4 lakh kL by March 2027 (new plants in Q3 and Q4 FY27)
Oil
Gulf Oil Lubricantown · Silvassa expansion commissioned (by March 2027)
Project milestone · Oil
H.G. Infra Engg.wait · Standalone debt falling towards ₹900cr
Construction
H.G. Infra Engg.wait · About ₹4,000cr of H2 revenue at about 15% margin (FY27 guide ₹6,000–6,500cr)
Construction
H.G. Infra Engg.wait · First battery projects commissioned (from February 2027)
Project milestone · Construction
H.G. Infra Engg.wait · All plants commissioned (extended deadline 31 March 2027)
Project milestone · Construction
Happiest Mindswait · FY27 organic constant-currency growth of 12.5%, as guided (6.7% in Q1)
Software
Happy Forgingswait · First output and sales from the heavy-parts line in Q4 FY27
Forging
Happy Forgingswait · FY27 volume growth in the high teens (guidance)
Forging
Happy Forgingswait · First output from the heavy line (from January 2027)
Project milestone · Forging
Happy Forgingswait · Forging capacity reaches 161,000 tonnes
Project milestone · Forging
Happy Forgingswait · Heavy-parts line installed, with trials under way by March 2027
Forging
Happy Forgingswait · Industrial at least 17% of FY27 revenue (16% in Q1)
Forging
Happy Forgingswait · Cars at least 8% of FY27 revenue
Forging
Harsha Engineers Intown · Harsha Advantek at ₹140cr of sales and profitable by March 2027
Bearings
Harsha Engineers Intown · Advantek sells ₹140cr or more in FY27
Project milestone · Bearings
Harsha Engineers Intown · Advantek turns profitable by the end of FY27
Project milestone · Bearings
HBL Engineeringfollow · FY27 revenue above FY26's ₹3,303cr, as management expects (‘significantly better’)
Industrials
HBL Engineeringfollow · Industrial-battery segment revenue at least ₹1,500cr in FY27
Industrials
Hexagon Nutritionfollow · FY27 revenue growth within the 20–25% guide
Pharma Others · expected at least 20%
Himadri Specialityfollow · 200-tonne CNT plant commissioned
Project milestone · Chemicals
Hind Rectifiersfollow · FY27 standalone revenue growth of 30% (guidance; Q1 +10%)
Industrial - Railway · expected at least 30%
Hind Rectifiersfollow · Elventive France breaking even within the 3–5 quarters management expects
Industrial - Railway
Hind Rectifiersfollow · Standalone revenue up 30% for FY27
Project milestone · Industrial - Railway
Hindustan Foodswait · FY27 operating cash above 70% of operating profit
Food Products
Hindustan Foodswait · FY27 profit of ₹200–220cr, as guided
Food Products
Hindustan Foodswait · Footwear unit back in profit in H2 FY27
Food Products
Hindustan Foodswait · Lucknow plant commissioned
Project milestone · Food Products
Hindustan Foodswait · Panipat phase 2 running
Project milestone · Food Products
Hindustan Foodswait · New bottling lines commissioned
Project milestone · Food Products
Hindware Home Innov.pass · Roorkee volumes contribute meaningfully (second half of FY27)
Project milestone · Consumer Durables
HLE Glascoatpass · ₹35cr Omeras tank plant in India by Q4 FY27
Industrials
HLE Glascoatpass · Omeras India plant running
Project milestone · Industrials
Honasa Consumer (Mamaearth)wait · Clean margin rising toward 11–12% for FY27 (margin +1.5–2 points), as guided
Consumer Durables
Honasa Consumer (Mamaearth)wait · FY27 revenue growth above the high teens, as guided
Consumer Durables · expected at least 18%
ICE Make Refrig.avoid · FY27 operating margin of 6–6.5% after the price rises (third cut guidance)
Industrials · expected at least 6%
ICE Make Refrig.avoid · FY27 revenue of ₹830–850cr (guidance)
Industrials
ICE Make Refrig.avoid · Borrowings (₹158cr) fall in H2 FY27 with the Galilei money
Industrials
ideaForge Technologywait · Army fast-track and field-commander drone orders placed in H2 FY27, before the book runs out after December
Aerospace defence
ideaForge Technologywait · Less development spending capitalised than FY26's ₹81.6cr
Aerospace defence
IFB Industrieswait · A first dividend in five years
Consumer Durables
IFB Industrieswait · 13 kg and 14 kg front-loaders launched (promised this year)
Project milestone · Consumer Durables
IFGL Refractoriespass · Europe (Monocon, Sheffield, Hofmann) at break-even by Q4 FY27
Elect and Refrac
IFGL Refractoriespass · FY27 group margin in double digits as guided
Elect and Refrac · expected at least 10%
IFGL Refractoriespass · A new site and funding plan for Khordha or the Gujarat joint venture
Elect and Refrac
IKIO Technologiesfollow · FY27 revenue up 18–20%, as guided (trimmed from 20–22%)
EMS & Electronics · expected at least 18%
IKIO Technologiesfollow · Block II filling and asset turns rising from about 2 times, with free cash turning positive
EMS & Electronics
IKIO Technologiesfollow · Remaining IPO money for the plant spent
Project milestone · EMS & Electronics
Indegenefollow · Operating margin at 19–20% by Q4 FY27 (management's moved target)
Healthcare · expected at least 19%
Indegenefollow · US class-action final hearing (12 January 2027) and the ₹43.7cr tax appeal resolved without damage
Healthcare
India Pesticideswait · Hamirpur reaching ₹50–60cr of sales in FY27
Agrochemical & Fertilizers
India Pesticideswait · Hamirpur sells ₹50–60cr in FY27
Project milestone · Agrochemical & Fertilizers
Indiqube Spaceswait · FY27 revenue growth of 25–30% as guided
Commercial Services · expected at least 25%
Indiqube Spaceswait · 25–30 MW of new solar added
Project milestone · Commercial Services
Indiqube Spaceswait · About 2m sq ft of rent-paying area added in FY27
Project milestone · Commercial Services
Indo Farmpass · FY27 revenue growth of 20–25%, as guided
Vehicles · expected at least 20%
Indo Farmpass · Crane dealers rising from about 25 toward 60
Vehicles
Indo Farmpass · First revenue from the new plant
Project milestone · Vehicles
Indoco Remediespass · Debt below ₹800cr (₹110cr repayment this year)
Pharma
Indoco Remediespass · Operating margin back into double digits in FY27, as management aims
Pharma · expected at least 10%
Infibeam Avenues · FY27 EPS of ₹8.75–9.50, as guided
Platform Cos
InfoBeans Technologiesown · Company-basis margin heading back towards the 24% target by H2 (22.6% in Q1)
Software
Innova Captabfollow · Export approvals for Jammu by end-FY27
Pharma CDMO
Innova Captabfollow · Export product approvals for Jammu
Project milestone · Pharma CDMO
Inox Indiafollow · FY27 revenue growth of 18–20% (reaffirmed guidance)
Industrials · expected at least 18%
Inox Indiafollow · Kandla port plant starts on time (Dec 2026–Jan 2027)
Industrials
Inox Indiafollow · Operating cash above ₹200cr in FY27
Industrials
Inox Indiafollow · Kandla plant commissioned
Project milestone · Industrials
Inox Windavoid · FY27 revenue up 75%, as guided
Electrical Equipment · expected at least 75%
Inox Windavoid · FY27 EBITDA margin of 20–22%, as guided (company basis)
Electrical Equipment
Insecticides (India)wait · Finance cost down 25–30% in FY27 as promised
Agrochemical & Fertilizers
Insecticides (India)wait · Sotanala plant starting on its revised (six-month-late) date
Agrochemical & Fertilizers
Insolation Energypass · FY27 revenue up 60%, as guided
Solar PV Cells EPC · expected at least 60%
Insolation Energypass · Power revenue about ₹135cr in FY27
Project milestone · Solar PV Cells EPC
Interarch Buildingwait · FY27 revenue of ₹2,150–2,200cr as guided
Construction
Interarch Buildingwait · Phase 2 complete
Project milestone · Construction
Inventurus Knowledge Solutionsfollow · Net debt falling toward 2x EBITDA (target by FY28)
Software
IOL Chem & Pharmafollow · FY27 revenue up 15–20%, as guided
Pharma API · expected at least 15%
IOL Chem & Pharmafollow · European tablet plant shipping in Q3–Q4 FY27
Pharma API
IOL Chem & Pharmafollow · Paracetamol plant at about 70% use
Project milestone · Pharma API
ION Exchagewait · Roha resin plant utilisation disclosed after Q2 and on track for 25% in FY27
Utilities
ION Exchagewait · Projects (treatment solutions) losses shrinking; a significant part of the large old Uttar Pradesh project done by March
Utilities
ION Exchagewait · Roha at 25% capacity use
Project milestone · Utilities
Ipca Laboratorieswait · FY27 revenue growth within the raised 14–16% guide
Pharma · expected at least 14%
Ipca Laboratorieswait · FY27 operating margin at the raised 23% guide
Pharma · expected at least 23%
Ipca Laboratorieswait · Pisgah formulation plant ready to commission
Project milestone · Pharma
IRB Infra.Devl.follow · FY27 construction revenue above ₹3,000cr as guided
Construction
IRB Infra.Devl.follow · Toll revenue growth of about 10% in FY27 as guided
Construction
IRB Infra.Devl.follow · Profit growth of 25% in FY27 (guided 25% a year to FY30)
Construction
Ircon Intl.pass · FY27 revenue of about ₹9,000cr as guided (revenue stops shrinking)
Construction
Ircon Intl.pass · About ₹400–500cr invested in the project companies
Project milestone · Construction
IZMOavoid · Foreign subsidiaries (about 81% of revenue) audited by a recognised firm
Software
IZMOavoid · Chip-packaging revenue of ₹45–50cr in FY27 (₹9.2cr in Q1)
Project milestone · Software
J Kumar Infraown · Q4 FY27 revenue above about ₹1,800cr
Construction · expected at least ₹1,800cr
J Kumar Infraown · FY27 revenue growth of 15%, mostly in the second half
Construction · expected at least 15%
Jash Engineeringfollow · FY27 revenue of ₹875cr (guidance, needs the Q4 dispatch season)
Industrials
Jash Engineeringfollow · FY27 profit of ₹100–105cr (guidance)
Industrials
Jash Engineeringfollow · FY27 revenue of ₹875cr and profit of ₹100–105cr
Project milestone · Industrials
JD Cablesavoid · FY27 revenue growth of 40–50% (cut from 50–60%)
Cables · expected at least 40%
JD Cablesavoid · About ₹100cr of revenue from the new unit in FY27
Project milestone · Cables
Jeena Sikho Lifecareown · Operating beds cross 3,000 by March 2027, as now promised
Pharma Others
Jeena Sikho Lifecareown · FY27 profit of at least ₹300cr, as promised in June (Q1 pace about ₹240–265cr)
Pharma Others
Jeena Sikho Lifecareown · Operating beds pass 3,000
Project milestone · Pharma Others
Jindal Drilling and Industriesfollow · FY27 revenue falls no more than the expected 10–15% as three rigs go off hire
Oil · expected at least -15%
JK Tyre & Industwait · Operating margin back to 11–13% in H2 FY27 (6.5% in Q1), as guided
Tyres · expected at least 11%
JK Tyre & Industwait · Net debt stays inside CARE's 3.5-times operating-profit trigger (debt to rise only ₹500–700cr in FY27, as guided)
Tyres
JK Tyre & Industwait · FY27 operating margin about 10–11%, as guided
Tyres · expected at least 10%
JK Tyre & Industwait · About 7% extra capacity running
Project milestone · Tyres
JNKwait · FY27 revenue growth of 20–25% (trimmed guidance)
Industrials · expected at least 20%
JNKwait · FY27 operating margin inside 12–14% (trimmed guidance)
Industrials · expected at least 12%
JTEKT Indiapass · Capex actually falling, as management says it will 'reduce'
Auto Related
JTEKT Indiapass · Royalty to the Japanese parent grows no faster than sales in FY27
Auto Related
JTEKT Indiapass · Brazil export supplies of about 70,000 units in FY27
Project milestone · Auto Related
Jubilant Ingreviawait · FY27 EBITDA of ₹750–800cr, as guided
Pharma CDMO
Jubilant Ingreviawait · Gajraula plant starts production
Project milestone · Pharma CDMO
Jubilant Ingreviawait · Niacinamide plant above 70% of peak volumes
Project milestone · Pharma CDMO
Jubilant Pharmovawait · H2 FY27 margin reaching the guided 17–18%
Pharma CDMO
Jubilant Pharmovawait · FDA approvals for Line 3 products
Pharma CDMO
Jubilant Pharmovawait · MIBG filing in H2 FY27
Pharma CDMO
Jubilant Pharmovawait · Commercial production on Line 3 (subject to FDA approval)
Project milestone · Pharma CDMO
Juniper Hotelswait · Novotel Imagicaa purchase closing by March 2027
Hotels and Travels
Juniper Hotelswait · Phase 2 construction starts
Project milestone · Hotels and Travels
Jupiter Life Line Hospitalswait · FY27 margin of 20–21% (guidance, down from 22.9%)
Hospitals
Jupiter Life Line Hospitalswait · Rest of the BKC land paid
Project milestone · Hospitals
Jupiter Wagonspass · 60–70% of the order book delivered in FY27 (guidance)
Industrial - Railway
Jupiter Wagonspass · Axle line commissioned and partial production starts
Project milestone · Industrial - Railway
Jupiter Wagonspass · Odisha axle line commissioned and selling axles
Industrial - Railway
Jupiter Wagonspass · Railways wagon tender awarded, with Jupiter's share near its expected 7,000 wagons a year
Industrial - Railway
Jupiter Wagonspass · Battery-storage order book at ₹1,000cr by end-FY27
Industrial - Railway
Jupiter Wagonspass · Container revenue doubled in FY27 (about ₹175cr in the standalone product table)
Industrial - Railway
Jyothy Labsfollow · Gross margin rising again in Q4 FY27 (second quarter in a row)
Consumer Durables
Jyoti CNC Auto.wait · Operating cash near half of operating profit in H2 FY27 (one half-year of the promised cash)
Industrial Machinery
Jyoti CNC Auto.wait · No Huron impairment in FY27, as management promised; French case not escalating
Industrial Machinery
Jyoti CNC Auto.wait · FY27 revenue growth of 25–30% (guidance)
Industrial Machinery · expected at least 25%
Jyoti CNC Auto.wait · A clearly stronger second half, with FY27 sales up 25–30%
Project milestone · Industrial Machinery
Kajaria Ceramicsfollow · FY27 EBITDA of ₹1,000cr or more, as guided
Consumer Durables
Kajaria Ceramicsfollow · The two large-format lines starting on time in March–April 2027
Consumer Durables
Kalpataru Proj.follow · FY27 order inflow above ₹30,000cr, as guided
Construction - Power
Kalpataru Proj.follow · FY27 revenue growth of about 15% or more, as guided
Construction - Power · expected at least 15%
Kalpataru Proj.follow · FY27 pre-tax margin up 0.75–1 point, as guided
Construction - Power
Kansai Nerolacfollow · FY27 operating margin of 13–14%, as guided
Consumer Durables · expected at least 13%
Kaynes Technologywait · FY27 chip and board revenue of ₹450–500cr, as guided (cut from ₹550–700cr)
EMS & Electronics
Kaynes Technologywait · A clean first audit by Walker Chandiok
EMS & Electronics
Kaynes Technologywait · ₹450–500cr of chip and board revenue in FY27
Project milestone · EMS & Electronics
Kaynes Technologywait · Chip packaging and bare boards together book at least ₹450cr of FY27 revenue
EMS & Electronics
Kaynes Technologywait · Meter plan announced by February 2027 and meter receivables below ₹1,000cr
EMS & Electronics
Kaynes Technologywait · Contract electronics (EMS) revenue up at least 25% in FY27
EMS & Electronics
KEC Internationalwait · Net debt down to about ₹5,500cr by March 2027, as guided
Construction - Power
KEC Internationalwait · FY27 revenue up 12–15%, as guided
Construction - Power · expected at least 12%
Keystone Realtorsfollow · FY27 pre-sales of ₹5,000cr (Q1 was ₹617cr, 12% of target)
Realty
Keystone Realtorsfollow · GTB Nagar and Dindoshi cluster projects launch in H2 FY27
Realty
Keystone Realtorsfollow · FY27 operating cash near ₹1,000cr
Realty
Kilburn Engg.wait · FY27 revenue about ₹700cr (cut guidance)
Industrials
Kilburn Engg.wait · FY27 operating margin about 20% (cut guidance)
Industrials · expected at least 20%
Kiri Industriesavoid · ₹4,500–5,000cr spent on the copper complex by March 2027
Chemicals
Kiri Industriesavoid · About ₹4,500–5,000cr of project capex spent
Project milestone · Chemicals
Kirloskar Brothersfollow · FY27 revenue grows in double digits (its only guidance), showing FY26 was a one-off
Pumps Comp & Eng · expected at least 10%
Kirloskar Oilwait · Standalone margin back above 13% in H2 FY27 (11.2% in Q1)
Pumps Comp & Eng
Kirloskar Oilwait · ₹700cr Kagal expansion (50,000 engines a year) ready by April 2027
Pumps Comp & Eng
Kirloskar Oilwait · Nuclear genset billing started and HyperNext gensets delivered within FY27
Pumps Comp & Eng
Kirloskar Oilwait · International sales above FY26's ₹593cr (standalone) for FY27
Pumps Comp & Eng
Kirloskar Oilwait · First dated step towards separating Arka announced
Pumps Comp & Eng
Kirloskar Pneumaticfollow · FY27 revenue up 20% or more, as guided
Pumps Comp & Eng · expected at least 20%
Kirloskar Pneumaticfollow · FY27 EBITDA margin of 18–20%, as guided
Pumps Comp & Eng · expected at least 18%
KNR Constructionswait · H2 standalone margin reaching 10–12% (underlying Q1 about 5.5%)
Construction
KNR Constructionswait · FY27 revenue of ₹2,200–2,300cr as guided
Construction
KNR Constructionswait · Land acquisition complete
Project milestone · Construction
KPIT Technologiesown · Revenue growth back by Q4, as management now expects
Software
KPIT Technologiesown · Products and solutions growing above 30% a year
Software
KRBLwait · FY27 operating margin of 17–18%, as newly guided
Food Products · expected at least 17%
KRBLwait · Domestic volume up 10% in FY27, as guided
Food Products
Krishana Phoschempass · FY27 revenue growth of 30–35% (softened guide)
Agrochemical & Fertilizers · expected at least 30%
Krishana Phoschempass · New NPK/DAP capacity at full use
Project milestone · Agrochemical & Fertilizers
Krishna Defence & Allied Industriesown · FY27 revenue growth of 30%-plus as guided
Aerospace defence · expected at least 30%
Krishna Inst.Mediwait · FY27 new-unit losses under half of FY26's ₹129cr (guidance)
Hospitals
KRN Heat Exchanwait · Positive operating cash in FY27
Industrials
KRN Heat Exchanwait · FY27 revenue above ₹1,000cr (guidance)
Industrials
KRN Heat Exchanwait · New plant at about 50% use; revenue above ₹1,000cr
Project milestone · Industrials
Krosswait · FY27 revenue grows 22%, as guided
Auto Related · expected at least 22%
Krosswait · Seamless-tube plant commissioned in Q4 FY27
Auto Related
Krosswait · Seamless-tube plant commissioned
Project milestone · Auto Related
Krosswait · Tipping-jack line at 65–70% use
Project milestone · Auto Related
Krystal Integrated Serviceswait · FY27 revenue growth 'upwards of 20%' as guided
Commercial Services · expected at least 20%
KSH Internationalwait · Volume growth of about 26% in FY27
Cables
KSH Internationalwait · Working-capital days falling from 60 toward 30–35
Cables
KSH Internationalwait · Positive operating cash flow in FY27
Cables
KSH Internationalwait · Phase 2 complete, capacity about 59,000 tonnes
Project milestone · Cables
Landmark Carswait · Operating cash about 95% of EBITDA in FY27, as guided
Retail
Landmark Carswait · Profit heading back to the FY23 peak of ₹85cr
Retail
Laser Power & Infrawait · Customer payment days falling from 216
Cables
Latent View Analyticwait · FY27 operating margin within the cut 20–21% target
Software · expected at least 20%
Latent View Analyticwait · FY27 dollar revenue growth of 12%, as guided
Software
Laxmi Dentafollow · FY27 operating cash above ₹30cr (FY26: −₹5cr)
Health Products
Laxmi Dentafollow · FY27 revenue growth of 15–20% (reinstated aim)
Health Products · expected at least 15%
Laxmi Organicpass · Phase 2 ramp-up begins
Project milestone · Chemicals
Le Travenues Technowait · Hotel business contribution turning positive within four to six quarters
Travel Services
Leela Palaces Hotelswait · FY27 operating-profit growth in the mid-to-high teens (guidance, company basis)
Hotels and Travels
Leela Palaces Hotelswait · FY27 RevPAR growth in double digits (guidance)
Hotels and Travels
Leela Palaces Hotelswait · Bandhavgarh opens
Project milestone · Hotels and Travels
Lemon Tree Hotelsown · About 2,000 managed rooms opened in FY27 (334 in Q1)
Hotels and Travels
Lemon Tree Hotelsown · FY27 margin “well better than” 47% (chairman's guidance, company basis)
Hotels and Travels
Lemon Tree Hotelsown · Renovation programme finished
Project milestone · Hotels and Travels
LMWwait · Machine tools grow 15–20% in FY27 on current capacity (guidance)
Industrial Machinery
LMWwait · New aerospace machines producing and lifting aerospace sales
Project milestone · Industrial Machinery
LT Foodsown · Organic-foods margin reaching 7–8% by March 2027 (4% now)
Food Products
LT Foodsown · FY27 margin about 12% on the company's measure, as guided
Food Products
LT Foodsown · Organic (normalised) revenue growth of 10–12% in FY27, as guided
Food Products
Lumax Auto Techfollow · FY27 revenue growth about 20%, as guided
Auto Related · expected at least 20%
Lumax Auto Techfollow · FY27 EBITDA ₹800–850cr (company basis, with other income)
Auto Related
Lumax Auto Techfollow · Mechatronics revenue reaches about ₹400cr in FY27
Auto Related
Lumax Industriesfollow · FY27 operating margin recovers to the 10.5–11% guide
Auto Related · expected at least 10.5%
Lumax Industriesfollow · FY27 revenue grows 15–20%, as guided
Auto Related · expected at least 15%
Lumax Industriesfollow · Bengaluru expansion commissioned
Project milestone · Auto Related
M & B Engineer.wait · FY27 revenue growth over 25% as guided
Construction · expected at least 25%
Macpower CNCfollow · FY27 revenue growth of 30%+ (raised guidance)
Industrial Machinery · expected at least 30%
Madhya Bharat Agro Productspass · FY27 revenue growth of 50–60% as guided
Agrochemical & Fertilizers · expected at least 50%
Madhya Bharat Agro Productspass · Dhule NPK utilisation rising by Q4
Agrochemical & Fertilizers
Mahindra Holi.&Resorwait · Renovated keys returning and profit recovering in H2 FY27 (Q1 consolidated loss ₹8.6cr)
Hotels and Travels
Mahindra Holi.&Resorwait · Decision on the Finland business in FY27
Hotels and Travels
Mahindra Holi.&Resorwait · 1,000-plus gross keys added in FY27 (net keys fell to 5,865)
Hotels and Travels
Mahindra Holi.&Resorwait · About 1,000 gross keys added in FY27
Project milestone · Hotels and Travels
Mahindra Life. Devfollow · FY27 pre-sales of ₹4,500–5,000cr (up 32–47%)
Realty
Mahindra Life. Devfollow · Mahalakshmi and the other H2 launches go ahead (about ₹10,000cr of launches guided)
Realty
Mamata Machinerywait · FY27 revenue up about 15% (guidance)
Industrial Machinery · expected at least 15%
Mamata Machinerywait · FY27 operating margin back to about 20% (guidance; FY26 was 10%)
Industrial Machinery · expected at least 20%
Mamata Machinerywait · Domestic packaging-machine sales grow 30–40% in FY27 (guidance)
Industrial Machinery
Man Industries (I)follow · Jammu stainless plant and Dammam coating plant starting by March 2027
Iron and Steel
Man Industries (I)follow · Jammu plant starts production
Project milestone · Iron and Steel
Man Industries (I)follow · Dammam coating plant starts operations
Project milestone · Iron and Steel
Man Industries (I)follow · Consolidated FY27 revenue of about ₹5,000cr
Project milestone · Iron and Steel
Man Infrawait · Pre-sales towards ₹2,500cr in FY27 as Marine Lines, Tardeo and Mount Mary launch (Q1: ₹290cr)
Construction
Man Infrawait · Marine Lines project launched by March 2027
Construction
Man Infrawait · Ghatkopar project completed by March 2027
Construction
Man Infrawait · Attributable profit growth of more than 25% in FY27 as guided
Construction
Manaksia Coated Metalswait · FY27 revenue of ₹1,300–1,350cr (about +47% on FY26's ₹884cr, guidance)
Iron and Steel · expected at least 47%
Manaksia Coated Metalswait · Second colour-coating line running at 50–60% in H2 FY27
Iron and Steel
Manaksia Coated Metalswait · New line at 50–60% use
Project milestone · Iron and Steel
Manba Financepass · FY27 loan growth of 35–40% at a 13–14% margin, as guided
Finance
Manorama Industrieswait · Related-party purchases from Manorama Africa falling
Food Products
Marathon NextgenRealavoid · The ₹822.9cr of loans to the promoter's holding company repaid or settled in the merger
Realty
Marathon NextgenRealavoid · Operating cash turns positive in FY27
Realty
Marksans Pharmaown · FY27 operating margin at or above the 21–22% guide
Pharma · expected at least 21%
Marksans Pharmaown · FY27 revenue growth within or above the 15–20% guide
Pharma · expected at least 15%
Mastekfollow · The $25M US federal deal ramping up in H2
Software
Mastekfollow · No goodwill write-down on North America (₹1,333cr of goodwill)
Software
Max Estateswait · FY27 collections of ₹2,500–2,700cr, as guided
Realty
Maxvolt Energy Indusavoid · FY27 revenue up 40–50%, as guided (annual report, cut from 50–70%)
EMS & Electronics · expected at least 40%
Maxvolt Energy Indusavoid · 35,000 packs a month running from December 2026–January 2027
EMS & Electronics
Maxvolt Energy Indusavoid · 35,000 packs a month in production
Project milestone · EMS & Electronics
Mayur Uniquotersown · The ~₹50cr Jaipur coating line starting by March 2027
Consumer Durables
Mayur Uniquotersown · FY27 revenue growth of 10–15%, as guided
Consumer Durables · expected at least 10%
Mayur Uniquotersown · New coating line starts production (February–March 2027)
Project milestone · Consumer Durables
Medpluswait · Margin after rent back above 5% by H2 FY27 (3.5% in Q1)
Retail
Medpluswait · 800 net new stores in FY27, as guided
Retail
Medpluswait · About 800 net new stores in FY27
Project milestone · Retail
Meghmani Organicspass · Debt falling by the planned ₹130cr in FY27
Agrochemical & Fertilizers
Meghmani Organicspass · Kilburn merger completed and the ₹666cr carrying value tested (titanium dioxide plant restarted or written off)
Agrochemical & Fertilizers
Menon Bearingswait · Operating cash above 60% of operating profit in FY27
Auto Related
Menon Bearingswait · FY27 revenue at least ₹360cr ('conservative' guidance)
Auto Related
Metro Brandswait · Store openings back near 100 a year (only 9 in Q1)
Consumer Durables
Metro Brandswait · FY27 revenue growth of about 15%, as guided
Consumer Durables · expected at least 15%
Metro Brandswait · FY27 operating margin of about 30%, as guided
Consumer Durables · expected at least 29.5%
Metropolis Health.follow · FY27 revenue growth of 14–15% without acquisitions or price rises (guidance held)
Healthcare Diagnostic · expected at least 14%
Metropolis Health.follow · FY27 margin up 100–150 basis points (guidance)
Healthcare Diagnostic
Minda Corpwait · Operating margin reaches 12% in the second half of FY27
Auto Related · expected at least 12%
Minda Corpwait · Switches JV starts production (by March 2027)
Project milestone · Auto Related
Mishra Dhatu Nigam (MIDHANI)pass · FY27 revenue growth above FY26's 12.5%
Aerospace defence · expected at least 12.5%
Mishra Dhatu Nigam (MIDHANI)pass · Modernisation capex proposal approved and announced
Project milestone · Aerospace defence
MM Forgingsfollow · FY27 revenue of ₹1,800–1,900cr and over 90,000 tonnes (guidance)
Forging
MM Forgingsfollow · 16,500-tonne press starting in Q4 FY27 with named customers
Forging
MM Forgingsfollow · 16,500-tonne press starts production with named customers
Project milestone · Forging
Molbio Diagnosticswait · FY27 revenue growth of about 25% (guidance)
Healthcare · expected at least 25%
Mold-Tek Pack.follow · Volume growth back near 10% in H2 FY27 (Q1: +6% against a 10–13% guide)
Packaging
Mold-Tek Pack.follow · FY27 operating profit up 18–20%, as guided
Packaging
Mold-Tek Pack.follow · Pharma sales of ₹50–55cr in FY27, as guided
Packaging
Mold-Tek Pack.follow · Ophthalmic extension (25,000 sq ft) completed
Project milestone · Packaging
Mrs Bectors Foodwait · A 14% operating margin as the Q4 FY27 exit rate, as guided
Food Products · expected at least 14%
Mrs Bectors Foodwait · FY27 revenue growth in the mid-teens, as guided
Food Products · expected at least 14%
MSTCfollow · A credit-loss policy adopted in the FY27 accounts (after the C&AG comments)
Commercial Services
MTAR Technologiesfollow · Phase 3 hot-box capacity on time by March 2027
Aerospace defence
MTAR Technologiesfollow · FY27 revenue growth of 80% (±5%) as guided
Aerospace defence · expected at least 75%
MTAR Technologiesfollow · Hot-box Phase 3 completed
Project milestone · Aerospace defence
MV Electrosystemswait · 40 sets a month from January
Industrial - Railway
MV Electrosystemswait · FY27 revenue of ₹400cr (guidance; its own delivery plan gives about ₹350–360cr)
Industrial - Railway
MV Electrosystemswait · Output at about 40 sets a month
Project milestone · Industrial - Railway
Natco Pharmawait · FY27 revenue within the trimmed ₹3,300–3,400cr range (Q1 pace was ~₹2,900cr)
Pharma
Natco Pharmawait · FY27 profit about ₹750cr including Adcock, as guided
Pharma
Navin Fluorine Intlfollow · Contract drug manufacturing (CDMO) revenue reaches US$100m in FY27
Chemicals
Navin Fluorine Intlfollow · cGMP4 Phase 2 operational
Project milestone · Chemicals
Navin Fluorine Intlfollow · First phase of advanced-materials capacity complete
Project milestone · Chemicals
NBCCfollow · FY27 profit of ₹1,100–1,200cr as guided (needs about ₹950cr in three quarters)
Construction
NCCfollow · Operating cash turning positive in FY27 (FY26: −₹459cr)
Construction
NCCfollow · FY27 revenue growth of 8–10% as guided
Construction · expected at least 8%
NCCfollow · All smart meters installed; capex phase over
Project milestone · Construction
NDR Auto Componentsfollow · Manesar fabric plant starts (January 2027)
Project milestone · Auto Related
NDR Auto Componentsfollow · Latch and seat-belt-reminder production starts (January 2027)
Project milestone · Auto Related
Neetu Yoshifollow · Operating cash flow catching up with operating profit (FY26: ₹4cr cash on ₹31cr profit)
Forging
Neetu Yoshifollow · FY27 revenue of ₹210–220cr (guidance; I expect ₹150–175cr)
Forging
Neetu Yoshifollow · About ₹60cr of sales from the new plant
Project milestone · Forging
Neetu Yoshifollow · Phase 2 fully used
Project milestone · Forging
Nelcastwait · ₹15 a kilogram of operating profit for FY27 (call guidance)
Forging
Nelcastwait · Three new large-casting programmes at ₹200–250cr a year by Q4 FY27
Forging
Nelcastwait · New large-casting programmes at ₹200–250cr a year run-rate
Project milestone · Forging
Neogen Chemicalspass · Battery revenue of ₹300cr in FY27
Chemicals
Neogen Chemicalspass · US electrolyte-salt shipments at formula prices from early 2027
Chemicals
Neogen Chemicalspass · Base business FY27 revenue of ₹950–1,050cr (raised guide)
Chemicals
Neogen Chemicalspass · Lithium electrolyte salt plant commissioned
Project milestone · Chemicals
Neogen Chemicalspass · Battery revenue of about ₹300cr for FY27
Project milestone · Chemicals
Nephrocare Healthwait · Saudi tender result (now three to four quarters away)
Healthcare
Network People Servicespass · FY27 revenue of ₹320–340cr (60–70% growth), as guided
Software
Neuland Laboratoriesfollow · A fourth commercial molecule of scale this year
Pharma CDMO
Neuland Laboratoriesfollow · FY27 revenue growth about 20%, as guided
Pharma CDMO · expected at least 20%
Newgen Softwareown · Double-digit FY27 revenue growth, as management is 'hopeful' of
Software · expected at least 10%
Nirlonfollow · FY27 dividend at least ₹30 a share (May hint of 'significantly higher dividends' not repeated)
Commercial Services
Nirlonfollow · Any decision on debt prepayment, a REIT, a buyback or Nirlon House redevelopment
Commercial Services
Nocilwait · TDQ plant sales start from Q4 FY27
Chemicals
Nocilwait · FY27 operating margin about 10%
Chemicals · expected at least 10%
Nocilwait · FY27 revenue of ₹1,400–1,600cr with volume up about 10%
Chemicals
Nocilwait · Commercial TDQ sales from the new plant
Project milestone · Chemicals
Northern ARC Capitalfollow · Margin near 10% by March 2027, as guided
Finance
Northern ARC Capitalfollow · FY27 loan growth of 22–23%, as guided
Finance
NRB Bearingfollow · New lines and the Unitec joint venture running by April 2027
Bearings
OBSC Perfectionwait · Positive operating cash in FY27
Auto Related
OBSC Perfectionwait · FY27 revenue grows 40–45%, as guided
Auto Related · expected at least 40%
OBSC Perfectionwait · Exports moving towards 30% of sales
Auto Related
Olectra Greentechwait · FY27 deliveries of 2,000–2,500 buses, as guided
Vehicles
Olectra Greentechwait · Running at 600–700 buses a quarter
Project milestone · Vehicles
Olectra Greentechwait · Own bus platform launched
Project milestone · Vehicles
Olectra Greentechwait · New insulator shed and equipment in place
Project milestone · Vehicles
Omnitech Engineeringwait · FY27 revenue growth of 35–40% (guidance)
Industrials · expected at least 35%
Omnitech Engineeringwait · Positive operating cash in FY27
Industrials
Omnitech Engineeringwait · Firm call-offs under the energy master agreements (₹50cr+ this year)
Industrials
One Mobikwik Systemswait · FY27 profit of ₹40cr and EBITDA of ₹75cr, as targeted
Platform Cos
OnEMI Technologyfollow · Borrowing cost down about a point by March 2027
Finance
OnEMI Technologyfollow · FY27 loan growth above 40%, as guided
Finance
OnEMI Technologyfollow · FY27 credit cost down about 15%, as guided
Finance
Onesource Specialtywait · Line 3 running by the end of FY27
Pharma CDMO
Onesource Specialtywait · Line 3 installed
Project milestone · Pharma CDMO
Orchid Pharmaavoid · 7-ACA commercial production by March 2027
Pharma
Orchid Pharmaavoid · 7-ACA plant commissioned with its first commercial batch
Project milestone · Pharma
Oriana Powerfollow · Batteries make up about 40% of FY27 revenue
Solar PV Cells EPC
Oriana Powerfollow · FY27 revenue grows 40–50%, as guided (cut from earlier promises)
Solar PV Cells EPC · expected at least 40%
Oriana Powerfollow · About 200 MWp more sold
Project milestone · Solar PV Cells EPC
Oriana Powerfollow · Engineering design finished
Project milestone · Solar PV Cells EPC
Orient Bellwait · GVT conversion finished
Project milestone · Consumer Durables
Oriental Aromaticspass · FY27 sales growth of 10–15%
Chemicals · expected at least 10%
OSEL Devicespass · FY27 revenue toward the ₹500cr management calls possible, with ₹50cr of exports
Health Products
Oswal Pumpspass · FY27 revenue up 20–25%, as guided (kept)
Pumps Comp & Eng · expected at least 20%
Oswal Pumpspass · FY27 EBITDA margin of 15–17% (guide cut from 22–23%)
Pumps Comp & Eng · expected at least 15%
Oswal Pumpspass · Aluminium extrusion plant completed
Project milestone · Pumps Comp & Eng
Paramount Communicationspass · Operating margin back to FY25 levels (about 8%) by Q4 FY27
Cables · expected at least 8%
Paramount Communicationspass · FY27 revenue growth of 15–20% as guided
Cables · expected at least 15%
Paramount Communicationspass · Exports running toward ₹700–800cr a year
Cables
Patel Engineeringwait · FY27 revenue growth of 10% as guided
Construction · expected at least 10%
Patil Automationwait · FY27 revenue of ₹260–270cr at 10–11% PAT margin (guidance)
Industrials
PCBL Chemicalwait · FY27 carbon black EBITDA of ₹16,500–17,000 a tonne with high-single-digit volume growth
Chemicals
PG Electroplastpass · Compressor line started in December–January
EMS & Electronics
PG Electroplastpass · FY27 profit back near FY25's ~₹288cr (about ₹71cr of it incentives)
EMS & Electronics
PG Electroplastpass · Refrigerator plant started in Q4 FY27
EMS & Electronics
PG Electroplastpass · Mass production of compressors starts
Project milestone · EMS & Electronics
PG Electroplastpass · Commercial production at Sri City starts
Project milestone · EMS & Electronics
Pine Labswait · FY27 revenue growth within the 21–23.5% guide
Platform Cos · expected at least 21%
Pine Labswait · Contribution margin back to 73–74% in H2 FY27
Platform Cos
Pine Labswait · FY27 adjusted operating margin no lower than 21%, as guided
Platform Cos
Piramal Pharmawait · FY27 margin clearing 16% with net debt below 3 times EBITDA
Pharma CDMO
Pitti Engineeringown · Operating margin moves from 16.8% towards 17.5–18% in H2 FY27
Industrials · expected at least 17.5%
Pitti Engineeringown · FY27 operating profit about ₹370cr (guidance; ₹316cr in FY26)
Industrials
Pitti Engineeringown · FY27 volumes: laminations 82,000t and castings 17,000t (raised targets)
Industrials
Pitti Engineeringown · Direct exports rise quarter on quarter as the new capacity fills
Project milestone · Industrials
Pitti Engineeringown · FY27 volumes: 82,000 tonnes of laminations and about ₹370cr of operating profit
Project milestone · Industrials
PNC Infratechwait · FY27 revenue of about ₹6,000cr at about a 12% margin (guidance predates the ban)
Construction
PNC Infratechwait · Non-NHAI orders replacing highway work (FY27 order guide ₹12,000–15,000cr)
Construction
PNC Infratechwait · Remaining land leased
Project milestone · Construction
Poly Medicurefollow · FY27 group revenue of ₹2,300–2,400cr, up 23–28% (guidance kept)
Health Products · expected at least 23%
Poly Medicurefollow · Palwal plant comes online
Project milestone · Health Products
Pondy Oxides & Chem.wait · Positive operating cash flow for FY27 (negative in FY25 and FY26)
Mining & Metals Recycle
Pondy Oxides & Chem.wait · Phase 1 trial runs
Project milestone · Mining & Metals Recycle
Pondy Oxides & Chem.wait · New copper line held at about 75% use through FY27
Project milestone · Mining & Metals Recycle
Power Mech Proj.own · Margin recovering towards 12% in the second half (guide 12.5% for FY27; Q1 10.8%, company measure)
Construction
Power Mech Proj.own · FY27 revenue of about ₹7,300cr (+21%) as guided
Construction · expected at least 21%
Power Mech Proj.own · FY27 order inflow of ₹12,000cr as guided
Construction
Powericafollow · FY27 revenue grows in double digits, as guided
Pumps Comp & Eng · expected at least 10%
Powericafollow · 50 MW wind farm goes live
Project milestone · Pumps Comp & Eng
Praj Industrieswait · Mangalore yard breaks even in FY27, as promised
Industrials
Premier Explosivespass · FY27 revenue of around ₹600cr at a 15–20% margin
Chemicals
Privi Speciality Chewait · Expansion Phase 1 running full by Q4 FY27
Chemicals
Privi Speciality Chewait · FY27 revenue growth of about 20% at similar margins
Chemicals · expected at least 20%
Privi Speciality Chewait · Phase 1 running full
Project milestone · Chemicals
PSP Projectspass · FY27 revenue of ₹4,400–4,500cr (about 40% growth)
Construction
PSP Projectspass · FY27 order inflow of ₹4,000–5,000cr (eased from ₹5,000–6,000cr)
Construction
Punjab Chem. & Corpwait · FY27 revenue growth of 15–20% as guided
Agrochemical & Fertilizers · expected at least 15%
Punjab Chem. & Corpwait · MoU specialty products scaling from Q4 FY27
Agrochemical & Fertilizers
Punjab Chem. & Corpwait · Lalru block completed
Project milestone · Agrochemical & Fertilizers
Punjab Chem. & Corpwait · Greenfield project work starts
Project milestone · Agrochemical & Fertilizers
Puravankarawait · Zentech sale closes and net debt actually falls (₹700cr debt-cut target)
Realty
Puravankarawait · FY27 pre-sales of ₹11,200cr (Q1 was 13% of target)
Realty
Pyramid Technoplastwait · Plant utilisation back above 70% in H2 FY27 (62% now)
Packaging
Pyramid Technoplastwait · FY27 revenue up about 15% (about ₹780cr), as guided
Packaging · expected at least 15%
Pyramid Technoplastwait · Kutch plant commissioned (March 2027)
Project milestone · Packaging
Pyramid Technoplastwait · Wada at 80% use
Project milestone · Packaging
Q-Line Biotechwait · Unit 4 at 25–30% use
Project milestone · Pharma Others
Quality Power Elwait · FY27 revenue up 20%, as guided
Electrical Transformers · expected at least 20%
Quality Power Elwait · Sangli's first meaningful revenue in Q3–Q4 FY27
Electrical Transformers
Quality Power Elwait · Meaningful revenue from Sangli after customer audits
Project milestone · Electrical Transformers
Quality Power Elwait · Win-Win's first consolidated quarter
Project milestone · Electrical Transformers
Quess Corpfollow · FY27 revenue growth of 12–13% as guided
Commercial Services · expected at least 12%
Quess Corpfollow · Net adds of 30,000-plus for FY27 (target cut from 40,000–50,000)
Commercial Services
RACL Geartechwait · FY27 revenue about ₹570cr (16–17% growth), as guided
Auto Related · expected at least 16%
RACL Geartechwait · New heat-treatment plant running by January 2027
Auto Related
RACL Geartechwait · Trial production (January 2027) and full switch-over by March 2027
Project milestone · Auto Related
RACL Geartechwait · Kawasaki supplies start (January 2027)
Project milestone · Auto Related
Railtel Corporation of Indiafollow · Data-centre revenue near ₹300cr in FY27, and Noida's first 5 MW on time
Software
Railtel Corporation of Indiafollow · Kavach revenue starting in FY27, as management expects
Software
Railtel Corporation of Indiafollow · FY27 revenue growth around 20%, as guided (25% accepted in July)
Software · expected at least 20%
Railtel Corporation of Indiafollow · Data-centre revenue about ₹300cr in FY27
Project milestone · Software
Rainbow Children's Medicarefollow · Nellore 30-bed maternity block opens ('in 6 months')
Project milestone · Hospitals
Rajratan Globalfollow · Positive free cash in FY27 as capex tapers
Auto Related
Rajratan Globalfollow · FY27 volume up 17–18% to about 1.55 lakh tonnes
Auto Related
Rallis Indiafollow · Operating margin moving toward 15%-plus without one-off help
Agrochemical & Fertilizers
Ramkrishna Forgingspass · Net debt towards ₹1,500cr by March 2027
Auto Related
Ramkrishna Forgingspass · Return on capital 12–15% in FY27, as guided
Auto Related
Ramkrishna Forgingspass · About 40,000 wheels supplied in FY27
Project milestone · Auto Related
Ramkrishna Forgingspass · Casting at 85–90% use
Project milestone · Auto Related
Ramkrishna Forgingspass · Press plant at about 85% use
Project milestone · Auto Related
Ramkrishna Forgingspass · Railways at least 10% of standalone FY27 revenue (6% in Q1)
Auto Related
Ramkrishna Forgingspass · Wheel venture in bulk supply, with about 40,000 wheels delivered to the Railways in FY27
Auto Related
Ramkrishna Forgingspass · Exports at least 35% of FY27 revenue
Auto Related
Ramkrishna Forgingspass · First aerospace order in titanium or Inconel announced
Auto Related
Rane (Madras)wait · A double-digit margin in Q3 or Q4 FY27 (company basis)
Auto Related
Rane (Madras)wait · Debt below ₹1,000cr by March 2027 as land money arrives
Auto Related
Rashi Peripheralfollow · FY27 revenue growth of at least 20% (management's floor)
Hardware · expected at least 20%
RateGain Travel Techfollow · FY27 filed (not adjusted) operating margin above 21%, with revenue beating the ~₹3,100cr guide
Software · expected at least 21%
RateGain Travel Techfollow · Net debt below ₹400cr by March 2027
Software
Raymondfollow · Operating cash catching up with operating profit (₹42cr in FY26)
Aerospace defence
Raymondfollow · Aerospace margin moving from 21% towards the 25% target
Aerospace defence
Raymondfollow · Aerospace revenue of at least ₹490cr in FY27 (the 25% commitment)
Aerospace defence
Raymondfollow · Aerospace at least 21% of the two engineering segments' FY27 revenue (19% in FY26)
Aerospace defence
Raymond Realtywait · The two Mahim launches between November 2026 and March 2027
Realty
Raymond Realtywait · FY27 operating margin of 17–19%, as guided (13% in Q1)
Realty · expected at least 17%
Raymond Realtywait · FY27 pre-sales and revenue up at least 20%, as guided
Realty
Redingtonwait · FY27 operating cash back above ₹1,000cr (FY26: ₹231cr)
Commercial Services
Refex Industriesavoid · Wind revenue of about ₹1,700cr at a 5–6% net margin, mostly in H2 FY27
Chemicals
Relaxo Footwearspass · About 100 new stores opened by March 2027
Consumer Durables
Relaxo Footwearspass · FY27 margin at least 1 point above FY26's 13.8% (company basis), as guided
Consumer Durables
Remsons Industrieswait · Stellantis revenue appears in H2 FY27
Auto Related
Remsons Industrieswait · FY27 revenue ₹520–570cr (February guidance)
Auto Related
RHI Magnesitafollow · Coke-oven order signed and in production, and mining (quartzite) savings visible in H2
Elect and Refrac
RHI Magnesitafollow · FY27 margin of 13% as guided
Elect and Refrac
RHI Magnesitafollow · MINPRO facility starts operating
Project milestone · Elect and Refrac
Rico Auto Industriespass · FY27 revenue ₹3,200–3,250cr, as guided
Auto Related
RIR Power Electravoid · ₹12–15cr of wafer sales in H2 FY27 at a 20–25% margin, as guided
Electrical Equipment
RIR Power Electravoid · ₹12–15cr of wafer sales in H2 FY27
Project milestone · Electrical Equipment
Rishabh Instrumentspass · Die-casting at breakeven by the end of FY27, or an exit
Electrical Transformers
Rishabh Instrumentspass · Instruments growing 20–25% at a 20–22% margin in FY27, as guided
Electrical Transformers
Rishabh Instrumentspass · FY27 adjusted EBITDA of ₹150–160cr, as guided
Electrical Transformers
Riteswait · Double-digit revenue growth in FY27 as guided
Construction · expected at least 10%
Riteswait · Bangladesh and Mozambique export deliveries made in the second half
Construction
Rolex Ringsfollow · FY27 revenue growth 'mid-teen', as guided
Auto Related · expected at least 15%
Rolex Ringsfollow · Export auto-component revenue moving towards ₹425–450cr in FY27
Auto Related
Rossari Biotechfollow · FY27 revenue growth of at least 15%
Chemicals · expected at least 15%
Rossell Techsysavoid · Positive operating cash flow
Aerospace defence
Rossell Techsysavoid · FY27 revenue growth of 80–90% as guided
Aerospace defence · expected at least 80%
Rossell Techsysavoid · Leased facility operating
Project milestone · Aerospace defence
Route Mobilewait · Adjusted EBITDA margin moving toward the ~12% guided for the year (9.5% in Q1)
Software
Route Mobilewait · Cash returned through a buyback or special dividend
Software
Royal Orchid Hotelswait · Iconiqa Mumbai profitable before lease accounting in FY27 (about ₹80–85cr of annual revenue)
Hotels and Travels
RR Kabel Ltd.follow · FY27 operating cash recovering from near-zero free cash in FY26
Cables
RR Kabel Ltd.follow · New Waghodia cable lines start
Project milestone · Cables
Rubicon Researchfollow · FY27 operating margin at least 23% (raised guide)
Pharma · expected at least 23%
Rubicon Researchfollow · US tariffs on generics formally ruled out in the April 2027 review
Pharma
Rubicon Researchfollow · Pithampur starts commercial operations
Project milestone · Pharma
Rushil Decorpass · Jumbo laminate use reaches 50–60% for the year
Project milestone · Consumer Durables
Saatvik Greenpass · FY27 revenue of ₹6,000cr at a 12% margin (3.5–4 GW), as guided
Solar PV Cells EPC
Saatvik Greenpass · Odisha cell line passes inspection and runs at about 80% of its 2.4 GW by Q4 FY27
Solar PV Cells EPC
Saatvik Greenpass · About 80% cell utilisation
Project milestone · Solar PV Cells EPC
Sagilityown · FY27 organic constant-currency growth at low double digits, as guided (14.9% in Q1)
Software
Sagilityown · Remaining debt owed to EQT fully repaid within FY27
Software
Sahasra Electronicavoid · FY27 revenue of ₹275–300cr after the merger, as guided
EMS & Electronics
Sahasra Electronicavoid · Chip unit reaching ₹50cr of FY27 revenue at break-even, as guided
EMS & Electronics
Sahasra Electronicavoid · Chip-packaging revenue of ₹50cr in FY27
Project milestone · EMS & Electronics
Sai Life Sciencesfollow · H2 FY27 revenue growth above 18% as the first Bidar block starts
Pharma CDMO
Sai Life Sciencesfollow · First 225 KL Bidar block running
Project milestone · Pharma CDMO
Sai Parenteralspass · Adelaide plant licence inspection by 31 March 2027
Pharma
Sai Parenteralspass · Saicriti built on budget by April 2027
Pharma
Sai Parenteralspass · FY27 revenue about ₹750cr, as guided
Pharma
Sai Parenteralspass · Adelaide plant physically complete
Project milestone · Pharma
Sai Parenteralspass · TGA licence inspection done
Project milestone · Pharma
Sai Silks (Kalamandir)wait · FY27 revenue up 12–15%, as guided (cut)
Retail · expected at least 12%
Salzer Electronicspass · FY27 operating margin of 8–8.5%, as guided (CRISIL's downgrade trigger is 8%)
Electrical Equipment · expected at least 8%
Salzer Electronicspass · Switchgear margin back to 9–9.5% in Q3–Q4 FY27
Electrical Equipment
Salzer Electronicspass · FY27 revenue growth of 23–25%, as guided
Electrical Equipment · expected at least 23%
Sambhv Steel Tubesfollow · Kesda stainless plant: equipment erected and trial output by March 2027 (CRISIL says Q3 FY28)
Iron and Steel
Sambhv Steel Tubesfollow · FY27 revenue growth of 10–15% (guidance)
Iron and Steel · expected at least 10%
Sambhv Steel Tubesfollow · Equipment erected and trial output at Kesda
Project milestone · Iron and Steel
Samhi Hotelsown · FY27 revenue growth of 10–11% (guidance)
Hotels and Travels · expected at least 10%
Sandhar Technologieswait · Sundaram-Clayton and Sanaswadi plants profitable by Q4 FY27
Auto Related
Sandhar Technologieswait · Free cash positive in FY27
Auto Related
Sandhar Technologieswait · FY27 revenue grows 15–16%, as guided
Auto Related · expected at least 15%
Sandhar Technologieswait · FY27 margin up 0.25–0.5 point (company basis), as guided
Auto Related
Sandhar Technologieswait · Sundaram-Clayton plant profitable (slipped from Q3 to Q4 FY27)
Project milestone · Auto Related
Sandhar Technologieswait · Hosur plant fully complete (by March 2027)
Project milestone · Auto Related
Sanghvi Moversfollow · FY27 EBITDA of ₹525–575cr as guided
Commercial Services
Sanghvi Moversfollow · FY27 total income of ₹1,400–1,500cr as guided
Commercial Services
Sanghvi Moversfollow · H2 crane deliveries to Saudi Arabia arrive on time, with utilisation above 80%
Commercial Services
Sanghvi Moversfollow · India wind additions reach 7.5 GW in FY27
Commercial Services
Sanghvi Moversfollow · Remaining ~₹560cr of cranes delivered and deployed, including the Saudi fleet
Project milestone · Commercial Services
Sanofi Indiapass · Partner-sold brands returning to growth in 2027 (grew 2% in the June 2026 quarter)
Pharma
Sansera Engineeringfollow · Aerospace, defence and semiconductor revenue of ₹550–600cr in FY27
Aerospace defence
Sansera Engineeringfollow · FY27 revenue growth in the high teens to 20% (raised guide)
Aerospace defence · expected at least 17%
Sansera Engineeringfollow · Free cash turning positive in FY27
Aerospace defence
Sansera Engineeringfollow · ADS revenue of at least ₹550cr in FY27 (guide ₹550–600cr)
Aerospace defence
Sansera Engineeringfollow · Non-auto at least 20% of FY27 sales (20.8% in Q1)
Aerospace defence
Sansera Engineeringfollow · FY28 ADS guidance of at least ₹800cr, promised around the end of FY27
Aerospace defence
Saregama Indiawait · New-music spending in FY27 stays within the guided ₹300–350cr, the last year of the heavy buying phase
Media and Entertainment
Saregama Indiawait · Bhansali's Love & War released on schedule in Q4 FY27
Media and Entertainment
Saregama Indiawait · Love & War (Bhansali) album released
Project milestone · Media and Entertainment
Sastasundar Venturesavoid · 1 lakh sq ft of new space added
Project milestone · Retail
Scoda Tubeswait · FY27 revenue growth of 25% (about ₹650cr, guidance)
Iron and Steel · expected at least 25%
Scoda Tubeswait · FY27 operating margin of 14–15% (guidance; Q1 12.9%)
Iron and Steel · expected at least 14%
Scoda Tubeswait · Welded pipe output starting in H2 FY27; inventory back toward 160 days
Iron and Steel
Scoda Tubeswait · Welded plant in commercial production, first data-centre orders
Project milestone · Iron and Steel
Scoda Tubeswait · FY27 revenue up about 25% (about ₹650cr)
Project milestone · Iron and Steel
Sedemac Mechatronicswait · Truck controller production starts in H2 FY27
Auto Related
Senores Pharmaceuticwait · Positive free cash flow in FY27 (−₹203cr in each of the last two years)
Pharma CDMO
Senores Pharmaceuticwait · FY27 revenue growth within the 30–40% guide
Pharma CDMO · expected at least 30%
Senores Pharmaceuticwait · FY27 operating margin within the 29–31% guide
Pharma CDMO · expected at least 29%
Sequent Scientificfollow · Animal-health tablet line ready
Project milestone · Pharma Others
Servotech Renewavoid · Battery-storage capacity tripled by March 2027, as planned
Electrical Equipment
Servotech Renewavoid · Battery capacity tripled (doubled by about January)
Project milestone · Electrical Equipment
SG Martwait · FY27 EBITDA near the ₹300cr guide (cut from ₹300–350cr)
Retail
SG Martwait · ₹400–500cr of capex spent in FY27
Project milestone · Retail
Sh. Pushkar Chem.follow · FY27 revenue of ₹1,300–1,400cr (raised guidance)
Chemicals
Sh. Pushkar Chem.follow · Net profit margin of 8.5–9% in FY27
Chemicals
Shadowfax Tech.follow · FY27 revenue growth of 38–40% (raised guidance)
Logistics · expected at least 38%
Shadowfax Tech.follow · Top two customers' share of revenue falling below half (about 64% in FY26)
Logistics
Shadowfax Tech.follow · After-rent margin rising 1–1.2 points a year (company's own measure)
Logistics
Shadowfax Tech.follow · FY27 revenue up 38–40%
Project milestone · Logistics
Shaily Engg. Plasticfollow · FY27 pen volumes above 36 million, as guided
Plastics
Shaily Engg. Plasticfollow · More than 36 million pens delivered in FY27
Project milestone · Plastics
Shaily Engg. Plasticfollow · Both new lines at 65–67 parts a minute (about 40–42 million pens combined)
Project milestone · Plastics
Shaily Engg. Plasticfollow · More than 36 million pens in FY27 and healthcare at least half of FY27 revenue
Plastics
Shaily Engg. Plasticfollow · Semiconductor chip-tray supplies start
Plastics
Sharda Cropchemown · FY27 revenue growth of 10–15% as guided
Agrochemical & Fertilizers · expected at least 10%
Sharda Cropchemown · FY27 volume growth within the cut 5–10% guide
Agrochemical & Fertilizers
Sharda Motorfollow · Two quarters of 12%+ gross-profit growth as ~$34.7M a year of new orders start from Q3 FY27
Auto Related
Sharda Motorfollow · Export starts across Q3–Q4 FY27 do not slip again
Auto Related
Sheela Foampass · FY27 revenue growth above 15%, as guided
Consumer Durables · expected at least 15%
Shilchar Tech.follow · FY27 revenue of ₹800cr kept, with no formal cut to the target
Electrical Transformers
Shilpa Medicarewait · Peptide block commissioned
Project milestone · Pharma API
Shilpa Medicarewait · Oncology block commissioned
Project milestone · Pharma API
Shiprocketwait · ₹210cr of bank borrowing repaid from IPO money in FY27, as the prospectus schedules
Platform Cos
Shoppers Stopwait · Debt-free by March 2027, as promised
Retail
Shoppers Stopwait · A full year of filed (not adjusted) profit in FY27
Retail
Shoppers Stopwait · 9–10 new department stores opened in FY27
Project milestone · Retail
Shree Ganesh Remed.avoid · Commercial production from the new contracts in H2 FY27
Pharma API
Shree Ganesh Remed.avoid · Block 8 at full use (by end of the year)
Project milestone · Pharma API
Shree Refrigrationswait · Working capital down to 325–330 days in FY27 (guidance; about 377 now)
Industrials
Shriram Pistonsfollow · New Takahata plant starts (early 2027)
Project milestone · Auto Related
Shriram Propertieswait · FY27 sales of ₹3,300–3,500cr, as guided
Realty
Shriram Propertieswait · FY27 collections of ₹2,100–2,200cr, as guided
Realty
Shyam Metalicsfollow · FY27 revenue up more than 20–25% (guidance, pared from close to 30%)
Iron and Steel · expected at least 20%
Shyam Metalicsfollow · About ₹2,900cr of FY27 capex spent on schedule (₹575cr in Q1)
Iron and Steel
Signatureglobal Ind.wait · ₹5,000cr of FY27 revenue actually booked, as guided
Realty
Signatureglobal Ind.wait · FY27 pre-sales about ₹10,000cr and collections above ₹5,000cr, as guided
Realty
Signatureglobal Ind.wait · H2 Southern Peripheral Road launches sell 40% at launch
Realty
SKF Indiawait · FY27 revenue growth close to 20% (raised guidance; 18%+ counts as close)
Bearings · expected at least 18%
SKF Indiawait · Haridwar lines starting in Q4 FY27
Bearings
SKF Indiawait · New Haridwar lines start production
Project milestone · Bearings
SKF India (Industrial)wait · Clean margin of 13%-plus once IT separation costs end (about Q4 FY27)
Bearings
SKF India (Industrial)wait · Royalty and trademark fees paid staying near today's level (about 3% of sales), well below the ₹222cr ceiling
Bearings
SKF India (Industrial)wait · Pune plant spending staying under ₹1,000cr
Bearings
SKF India (Industrial)wait · One more tapered roller bearing line added
Project milestone · Bearings
Skipperfollow · The 75,000-tonne expansion running in the second half of FY27, with no third delay
Construction - Power
Skipperfollow · FY27 revenue up about 15%, as guided
Construction - Power · expected at least 15%
Skipperfollow · FY27 profit up about 30%, as guided
Construction - Power
Skipperfollow · Export orders towards the ₹1,100cr target, with delayed shipments resuming
Construction - Power
Smartworks Coworkingwait · FY27 revenue growth of 28–30% as guided
Commercial Services · expected at least 28%
Smartworks Coworkingwait · East Side (Pune) campus opens with pre-fills
Project milestone · Commercial Services
Smartworks Coworkingwait · 12.5–13m sq ft operating
Project milestone · Commercial Services
Smartworks Coworkingwait · East Bridge opens
Project milestone · Commercial Services
SMS Pharmaceuticalspass · FY27 revenue up 15%, as guided (missed two years running)
Pharma API · expected at least 15%
SMS Pharmaceuticalspass · Capex completed
Project milestone · Pharma API
Sobhafollow · Operating margin of 15% or more by Q4 FY27 (3–8% for five quarters; guide 17–20%)
Realty · expected at least 15%
Sobhafollow · FY27 pre-sales above ₹10,500cr (at least +30%)
Realty
Solara Active Pharmawait · Net debt at ₹440cr by March 2027 (₹479cr now)
Pharma API
Solara Active Pharmawait · Base business growing 10% or more in FY27, as guided
Pharma API
Solarworld Energy Sopass · 70–75% of the order book executed in FY27 (about ₹1,900–2,000cr of revenue)
Construction
Solex Energywait · FY27 sales reach the ₹2,600cr guide
Solar PV Cells EPC
Solex Energywait · FY27 net profit margin of 5–6% (guide cut from 6–8%)
Solar PV Cells EPC
Somany Ceramicswait · Added capacity from balancing equipment fully in place
Project milestone · Consumer Durables
Sona BLW Precisionwait · FY27 operating margin inside the 23–25% band
Auto Related · expected at least 23%
South West Pinnaclefollow · FY27 revenue growth at or above the ~20% guide (Q1 +53%)
Oil · expected at least 20%
South West Pinnaclefollow · Debt at its lowest by March 2027, as promised
Oil
SPML Infrapass · Operating cash turning positive in FY27
Construction
SPML Infrapass · FY27 revenue growth of 25%-plus as guided
Construction · expected at least 25%
SPML Infrapass · Battery revenue of ₹200–300cr in Q4 FY27
Construction
SPML Infrapass · NTPC battery order supplied and billed
Project milestone · Construction
Sri Lotuswait · FY27 collections of about ₹1,000cr
Realty
Sri Lotuswait · Sky Plaza, Portofino and Odyssey launch by Q4 FY27
Realty
Sri Lotuswait · FY27 pre-sales of ₹1,800–2,000cr, as guided
Realty
Stallion India Fluorpass · Revenue growth of 30–35% in FY27 (company guide; headline revenue includes other income)
Chemicals
Standard Glassavoid · FY27 revenue of ₹1,450cr including ₹250cr from GScale (guidance)
Industrials
Standard Glassavoid · About ₹250cr of GScale revenue in FY27
Project milestone · Industrials
State Bank of Indiaown · FY27 credit cost within 0.5%, as guided
Finance
Steel Strips Wheelswait · FY27 revenue about ₹6,500cr and EBITDA about ₹650cr (10% margin), as guided
Auto Related · expected at least 10%
Steel Strips Wheelswait · Bhuj plant trials start in Q4 FY27
Auto Related
Steel Strips Wheelswait · Trials finish and plants running (around January 2027)
Project milestone · Auto Related
Steelcastown · FY27 volume growth of 25–30% (raised guidance)
Forging
Steelcastown · FY27 operating margin toward management's 28.5–29% aim
Forging · expected at least 28.5%
Sterling Toolswait · The ₹80cr fastener capex completed on time in FY27
Auto Related
Sterling Toolswait · EV revenue grows 20–30% in FY27, as guided
Auto Related
Sterling Toolswait · New fastener capacity commercialised
Project milestone · Auto Related
Stove Kraftpass · Third IKEA line starts
Project milestone · Consumer Durables
Studds Accessoriesfollow · Operating margin back to 18–20% by Q4 FY27
Auto Related · expected at least 18%
Stylam Industriefollow · New-plant sales of ₹250–300cr in FY27, as guided
Consumer Durables
Styrenix Performancefollow · 50,000-tonne ABS expansion starts by March 2027
Chemicals
Styrenix Performancefollow · 50,000-tonne ABS line starts
Project milestone · Chemicals
Subrospass · Operating cash back above ₹200cr in FY27
Industrials
Subrospass · Plant equipped and ready
Project milestone · Industrials
Sudarshan Chemicalsfollow · FY27 revenue of ₹9,800–10,200cr and EBITDA of about ₹800cr
Chemicals
Sumitomo Chemical Indiawait · FY27 sales growth returning above low single digits
Agrochemical & Fertilizers · expected at least 5%
Sumitomo Chemical Indiawait · Royalties to the parent not spreading beyond the first two or three products
Agrochemical & Fertilizers
Sundram Fastenerswait · Standalone EBITDA margin about 16.5% for FY27, as the CFO expects
Auto Related
Sundram Fastenerswait · Exports grow 15–20% in FY27, as guided
Auto Related
Sunteck Realtyfollow · FY27 collections above ₹1,800cr
Realty
Sunteck Realtyfollow · FY27 pre-sales up 25–30%, as guided (raised)
Realty
Sunteck Realtyfollow · Gross debt stays under India Ratings' ₹1,100–1,200cr peak
Realty
Suprajit Engineeringwait · Double-digit revenue growth in FY27, as guided
Auto Related · expected at least 10%
Suprajit Engineeringwait · Electronics business moved to the larger leased site
Project milestone · Auto Related
Supreme Petrochemwait · ABS line back to 80–90% use
Project milestone · Chemicals
Supreme Powerfollow · The 160 MVA prototype passes its CPRI type test in December–January
Electrical Transformers
Supreme Powerfollow · FY27 revenue of ₹250–300cr, as guided
Electrical Transformers
Supreme Powerfollow · FY27 EBITDA margin of 18–20%, as guided
Electrical Transformers · expected at least 18%
Supreme Powerfollow · 160 MVA prototype passes its CPRI type test (December–January)
Project milestone · Electrical Transformers
Supreme Powerfollow · Tank plant built (promised before March 2027)
Project milestone · Electrical Transformers
Supriya Lifesciencewait · FY27 revenue of about ₹1,000cr, as guided (needs about ₹270cr every quarter)
Pharma API
Supriya Lifesciencewait · Phase 1 groundbreaking
Project milestone · Pharma API
Suraj Estatepass · FY27 pre-sales of about ₹700cr at a 35–37% margin
Realty
Suraksha Diagnosticwait · FY27 revenue growth of 15% (guidance)
Healthcare Diagnostic · expected at least 15%
Synergy Greenpass · FY27 revenue of ₹500cr, up 33% (guidance kept)
Forging · expected at least 33%
Synergy Greenpass · Foundry averages 80% use for FY27
Project milestone · Forging
Synergy Greenpass · Land for the new plant acquired
Project milestone · Forging
Syngene Internationalwait · H2 FY27 margin reaching 27–30% (CRISIL's trigger is 25%)
Healthcare
Syngene Internationalwait · Bayview operational
Project milestone · Healthcare
Syrma SGS Tech.follow · FY27 revenue up 30–35%, as guided ('should exceed')
EMS & Electronics · expected at least 30%
Syrma SGS Tech.follow · Circuit-board plant powered on in January–March 2027
EMS & Electronics
Syrma SGS Tech.follow · Equipment powered on
Project milestone · EMS & Electronics
TAC Security (Tac Infosec)avoid · A clean FY27 secretarial audit with no further Companies Act breaches
Software
TAC Security (Tac Infosec)avoid · Move to the main board with a larger auditor; about ₹100cr of FY27 total income, as guided
Software
Talbros Auto Compontown · Sales to QH Talbros stay within the approved ₹125cr in FY27
Auto Related
Tanfac Industrieswait · R-32 plant at full output by mid-February 2027 and running at 65–70% in Q4 FY27
Chemicals
Tanfac Industrieswait · FY27 revenue growth of at least 30%
Chemicals · expected at least 30%
Tanfac Industrieswait · R-32 running at 65–70% use
Project milestone · Chemicals
Tarsons Productspass · Net debt cut by ₹40–50cr in FY27, toward below ₹300cr
Health Products
Tarsons Productspass · FY27 revenue growth of 15% or more (guidance)
Health Products · expected at least 15%
Tata Chemicalswait · UK business EBITDA-positive
Chemicals
Tata Chemicalswait · Mithapur salt plant operational
Project milestone · Chemicals
Tata Technologieswait · Tenneco ($100m deal) and the Japanese full-vehicle programme ramping in H2, with H2 above H1
Software
Tata Technologieswait · 'Strong double-digit' FY27 revenue growth, as guided
Software
Tatva Chintanwait · FY27 revenue growth of 25–30%
Chemicals · expected at least 25%
Tatva Chintanwait · Operating cash above 60% of operating profit in FY27
Chemicals
Tatva Chintanwait · Largest customer's share falling below 35% of revenue
Chemicals
TBO Tekwait · Cash conversion above 100% by FY27-end, as guided
Platform Cos
TCPL Packagingfollow · The fourth flexible line running by February 2027
Packaging
TCPL Packagingfollow · New flexible line commissioned (by February 2027)
Project milestone · Packaging
TD Power Systemsfollow · FY27 revenue of about ₹2,600cr, as guided (raised from ₹2,400cr-plus)
Electrical Equipment
TD Power Systemsfollow · Capacity for about ₹3,200cr of yearly sales in place for FY28
Project milestone · Electrical Equipment
TeamLease Servicesfollow · General staffing margin rising in Q3–Q4 FY27 as promised
Commercial Services
TeamLease Servicesfollow · Specialised staffing margins back to 8–9%
Commercial Services
TeamLease Servicesfollow · General-staffing headcount positive for FY27
Commercial Services
Techno Electric &Engwait · FY27 revenue of ₹4,000cr or more, as guided
Construction - Power
Techno Electric &Engwait · FY27 operating margin of 13–14%, as guided
Construction - Power · expected at least 13%
Techno Electric &Engwait · Noida data centre commissioned
Project milestone · Construction - Power
Tega Industrieswait · Consumables grow 15% in FY27 without spill-over help (missed FY24–FY26)
Industrials
Tega Industrieswait · Chile liner plant starts on time in March 2027
Industrials
Tega Industrieswait · Chile plant soft commissioning
Project milestone · Industrials
Tega Industrieswait · Chile plant commercial production
Project milestone · Industrials
Tempsens Instrumentswait · Margin recovery in H2 FY27, as promised (slipped to 20%)
Industrials
Tempsens Instrumentswait · FY27 revenue growth of about 25% (guidance)
Industrials · expected at least 25%
Tempsens Instrumentswait · Joint-venture plant starts production
Project milestone · Industrials
Tenneco Clean Airfollow · New plants start on time within ₹350–450cr of FY27 capex
Auto Related
Tenneco Clean Airfollow · Double-digit revenue growth in FY27, as guided
Auto Related
The Anup Engineewait · FY27 revenue growth of 5–10% (guidance)
Industrials · expected at least 5%
The Anup Engineewait · FY27 revenue up 5–10% at about a 15% margin, with most deliveries in H2
Project milestone · Industrials
Thomas Cook Indiawait · Sterling demerger approved by the NCLT, on track to complete by Q1 FY28
Travel Services
Thyrocare Technologieswait · FY27 revenue growth in the mid- to high teens (guidance)
Healthcare Diagnostic · expected at least 15%
TILpass · Clean FY27 audit opinion (FY26 qualified over ₹107cr of tax assets)
Vehicles
TILpass · FY27 turnover up 27–28%, as guided
Vehicles
TILpass · No further deals with Gainwell-group companies or calls for equity
Vehicles
Time Technoplastown · Working capital falling to about 100 days by March 2027, as guided
Plastics
Time Technoplastown · FY27 volume growth of 15% (11% in Q1)
Plastics
Time Technoplastown · FY27 net profit growth of 23–24% and operating profit growth of 19–20% (raised guide)
Plastics
Time Technoplastown · Silvassa phase 2 complete, IBC capacity 300,000 a year
Project milestone · Plastics
Time Technoplastown · Sanand, Cuttack, Chiplun and Dammam plants completed
Project milestone · Plastics
Time Technoplastown · Composite products (LPG and CNG) above ₹750cr of FY27 revenue
Project milestone · Plastics
Time Technoplastown · Composite products up at least 25% in FY27 (to about ₹950cr)
Plastics
Time Technoplastown · Value-added products back to 29% or more of FY27 revenue
Plastics
Time Technoplastown · Silvassa IBC phase 2 complete at 300,000 a year
Plastics
Time Technoplastown · First sizeable fire-extinguisher orders from oil companies
Plastics
Tinna Rubberfollow · FY27 revenue of ₹670–700cr (24–29% growth on FY26's ₹542cr), as guided
Rubber · expected at least 24%
Tinna Rubberfollow · Carbon-black sales start by Q4 FY27
Rubber
Tinna Rubberfollow · Free cash flow turns positive in FY27 after three negative years
Rubber
Tinna Rubberfollow · Recovered carbon black sales begin
Project milestone · Rubber
Tinna Rubberfollow · Crushing capacity reaches 235,000 tonnes a year
Project milestone · Rubber
Tips Musicwait · Full-year FY27 operating margin holds at 65–70% despite the bigger content budget (₹90–100cr)
Media and Entertainment · expected at least 65%
Tips Musicwait · FY27 revenue grows about 20%, as guided
Media and Entertainment · expected at least 20%
Tips Musicwait · FY27 net profit up about 20%, as guided (Q1 was −4% on album expensing)
Media and Entertainment
Titagarh Railsystemswait · First Vande Bharat sleeper train by end-Q3 or Q4 FY27
Industrial - Railway
Titagarh Railsystemswait · About 200 coaches in FY27 (±10%, guidance)
Industrial - Railway
Titagarh Railsystemswait · Coach output at 45–50 a quarter (about 200 in FY27)
Project milestone · Industrial - Railway
Titagarh Railsystemswait · First Vande Bharat train delivered
Project milestone · Industrial - Railway
Titagarh Railsystemswait · At least 180 passenger coaches dispatched in FY27 (target ~200, ±10%)
Industrial - Railway
Titagarh Railsystemswait · First Vande Bharat sleeper train delivered to the Railways
Industrial - Railway
Titagarh Railsystemswait · Passenger trains at least a third of FY27 revenue (31% in Q1)
Industrial - Railway
Transformers & Rectwait · FY27 revenue up 25%, as guided (cut from 35–40%)
Electrical Transformers · expected at least 25%
Transformers & Rectwait · Bushings plant commissioned
Project milestone · Electrical Transformers
Transrail Lightingfollow · FY27 revenue up about 20%, as guided (second half must catch up after Q1's +5%)
Construction - Power · expected at least 20%
Transrail Lightingfollow · FY27 order wins of ₹10,000cr or more, as guided
Construction - Power
Triveni Turbinewait · Margin back above 20% (before tax, as now guided) in H2 FY27, after Q1's 12% operating margin
Electrical Equipment
Triveni Turbinewait · US subsidiary breaks even in FY27, as now guided
Electrical Equipment
TruAlt Bioenergywait · FY27 ethanol volume of 44 crore litres, as guided in July (court-ordered 15 crore litres on top)
Oil
TruAlt Bioenergywait · Operating cash turns positive in FY27 (FY26: −₹296cr)
Oil
TruAlt Bioenergywait · First revenue from the three plants
Project milestone · Oil
TruAlt Bioenergywait · Six GAIL biogas plants commissioned
Project milestone · Oil
TruAlt Bioenergywait · About 44 crore litres of ethanol sold in FY27
Project milestone · Oil
Turtlemint Fintechpass · FY27 adjusted EBITDA at or above breakeven, with profit in the second half (management "will try really hard"; my estimate is a ₹20–30cr loss)
Platform Cos
TVS Supply Chain Solwait · Supply-chain segment margin at 9.5–10% by Q4 FY27
Logistics
TVS Supply Chain Solwait · FY27 revenue growth in the mid-teens (raised guidance)
Logistics · expected at least 14%
Unicomm. eSolutionswait · Uniware growth reaching 15%+ by Q4 (12.8% in Q1)
Software
Unicomm. eSolutionswait · Group company-adjusted margin back above 20% in H2
Software
Unimech Aerospacewait · Utilisation above 70% (from 58%)
Aerospace defence
Unimech Aerospacewait · FY27 margin of 34–35% as guided (raised)
Aerospace defence · expected at least 34%
Unimech Aerospacewait · Saudi joint-venture capex done (gross block about double)
Project milestone · Aerospace defence
Uniparts Indiaown · FY27 revenue growth a couple of points above FY26's 21%
Auto Related · expected at least 23%
Uniparts Indiaown · Large-tractor orders start to turn in CY2027, as management expects
Auto Related
V-Guard Industrifollow · FY27 revenue growth above 15%, as guided
Consumer Durables · expected at least 15%
V-Guard Industrifollow · FY27 operating margin of 9–10%, as guided
Consumer Durables · expected at least 9%
V-Guard Industrifollow · Hyderabad fan factory starts up (promised during FY27)
Project milestone · Consumer Durables
V-Guard Industrifollow · Bigger battery plant starts up (promised during FY27)
Project milestone · Consumer Durables
V-Mart Retailfollow · 90+ gross store openings, mostly in H2
Retail
V-Mart Retailfollow · 90+ new stores opened in FY27
Project milestone · Retail
V2 Retailown · Operating cash turns positive in FY27, as promised (−₹103cr in FY26)
Retail
V2 Retailown · FY27 revenue up 50% or more, as guided
Retail · expected at least 50%
V2 Retailown · 170–200 new stores opened in FY27
Project milestone · Retail
Va Tech Wabagfollow · FY27 revenue growth of 15–20%, as guided
Utilities · expected at least 15%
Va Tech Wabagfollow · Receivables and retention money stop outgrowing revenue; disputed tax claims (₹228cr) stop rising
Utilities
Varroc Engineeringwait · Romania operations at EBITDA breakeven by Q4 FY27, as committed
Auto Related
Varroc Engineeringwait · India business margin back above 11% in the second half of FY27
Auto Related
Varroc Engineeringwait · FY27 revenue grows 20–25% (management's 'ambition')
Auto Related · expected at least 20%
Vedant Fashions (Manyavar)wait · Net new store area positive for FY27
Retail
Ventive Hospitalitywait · Pune solar plant starting in Q4 FY27
Hotels and Travels
Ventive Hospitalitywait · Pune solar plant commissioned
Project milestone · Hotels and Travels
Venus Pipes & Tubeswait · FY27 revenue growth of 20% (guidance; Q1 +16%)
Iron and Steel · expected at least 20%
Venus Pipes & Tubeswait · Letter of intent turns into firm spool orders and revenue
Project milestone · Iron and Steel
Venus Pipes & Tubeswait · FY27 revenue up about 20%
Project milestone · Iron and Steel
Viceroy Hotelswait · FY27 margin above 30% (promise; Q1: 26%)
Hotels and Travels
Viceroy Hotelswait · Construction starts after Telangana approvals
Project milestone · Hotels and Travels
Vijaya Diagnostic Centrewait · All nine FY27 hubs commissioned
Project milestone · Healthcare Diagnostic
Vikram Solarpass · First cells from the 9 GW plant around December 2026–January 2027
Solar PV Cells EPC
Vikram Solarpass · Net debt stays within India Ratings' ceiling of 3 times operating profit
Solar PV Cells EPC
Vikram Solarpass · First cells out (December 2026–January 2027)
Project milestone · Solar PV Cells EPC
Vikram Solarpass · Battery-assembly plant in commercial operation (installed January 2027)
Project milestone · Solar PV Cells EPC
Vilas Transcorepass · FY27 revenue of about ₹680cr (cut guidance)
Industrials
Vilas Transcorepass · About ₹80cr of copper-conductor sales
Project milestone · Industrials
Vilas Transcorepass · FY27 revenue of about ₹680cr (cut from ₹750–800cr)
Project milestone · Industrials
Vintage Coffeewait · Positive operating cash for FY27, as promised
Food Products
Vintage Coffeewait · FY27 revenue of ₹850–900cr, as guided
Food Products
Vintage Coffeewait · FY27 operating margin about 20%, as guided
Food Products · expected at least 19%
Vinyas Innovativwait · FY27 revenue growth of 25–30%, as guided
EMS & Electronics · expected at least 25%
Virtuoso Optoelectroavoid · FY27 revenue up 35–40%, as guided
EMS & Electronics · expected at least 35%
Virtuoso Optoelectroavoid · Commercial production on the 6 million-unit capacity
Project milestone · EMS & Electronics
Virtuoso Optoelectroavoid · Full 1.8 million-unit AC capacity live before the next season
Project milestone · EMS & Electronics
Vishnu Chemicalsfollow · Gross margin rising from 44–45% towards 50% by the end of FY27 on captive ore
Chemicals
Vishnu Chemicalsfollow · Barium revenue up 15–20% in FY27
Chemicals
Voltamp Transformerswait · The new 6,000 MVA plant (due October 2026) delivering its first half-year of revenue
Electrical Transformers
Voltaswait · Projects orders and revenue recovering in H2 FY27
Consumer Durables
VST Tillers Tractorswait · A plan for the ₹678cr of net cash and the Bangalore land
Vehicles
Waaree Renewablesfollow · Receivables and sales to group companies shrink (standalone receivables ₹1,171.5cr at March 2026)
Solar PV Cells EPC
Waaree Renewablesfollow · Own plants commissioned and capitalised
Project milestone · Solar PV Cells EPC
Wakefit Innovationswait · Margin after rent above 8% through the second half
Consumer Durables
Wakefit Innovationswait · About 80 stores opened in FY27
Consumer Durables
Wakefit Innovationswait · FY27 revenue growth of about 20%, as aimed
Consumer Durables · expected at least 20%
Websol Energy System Ltdwait · TOPCon upgrade completed by March 2027
Solar PV Cells EPC
Websol Energy System Ltdwait · Upgraded line starts commercial production
Project milestone · Solar PV Cells EPC
Welspun Enterpfollow · FY27 revenue growth 'closer to 15%' as guided
Construction · expected at least 15%
WeWork Indiawait · Promoter pledge released during FY27 without a big block sale
Commercial Services
WeWork Indiawait · FY27 revenue growth above 20% as guided
Commercial Services · expected at least 20%
WeWork Indiawait · About 10.3m sq ft and 1.55 lakh desks operating
Project milestone · Commercial Services
Wheels Indiawait · EBITDA margin above 9% by H2 FY27
Auto Related · expected at least 9%
Xtranet Technologiespass · FY27 revenue growth of 35–40% ('500 plus crores'), as guided
Software · expected at least 35%
Xtranet Technologiespass · A clean first annual report as a listed company
Software
Yash Highvoltagefollow · Its own RIP bushing cores pass type tests from October–November 2026
Electrical Transformers
Yash Highvoltagefollow · FY27 EBITDA margin of 24–25%, as guided
Electrical Transformers · expected at least 24%
Yash Highvoltagefollow · Own RIP cores pass type tests and commercial production starts (October–November 2026)
Project milestone · Electrical Transformers
Yatharth Hospitalfollow · FY27 revenue growth above FY26's 36% (promise)
Hospitals · expected at least 36%
Yatharth Hospitalfollow · New Delhi (Model Town) hospital breaks even
Project milestone · Hospitals
Yatra Onlinepass · Adjusted EBITDA near 20% of gross margin in H2 FY27, as guided
Travel Services
Zaggle Prepaidwait · Operating cash flow positive by H2
Software
Zelio E-Mobilitywait · FY27 volumes of more than 1.25 lakh units (from 70,000+)
Vehicles
Zelio E-Mobilitywait · Over 1.25 lakh units sold in FY27
Project milestone · Vehicles
Zelio E-Mobilitywait · Over 2,000 three-wheelers sold in FY27
Project milestone · Vehicles
Zen Technologieswait · Order book reaching ₹2,500cr by March 2027
Aerospace defence · expected at least ₹2,500cr
Zen Technologieswait · Working capital back under 200 days (257 now)
Aerospace defence
Zensar Technologiesown · The $210M bank deal at full speed from Q3 and margins back to 15–16% by Q4
Software
Zensar Technologiesown · Any acquisition ($150–200M revenue target) bought at a sensible price
Software
Zota Health Carepass · Marketing spend within ₹40–45cr for FY27
Pharma Others
Zydus Lifesciencesfollow · Saroglitazar US approval under priority review on time for an April 2027 launch
Pharma
Zydus Wellnesspass · Non-summer brands growing at double digits in FY27, as guided
Food Products
Zydus Wellnesspass · Debt (₹3,203cr) paid down without a goodwill write-down
Food Products
Q1 FY28
66 pendingPending (66)
20 Micronsown · Malaysian plant starts (early FY28)
Project milestone · Mining & Metals Recycle
Acutaas Chemicalsfollow · First revenue from the Korean plant
Project milestone · Pharma API
Aegis Vopak Terminalswait · Kochi 49,577 cbm expansion commissioned (early FY28)
Project milestone · Oil
Amara Raja Energyfollow · Giga-1 starts production (June 2027)
Project milestone · Auto Related
Amber Enterprisesavoid · Commercial phone production starts
Project milestone · EMS & Electronics
Apcotex Indsown · New NBR capacity on stream (about April 2027)
Project milestone · Rubber
Apcotex Indsown · Synthetic latex capacity starts (about June 2027)
Project milestone · Rubber
Ather Energywait · AURIC phase 1 at full speed (42,000 a month)
Project milestone · Vehicles
Bikaji Foodswait · Local production starts in Nepal
Project milestone · Food Products
BLS Internationalown · Aadhaar revenue at full run-rate
Project milestone · Travel Services
Borosil Renewablesfollow · Revenue from the new furnaces starts showing
Project milestone · Industrials
Chalet Hotelsfollow · Remaining rooms launched
Project milestone · Hotels and Travels
Chambal Fert & Chemfollow · Moroccan venture reaches 7 lakh tonnes of P2O5 capacity
Project milestone · Agrochemical & Fertilizers
Clean Sciencewait · First PC2 revenue
Project milestone · Chemicals
Deep Industriesown · New wells adding gas output at the Rajahmundry field
Project milestone · Oil
Eveready Industries Indiawait · Over 100 million cells made in the first year of production
Project milestone · Consumer Durables
Godavari Powerfollow · BESS factory commissioned
Project milestone · Mining & Metals Recycle
Godavari Powerfollow · Ari Dongri mine at full scale
Project milestone · Mining & Metals Recycle
H.G. Infra Engg.wait · All three battery projects running (by June 2027)
Project milestone · Construction
Happy Forgingswait · Solar plant running with partial power savings
Project milestone · Forging
HEGwait · Anode plant starts commercial production
Project milestone · Elect and Refrac
Insecticides (India)wait · Sotanala formulation production starts
Project milestone · Agrochemical & Fertilizers
Insolation Energypass · Whole plant ramped up
Project milestone · Solar PV Cells EPC
Kajaria Ceramicsfollow · Gailpur line running (March–April 2027)
Project milestone · Consumer Durables
Kajaria Ceramicsfollow · Srikalahasti line running (March–April 2027)
Project milestone · Consumer Durables
Kanpur Plastipackwait · Bulk bags at 5,000 tonnes a quarter
Project milestone · Packaging
Kiri Industriesavoid · Copper tube plant starting by June 2027
Chemicals
Kiri Industriesavoid · Copper tube plant commissioned
Project milestone · Chemicals
Kirloskar Oilwait · 50,000-engine expansion at Kagal comes online (April 2027)
Project milestone · Pumps Comp & Eng
Kirloskar Oilwait · ₹700cr Kagal phase (+50,000 engines a year) running by April 2027
Pumps Comp & Eng
KNR Constructionswait · Mine work starts
Project milestone · Construction
M & B Engineer.wait · Heavy structural line running
Project milestone · Construction
Minda Corpwait · Sunroof JV starts production (Q4 FY27 or Q1 FY28)
Project milestone · Auto Related
NRB Bearingfollow · Unitec joint-venture plant commissioned
Project milestone · Bearings
Onesource Specialtywait · New freeze-drying and syringe capacity running
Project milestone · Pharma CDMO
OSEL Devicespass · JNPA hub starts commercial operations (April 2027)
Project milestone · Health Products
Paramount Communicationspass · Narmadapuram partly starts operations
Project milestone · Cables
Poly Medicurefollow · Noida plant operational and selling commercially
Project milestone · Health Products
Precision Camshaftspass · New programmes ramp up sharply ('big jump' from April 2027)
Project milestone · Auto Related
Privi Speciality Chewait · Phase 2 mechanical completion
Project milestone · Chemicals
Railtel Corporation of Indiafollow · Noida data centre commissioned
Project milestone · Software
Rainbow Children's Medicarefollow · Malad hospital opens
Project milestone · Hospitals
Raymondfollow · First revenue from the Tejas structural-assembly order
Aerospace defence
Sai Parenteralspass · Phase 1 manufacturing starts
Project milestone · Pharma
Sai Parenteralspass · Saicriti plant complete
Project milestone · Pharma
Samhi Hotelsown · Construction starts (from about April 2027)
Project milestone · Hotels and Travels
Shilchar Tech.follow · Phase 3 plant starts production (April 2027)
Project milestone · Electrical Transformers
Sigachi Industriespass · CCS plant in commercial production
Project milestone · Pharma Others
Solarworld Energy Sopass · Original 1.2 GW cell plant in commercial operation (target before the change)
Project milestone · Construction
Standard Glassavoid · First phase (50%) operational
Project milestone · Industrials
Steel Strips Wheelswait · At least 70–80% use of the Bhuj plants
Project milestone · Auto Related
Sudeep Pharmawait · Battery plant Phase 1 commissioned
Project milestone · Pharma Others
Supreme Petrochemwait · XPS and compounding capacity on stream
Project milestone · Chemicals
Syrma SGS Tech.follow · Commercial production starts
Project milestone · EMS & Electronics
Tempsens Instrumentswait · Unit 6 heater plant completed
Project milestone · Industrials
Titagarh Railsystemswait · Phase 2 starts, taking capacity to 228,000 wheels
Project milestone · Industrial - Railway
Titagarh Railsystemswait · Aluminium coach line fully commissioned
Project milestone · Industrial - Railway
Transformers & Rectwait · Fabrication plant commissioned
Project milestone · Electrical Transformers
TruAlt Bioenergywait · First revenue from the GAIL plants
Project milestone · Oil
Vintage Coffeewait · Trial production
Project milestone · Food Products
Wockhardtwait · Zaynich US hospital formulary wins and prescriptions by mid-2027
Pharma
Yasho Industrieswait · Multinational-contract plant starting in Q1 FY28
Chemicals
Yasho Industrieswait · Phase 1 building producing
Project milestone · Chemicals
Yasho Industrieswait · Commercial supply under the contract begins
Project milestone · Chemicals
Yatharth Hospitalfollow · Gurugram hospital goes live
Project milestone · Hospitals
Zota Health Carepass · Cash breakeven by Q4 FY27–Q1 FY28 without a new share issue
Pharma Others
Q2 FY28
41 pendingPending (41)
Aether Industriespass · New R&D site commissioned
Project milestone · Pharma CDMO
Amara Raja Energyfollow · First commercial cell sales from Giga-1
Project milestone · Auto Related
Amara Raja Energyfollow · About 5 GWh of use within 6 months of completion
Project milestone · Auto Related
Amara Raja Energyfollow · Giga-1 cell line in commercial production by September 2027
Auto Related
Awfis Space Solutionsfollow · A couple of the premium buildings go live
Project milestone · Commercial Services
CIE Automotiveown · Robotised stamping line running (mid-2027)
Project milestone · Auto Related
Control Printwait · Packaging business breaks even
Project milestone · Hardware
Cosmic CRFwait · First production at Amzen
Project milestone · Industrial - Railway
Garware Hi-Techfollow · Sun-control line starts commercial production (H1 FY28)
Project milestone · Plastics
Garware Hi-Techfollow · New sun-control line in commercial production
Plastics
GNFCfollow · Ammonia, nitric acid and ammonium nitrate plants commercial
Project milestone · Chemicals
Gravita Indiaown · Mandvi copper plant commissioned (within 12 months of Aug 2026)
Project milestone · Mining & Metals Recycle
Greenply Industrieswait · MDF Line 2 starts production
Project milestone · Consumer Durables
HBL Engineeringfollow · Truck drive train certified by March 2027 and first pilot sales by September 2027
Industrials
Hexagon Nutritionfollow · Nashik premix plant rebuild complete
Project milestone · Pharma Others
Himadri Specialityfollow · Balance 2,700 tonnes added (full 5,300 tonnes)
Project milestone · Chemicals
Indiqube Spaceswait · Noida campus goes live
Project milestone · Commercial Services
Interarch Buildingwait · Joist plant starts (about July 2027)
Project milestone · Construction
Kaynes Technologywait · The PCB customer named or a second large board customer signed
EMS & Electronics
KRN Heat Exchanwait · Bangalore plant starts production
Project milestone · Industrials
Macpower CNCfollow · New assembly facility complete and in use
Project milestone · Industrial Machinery
Max Estateswait · Occupancy certificate for Phase 1 of the new offices
Project milestone · Realty
Nocilwait · Specialty plant completed
Project milestone · Chemicals
Orchid Pharmaavoid · Indian approval for cefiderocol
Project milestone · Pharma
Paradeep Phosphateswait · Phosphoric acid capacity reaches 0.7 million tonnes
Project milestone · Agrochemical & Fertilizers
Pricolfollow · New plastics capacity running ('next 9 to 12 months to mature')
Project milestone · Auto Related
Privi Speciality Chewait · Capacity at about 66,000 tonnes
Project milestone · Chemicals
Refex Industriesavoid · About 85% of turbine components made locally
Project milestone · Chemicals
Scoda Tubeswait · Welded capacity at 21,150 tonnes
Project milestone · Iron and Steel
Shakti Pumpspass · 2.2 GW cell and module plant starts (September 2027)
Project milestone · Pumps Comp & Eng
Sigachi Industriespass · Dahej-2 MCC plant commissioned
Project milestone · Pharma Others
SJS Enterprisesfollow · First sales from the Hosur display plant
Project milestone · Auto Related
SMS Pharmaceuticalspass · New ibuprofen block in commercial output (July 2027)
Project milestone · Pharma API
SPML Infrapass · 5 GWh line and container expansion complete
Project milestone · Construction
Studds Accessoriesfollow · Phase 2 construction started (FY28 capex of ₹31cr)
Project milestone · Auto Related
Tempsens Instrumentswait · Unit 8 cable plant completed
Project milestone · Industrials
Titagarh Railsystemswait · Railways' large wagon tender awarded and wagon output back above 800 a month
Industrial - Railway
Vikram Solarpass · Cell production ramp-up
Project milestone · Solar PV Cells EPC
Vintage Coffeewait · Freeze-dried plant completed and producing
Project milestone · Food Products
Wakefit Innovationswait · First Jumbo store opens (by mid-2027)
Project milestone · Consumer Durables
Wockhardtwait · Biosimilar capacity doubled
Project milestone · Pharma
Q3 FY28
37 pendingPending (37)
Aarti Industriespass · Backward-integration plant commissioned
Project milestone · Chemicals
AGI Greenpacwait · Phase 1 (950 million cans) running
Project milestone · Packaging
Amara Raja Energyfollow · Storage plant running at about a 5 GWh yearly rate within seven months of start
Auto Related
Amber Enterprisesavoid · Trial production starts at Jewar
Project milestone · EMS & Electronics
BASF Indiapass · Dispersion Line 3 commissioned
Project milestone · Chemicals
Godavari Powerfollow · Mill commissioned (December 2027)
Project milestone · Mining & Metals Recycle
Happy Forgingswait · First sales of heavy data-centre engine parts
Forging
Harsha Engineers Intown · China expansion commissioned
Project milestone · Bearings
HBL Engineeringfollow · Army approval for grenade fuzes and approval of 155 mm artillery fuzes announced
Industrials
Insecticides (India)wait · Sotanala technicals production starts
Project milestone · Agrochemical & Fertilizers
Interarch Buildingwait · Phase 3 complete, 75,000–80,000 tonnes
Project milestone · Construction
IOL Chem & Pharmafollow · New ibuprofen capacity starts (December 2027)
Project milestone · Pharma API
Jash Engineeringfollow · Houston plant ready
Project milestone · Industrials
Jash Engineeringfollow · Saudi plant ready
Project milestone · Industrials
JK Tyre & Industwait · ₹1,130cr truck and car lines producing
Project milestone · Tyres
JTEKT Indiapass · New lines fully used (within 18 months of May 2026)
Project milestone · Auto Related
Knack Packagingfollow · Kadi plant commissioned (October 2027)
Project milestone · Packaging
Krishna Inst.Mediwait · Gachibowli expansion complete
Project milestone · Hospitals
Leela Palaces Hotelswait · Srinagar opens (calendar 2027)
Project milestone · Hotels and Travels
M & B Engineer.wait · Cheyyar expansion complete
Project milestone · Construction
Madhya Bharat Agro Productspass · Dhule final phase commissioned
Project milestone · Agrochemical & Fertilizers
Manorama Industrieswait · Plant 3 and the refinery commissioned
Project milestone · Food Products
Manorama Industrieswait · Burkina Faso plant commissioned
Project milestone · Food Products
Minda Corpwait · Pune die-casting plant starts (about 18 months from May 2026)
Project milestone · Auto Related
Omnitech Engineeringwait · Both new Chhapara plants operational
Project milestone · Industrials
Piramal Pharmawait · Lexington expansion complete
Project milestone · Pharma CDMO
Pondy Oxides & Chem.wait · Phase 2 (another 18,000 tonnes) commissioned
Project milestone · Mining & Metals Recycle
RACL Geartechwait · ZF steering supplies start (late 2027)
Project milestone · Auto Related
Rainbow Children's Medicarefollow · Coimbatore and Gurugram Sector 56 hospitals open
Project milestone · Hospitals
Raymondfollow · Gudipalli plant starts commercial production
Project milestone · Aerospace defence
Raymondfollow · Gudipalli aerospace plant starts commercial production by December 2027
Aerospace defence
Samhi Hotelsown · W Hyderabad opens
Project milestone · Hotels and Travels
Solex Energywait · Cell line commissioned
Project milestone · Solar PV Cells EPC
Subrospass · First electric-compressor supplies to Maruti
Project milestone · Industrials
Tempsens Instrumentswait · Unit 1 sensor plant commissioned
Project milestone · Industrials
Thomas Cook Indiawait · Sterling at 95-plus resorts and about 4,500 rooms
Project milestone · Travel Services
Yatharth Hospitalfollow · About 450 brownfield beds operational
Project milestone · Hospitals
Q4 FY28
110 pendingPending (110)
Aarti Pharmalabswait · Caffeine capacity above 80% used
Project milestone · Pharma CDMO
Action Const.Eq.follow · KATO joint venture adding meaningful revenue
Project milestone · Vehicles
Aditya Infotechwait · Capacity about double today's 2.5 million units a month
Project milestone · Industrials
Ador Weldingown · New consumable lines added this year and next
Project milestone · Industrials
Aegis Vopak Terminalswait · Liquid capacity close to 3 million cbm
Project milestone · Oil
Alivus Life Sciencesown · Reactor capacity reaches about 2,690 kL
Project milestone · Pharma API
Alpex Solarwait · Full 2.2 GW of cells for a year
Project milestone · Solar PV Cells EPC
Amara Raja Energyfollow · New energy at least 12% of FY28 consolidated revenue
Auto Related
Anthem Biosciencesfollow · Unit 4 Phase 1 commissioned
Project milestone · Pharma CDMO
Apollo Pipesavoid · Varanasi at 50–70% use in FY28
Project milestone · Plastics
Archean Chemical Industriespass · Decision on 40,000-tonne bromine expansion
Project milestone · Chemicals
Artemis Medicarefollow · Raipur breaks even (15–18 months from opening)
Project milestone · Hospitals
Atlanta Electricalsown · First 400 kV transformer revenue
Project milestone · Electrical Transformers
Borosilpass · Expanded furnace commissioned
Project milestone · Consumer Durables
Carborundum Univer.follow · Power-electronics substrates in production
Project milestone · Industrials
Carraro Indiafollow · Indian high-horsepower transmission programme enters production (by FY28)
Project milestone · Auto Related
CEATfollow · Chennai car line at 130 lakh tyres a year
Project milestone · Tyres
Centum Electronicswait · Centum's spending on the new plant begins
Project milestone · EMS & Electronics
Clean Max Env. Energfollow · EBITDA of at least ₹3,000cr in FY28
Project milestone · Solar PV Cells EPC
Cosmic CRFwait · Capacity of 1,75,000 tonnes
Project milestone · Industrial - Railway
Craftsman Automationwait · Hosur Unit 3 fully built out (five to six quarters from Jul 2026)
Project milestone · Auto Related
Craftsman Automationwait · Production for new stationary-engine orders starts
Project milestone · Auto Related
Cyientwait · Chip unit breaks even (slipped from late FY27)
Project milestone · Software
DCWpass · Phase 1 pigment capacity (+7,000 tonnes) completed
Project milestone · Chemicals
DCWpass · Captive power upgrade completed
Project milestone · Chemicals
DDev Plastiksown · First battery-storage assembly line running
Project milestone · Chemicals
DEE Developmentfollow · Anjar close to full use
Project milestone · Industrials
Deepak Nitritewait · Polycarbonate plant mechanically complete and Petronet's propylene start date confirmed
Chemicals
Dilip Buildconwait · Coal-handling plant complete (about 1.5 years)
Project milestone · Construction
Dynamic Cablesown · Reengus plant fully ramped up
Project milestone · Cables
Elecon Engg.Cofollow · ₹400cr programme completed
Project milestone · Electrical Equipment
Epigralown · New ECH at about 80% and CPVC at about 75% use
Project milestone · Chemicals
Epigralown · Full epoxy and multipurpose plant running
Project milestone · Chemicals
Everest Kanto Cylindpass · US expansion complete and adding sales
Project milestone · Industrials
Exide Industrieswait · Lithium subsidiary revenue at least ₹1,000cr in FY28, with a smaller loss than in FY27
Auto Related
Ganesh Consumer Prodwait · Darjeeling plant commissioned
Project milestone · Food Products
Ganesh Housingavoid · About ₹70–75cr of yearly rent
Project milestone · Realty
Garware Hi-Techfollow · Home solutions plus new products (PDLC, TPU items) above ₹200cr in FY28
Plastics
GRPpass · Further 30,000 tonnes of pyrolysis capacity added during FY28
Project milestone · Rubber
Happy Forgingswait · Forging capacity reaches 187,000 tonnes
Project milestone · Forging
Happy Forgingswait · Industrial at least 20% of revenue in a quarter
Forging
HBL Engineeringfollow · Defence and aviation segment above ₹300cr in FY28, showing fuze sales
Industrials
HBL Engineeringfollow · Electronics segment at or above ₹1,600cr in FY28, with new Kavach orders won during the year
Industrials
HEGwait · Anode revenue of ₹600–700cr in FY28
Project milestone · Elect and Refrac
Himadri Specialityfollow · Super-speciality black line producing
Project milestone · Chemicals
Himadri Specialityfollow · Passenger-car radial facility commissioned
Project milestone · Chemicals
ICE Make Refrig.avoid · Joint-venture plant starts production
Project milestone · Industrials
IG Petrochem.wait · Plasticiser at 50,000–65,000 tonnes a year
Project milestone · Chemicals
Insolation Energypass · Power revenue about ₹300cr in FY28
Project milestone · Solar PV Cells EPC
Isgec Heavy Engg.follow · Main phase complete (end 2027 or early 2028)
Project milestone · Industrials
Jash Engineeringfollow · Houston plant operational
Project milestone · Industrials
Jash Engineeringfollow · Saudi plant operational
Project milestone · Industrials
JG Chemicalswait · Dahej at 50–60% use for FY28
Project milestone · Chemicals
JTEKT Indiapass · Gujarat plant starts (early 2028)
Project milestone · Auto Related
Jupiter Wagonspass · Wheel line and full plant commissioned
Project milestone · Industrial - Railway
Jupiter Wagonspass · Odisha wheel line commissioned and first export wheels shipped
Industrial - Railway
Jupiter Wagonspass · Non-wagon businesses at least 35% of consolidated FY28 revenue
Industrial - Railway
Kaynes Technologywait · Chip packaging and bare boards at least 10% of FY28 revenue
EMS & Electronics
Kiri Industriesavoid · Copper rod plant commissioned
Project milestone · Chemicals
Kirloskar Oilwait · ₹1,400cr HHP capex spent and capitalised (two-year plan from May 2026)
Project milestone · Pumps Comp & Eng
Kirloskar Oilwait · FY28 consolidated revenue of about ₹11,000cr, the pace the ₹16,000cr FY30 aim needs
Pumps Comp & Eng
Kirloskar Pneumaticfollow · Zephyros ramps up to meaningful sales
Project milestone · Pumps Comp & Eng
KRN Heat Exchanwait · New plant at about 80% use; revenue about ₹2,000cr
Project milestone · Industrials
Krosswait · First outside sales of tubes
Project milestone · Auto Related
LT Foodsown · Ready-to-heat sales of about ₹300cr a year
Project milestone · Food Products
Mahindra Holi.&Resorwait · Theog resort opens
Project milestone · Hotels and Travels
Manaksia Coated Metalswait · Cold-rolling complex set up
Project milestone · Iron and Steel
Narayana Hrudayalayawait · HSR Bengaluru hospital commissioned
Project milestone · Hospitals
Neetu Yoshifollow · About ₹200cr a year from the new plant
Project milestone · Forging
NRB Bearingfollow · All major enhancement projects commissioned
Project milestone · Bearings
Orchid Pharmaavoid · 7-ACA plant at full use (hoped for within a year)
Project milestone · Pharma
Paramount Communicationspass · About ₹500cr of revenue from Narmadapuram in FY28
Project milestone · Cables
PCBL Chemicalwait · Commercial nano-silicon volumes begin
Project milestone · Chemicals
Railtel Corporation of Indiafollow · Data-centre revenue about ₹500cr
Project milestone · Software
Ramkrishna Forgingspass · Railways plus industry, mining and energy above 28% of standalone FY28 revenue (26% in FY26)
Auto Related
Ramkrishna Forgingspass · Consolidated FY28 revenue of at least ₹6,500cr, needed to keep the ₹8,000cr FY29 target alive
Auto Related
Raymondfollow · Any acquisition funded by the warrant money: what it adds to aerospace and at what price
Aerospace defence
RIR Power Electravoid · All ₹618cr of Odisha capex done
Project milestone · Electrical Equipment
RR Kabel Ltd.follow · Programme complete, able to make cables up to 220 kV
Project milestone · Cables
Saatvik Greenpass · Phase 2 completed
Project milestone · Solar PV Cells EPC
Sakar Healthcarewait · Bavla at 50–55% use
Project milestone · Pharma
Sansera Engineeringfollow · ADS revenue of ₹250cr or more in a single quarter
Aerospace defence
SG Martwait · Raipur coating line starts (about 18 months from July 2026)
Project milestone · Retail
Sh. Pushkar Chem.follow · Meghnagar complex commissioned
Project milestone · Chemicals
Shaily Engg. Plasticfollow · About 50 million pens in FY28
Project milestone · Plastics
Shaily Engg. Plasticfollow · Abu Dhabi plant begins commercial sales
Project milestone · Plastics
Shaily Engg. Plasticfollow · About 50 million pens delivered in FY28
Plastics
Shaily Engg. Plasticfollow · Abu Dhabi plant in production
Plastics
Shaily Engg. Plasticfollow · First contract with an original (innovator) drug maker announced
Plastics
Somany Ceramicswait · South tile plant operational
Project milestone · Consumer Durables
Steel Strips Wheelswait · Line fully in place (rest of the spend in FY28)
Project milestone · Auto Related
Steelcastown · New foundry commissioned (internal target 31 March 2028)
Project milestone · Forging
Sterling Toolswait · Tech-Mobility breaks even at about ₹70cr of revenue
Project milestone · Auto Related
Stylam Industriefollow · New plant sells ₹600–700cr in FY28
Project milestone · Consumer Durables
Subrospass · Second variant starts
Project milestone · Industrials
Suraksha Diagnosticwait · 100 centres open
Project milestone · Healthcare Diagnostic
Syrma SGS Tech.follow · Phases 2–3 of the circuit-board plant start
Project milestone · EMS & Electronics
Talbros Auto Compontown · Full-year revenue from the new forging business
Project milestone · Auto Related
Talbros Auto Compontown · Gujarat chassis plant online
Project milestone · Auto Related
Tarsons Productspass · ₹65–70cr of sales from new products for FY28
Project milestone · Health Products
Tatva Chintanwait · Jolva commercial production starts
Project milestone · Chemicals
TCPL Packagingfollow · Separator film in commercial production
Project milestone · Packaging
Time Technoplastown · Oil companies restart the 14.2-kg composite LPG cylinder or place a large new tender
Plastics
Titagarh Railsystemswait · New metro orders of at least ₹2,000cr booked to keep the line full in FY29
Industrial - Railway
Titagarh Railsystemswait · Passenger revenue above ₹2,000cr in FY28
Industrial - Railway
Viceroy Hotelswait · Phase 3 renovation complete
Project milestone · Hotels and Travels
Vishnu Chemicalsfollow · DMSO commercial production starts
Project milestone · Chemicals
Voltamp Transformerswait · Karjan dry-type plant starts (promised during FY28)
Project milestone · Electrical Transformers
Voltaswait · Compressor plant starts commercial production (about 18 months after work begins)
Project milestone · Consumer Durables
Yasho Industrieswait · Phase 2 building producing
Project milestone · Chemicals
Q1 FY29
6 pendingPending (6)
Century Plyboards(I)wait · UP plywood plant starts (April 2028, only if land is secured)
Project milestone · Consumer Durables
Dhanuka Agritechwait · Nagpur plant operational
Project milestone · Agrochemical & Fertilizers
Genus Powerwait · ₹600–700cr more invested in the platform
Project milestone · Electrical Equipment
ION Exchagewait · Oman build-out spending complete
Project milestone · Utilities
Standard Glassavoid · Whole campus complete
Project milestone · Industrials
Studds Accessoriesfollow · Phase 2 in production, 15–18 months after phase 1
Project milestone · Auto Related
Q2 FY29
10 pendingPending (10)
Advait Energyavoid · Dholera complex fully operational
Project milestone · Cables
Digilogic Systemspass · Udaan plant starts production
Project milestone · Aerospace defence
EIHfollow · Oberoi Grand Kolkata partly reopens (September 2028)
Project milestone · Hotels and Travels
LMWwait · Aerospace building finished (18–24 months from July 2026)
Project milestone · Industrial Machinery
Paradeep Phosphateswait · Aluminium fluoride plant commissioned
Project milestone · Agrochemical & Fertilizers
Pricolfollow · ₹700cr programme complete, 18–24 months from Aug 2026
Project milestone · Auto Related
Privi Speciality Chewait · Capacity at about 72,000 tonnes
Project milestone · Chemicals
Servotech Renewavoid · Battery capacity 10 times today's
Project milestone · Electrical Equipment
SKF India (Industrial)wait · New Pune plant starts operating
Project milestone · Bearings
Sumitomo Chemical Indiawait · Revenue from the Dahej plant begins
Project milestone · Agrochemical & Fertilizers
Q3 FY29
6 pendingPending (6)
Divgi Torqtransferpass · US plant commissioned (H2 CY2028 at the earliest)
Project milestone · Auto Related
Ester Industriespass · ELITe plant operating
Project milestone · Packaging
Kiri Industriesavoid · Copper refinery commissioned
Project milestone · Chemicals
SG Martwait · 16 service centres working (company slides, by 2028)
Project milestone · Retail
SKF India (Industrial)wait · All lines ramped up and moved to the new plant
Project milestone · Bearings
Supreme Petrochemwait · Fifth polystyrene line completed
Project milestone · Chemicals
Q4 FY29
19 pendingPending (19)
Apollo Tyresown · Full added capacity in place
Project milestone · Tyres
Artemis Medicarefollow · South Delhi first phase commissioned
Project milestone · Hospitals
Blue Jet Healthcarewait · First revenue from Vizag
Project milestone · Pharma API
Deepak Nitritewait · Polycarbonate plant starts up
Project milestone · Chemicals
Emmvee Photovoltaic Power Ltdfollow · First 5 GW of ingots and wafers running
Project milestone · Solar PV Cells EPC
Gravita Indiaown · Installed capacity over 8 lakh tonnes
Project milestone · Mining & Metals Recycle
Himadri Specialityfollow · Full 40,000-tonne Phase 1 running
Project milestone · Chemicals
JK Tyre & Industwait · Whole ₹6,110cr expansion programme complete
Project milestone · Tyres
Kansai Nerolacfollow · Three-site expansion complete (phased over FY28–FY29)
Project milestone · Consumer Durables
Maxvolt Energy Indusavoid · First 5 GWh running
Project milestone · EMS & Electronics
Paramount Communicationspass · Narmadapuram revenue reaches about ₹1,200cr
Project milestone · Cables
Powericafollow · Owned wind capacity reaches about 638 MW
Project milestone · Pumps Comp & Eng
Saatvik Greenpass · Phase 3 completed
Project milestone · Solar PV Cells EPC
Shyam Metalicsfollow · Hot strip mill commissioned (FY28–FY29 schedule)
Project milestone · Iron and Steel
Shyam Metalicsfollow · Stainless flat plant commissioned (FY28–FY29 schedule)
Project milestone · Iron and Steel
South West Pinnaclefollow · First coal from the Jharkhand block
Project milestone · Oil
Sunteck Realtyfollow · Rent reaches about ₹450cr a year
Project milestone · Realty
Vikram Solarpass · Wafer plant running
Project milestone · Solar PV Cells EPC
Vikram Solarpass · LFP battery-cell plant running
Project milestone · Solar PV Cells EPC
Q1 FY30
1 pendingPending (1)
Pitti Engineeringown · Hyderabad plant commissioned
Project milestone · Industrials
Q4 FY30
1 pendingPending (1)
Amara Raja Energyfollow · 16 GWh of cell capacity in place
Project milestone · Auto Related
Q4 FY31
1 pendingPending (1)
CEATfollow · Full 53,000-tyre-a-day capacity built
Project milestone · Tyres